![Fleurco Platinum Cube PMQ3232-11-40-79 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/fleurco/platinum-cube-pmq3232-11-40-79/platinum-cube-pmq3232-11-40-79_instruction-manual_2303856006.webp)
6
TOP VIEW
VUE DU HAUT
MIN
MAX
( DIM B )
MIN
MAX
( DIM A )
MODEL
MODÈLE
DIM A =
FRONT OPENING
DIM A =
OUVERTURE DU DEVANT
DIM B =
SIDE OPENING
DIM B =
OUVERTURE DU CÔTÉ
MIN
MAX
MIN
MAX
3232
29
⅛″
29
½″
29
⅞″
30 ⅜″
3236
29
⅛″
29
½″
33 ¼
"
33 ¾
"
3242
29
⅛″
29
½″
39 ¼
"
39 ¾
"
3248
29
⅛″
29
½″
45
⅞″
46
⅜″
3632
3
3 ⅛″
33 ½″
29
⅞″
30
⅜″
3636
33
⅛″
33 ½″
33 ¼
"
33 ¾
"
3642
3
3 ⅛″
33 ½″
39 ¼
"
39 ¾
"
3648
3
3 ⅛″
33 ½″
45
⅞″
46
⅜″
RECOMMENDED AREA FOR
SHOWER DOOR INSTALLATION.
ZONE RECOMMANDÉE POUR
L’INSTALLATION DE LA PORTE DE DOUCHE.
(DIM B)
(DIM A)
ENSURE THE CENTER LINE FOR HINGE INSTALLATION IS
PLACED ON A WALL STUD.
S'ASSURER QUE LA LIGNE CENTRALE POUR LA MONTAGE
DES CHARNIÈRES EST PLACÉ SUR UN MONTANT MURAL.
THE INSTALLATION SHOWN IS BASED ON
PLUMB FINISHED WALLS AND A LEVELLED
BASE. IF THESE CONDITIONS ARE NOT MET,
PLEASE ADJUST ACCORDINGLY.
L’INSTALLATION ILLUSTRÉE EST BASÉE SUR
DES MURS FINIS D’APLOMB ET UNE BASE DE
DOUCHE NIVELÉE. SI CES CONDITIONS NE
SONT PAS PRÉSENTÉES, VEUILLEZ AJUSTER
EN CONSÉQUENCE.
MARK THE PLACEMENT AREA ON THE BASE /
MARQUER LA ZONE DE POSITIONNEMENT SUR LA BASE
MARK THE CENTER LINE
/
MARQUER LA LIGNE DU CENTRE
1
2