Flame Energy XTD 1.9 FL045W Скачать руководство пользователя страница 1

READ AND KEEP THIS MANUAL FOR REFERENCE 

 

45550A 

Printed in Canada 

11-06-2015 

 

 

 

Installation and Operation Manual 

XTD 1.9 

(FL045W model)

 

 

US ENVIRONMENTAL PROTECTION 

AGENCY PHASE II CERTIFIED 

WOOD STOVE 

 

Safety tested according to ULC S627, UL 737 

and UL 1482 Standards  

by an accredited laboratory 

 

 

 

www.flame-intl.com 

Stove Builder International Inc. 

250, rue de Copenhague, St-Augustin-de-Desmaures 

(Quebec) Canada  G3A 2H3 

After-sale service: 418-908-8002    E-mail: [email protected] 

 

 

 

This  manual  is  available  for  free  download  on  the  manufacturer’s  web  site.  It  is  a 
copyrighted  document.  Re-sale  is  strictly  prohibited.  The  manufacturer  may  update  this 
manual  from  time  to  time  and  cannot  be  responsible  for  problems,  injuries,  or  damages 
arising out of the use of information contained in any manual obtained from unauthorized 
sources. 

Содержание XTD 1.9 FL045W

Страница 1: ...ve Builder International Inc 250 rue de Copenhague St Augustin de Desmaures Quebec Canada G3A 2H3 After sale service 418 908 8002 E mail tech sbi international com This manual is available for free do...

Страница 2: ...nstalled a house fire may result To reduce the risk of fire follow the installation instructions Contact local building or fire officials about restrictions and installation inspection requirements in...

Страница 3: ...d 11 3 2 How to Prepare or Buy Good Firewood 11 3 2 1 What is Good Firewood 11 3 2 2 Tree Species 11 3 2 3 Log Length 12 3 2 4 Piece Size 12 3 2 5 How to Dry Firewood 12 3 2 6 Judging Firewood Moistur...

Страница 4: ...stallation 27 7 Clearances to Combustible Material 28 7 1 Location of the Certification Label 28 7 2 Clearances to Walls and Ceiling 28 7 3 Floor Protector 31 7 3 1 Shield Construction Rules 31 7 4 Re...

Страница 5: ...Appendix 1 Installing the Optional Fresh Air Intake Kit AC01336 42 Appendix 2 Installing the Optional Fire Screen AC01315 44 Appendix 3 Installation and Use of the Optional Blower and Thermodisc 45 Ap...

Страница 6: ...DURING LIGHTING PROCEDURES OR RELOADING ALWAYS CLOSE THE DOOR OR PUT BACK THE FIRE SCREEN AFTER IGNITION DO NOT LEAVE THE STOVE UNATTENDED WHEN THE DOOR IS OPENED WITH OR WITHOUT FIRE SCREEN NEVER US...

Страница 7: ...76 kg Firebox Volume 2 4 cu ft 0 068 m3 Maximum Log Length 20 east west Flue Outlet Diameter 6 150 mm diameter vertical Baffle Material Vermiculite Burn time and heating capacity may vary subject to l...

Страница 8: ...XTD 1 9 Installation and Operation Manual 8...

Страница 9: ...of your house to an adequate temperature we strongly recommend that you also have a conventional oil gas or electric heating system to provide back up heating Your success with zone heating will depe...

Страница 10: ...be recycled Vermiculite is used for the baffle Vermiculite is a mineral Large commercial mines exist in China Russia South Africa and Brazil Potassium silicate is used as binder to form a rigid board...

Страница 11: ...e birch and poplar other low density species to burn and yet they can heat their homes successfully Homeowners with access to both hardwood and softwood fuel sometimes use both types for different pur...

Страница 12: ...when dried unsplit logs are difficult to ignite because they don t have the sharp edges where the flames first catch Logs as small as 3 75 mm should be split to encourage drying Wood should be split t...

Страница 13: ...pieces split pieces dry more quickly than unsplit rounds softwoods take less time to dry than hardwoods softwoods like pine spruce and poplar aspen can be dry enough to burn after being stacked in th...

Страница 14: ...wood dry wood is much lighter in weight than wet wood split a piece and if the fresh face feels warm and dry it is dry enough to burn if it feels burn a piece wet wood hisses and sizzles in the fire...

Страница 15: ...porize The vapors are not poisonous but they do smell bad Fresh paint fumes can also cause false alarms in smoke detectors So when you first light your stove be prepared by opening doors and or window...

Страница 16: ...as mostly burned you can add standard firewood pieces until you have a fire of the right size for the conditions 4 3 2 The Top Down Fire The top down fire starting method solves two problems with the...

Страница 17: ...ignited and for its temperature to gradually decline as the fire progresses This rising and falling of temperature can be matched to your household routines For example the area temperature can be co...

Страница 18: ...r waste shall not be placed in this container NEVER STORE ASHES INDOORS OR IN A NON METALIC CONTAINER OR ON A WOODEN DECK 4 4 3 Raking Charcoal Rekindle the fire when you notice that the room temperat...

Страница 19: ...so that the space begins to cool off a little before loading Letting the space cool before loading is one of the secrets to clean burning and effective zone heating 4 4 5 Turning Down the Air Supply...

Страница 20: ...Sometimes you will want to build a fire to last up to eight hours but don t need intense heat In this case use soft wood species and place the logs compactly in the firebox so the pieces are packed ti...

Страница 21: ...o build a smaller fire that might provide three or four hours of heating than to fully load the firebox for a much longer burn Shorter burn cycles make it easier to match the heat output of the stove...

Страница 22: ...a damp cloth or paper towel and then drying Never try to clean the glass when the stove is hot In spring and fall when the stove is run at lower temperatures you may see some light brown stains formin...

Страница 23: ...tightness can be improved with a simple latch mechanism adjustment To increase the pressure on the gasket remove one washer A To reduce pressure on the door when putting a new door gasket for example...

Страница 24: ...asket groove Starting from the middle of the hinge side press the gasket into the groove Do not stretch the gasket as you place it Leave the gasket about 1 2 long when you cut it and press the end int...

Страница 25: ...ces If the paint becomes scratched or damaged you can give your wood stove a brand new look by repainting it with heat resistant paint Before painting roughen the surface with fine sand paper wipe it...

Страница 26: ...chimneys you might want to hire a professional chimney sweep to clean and inspect the system for the first time After having seen the cleaning process you can decide if it is a job you would like to...

Страница 27: ...IANCE MAY BE INSTALLED IN A MOBILE HOME THIS MOBILE HOME APPROVED STOVE REQUIRES INSTALLATION OF A FRESH AIR KIT SOLD SEPARATELY WARNING DO NOT INSTALL IN SLEEPING ROOM WARNING THE STOVE MUST BE ATTAC...

Страница 28: ...it in order to have a safe and compliant installation In addition you will find information about your stove model serial number etc You can find the certification label on the back of the stove 7 2...

Страница 29: ...76 193 cm 76 193 cm CLEARANCES DOUBLE WALL PIPE CANADA USA A 8 203 mm 8 203 mm B 17 432 mm 17 432 mm C 9 229 mm 9 229 mm D 11 298 mm 11 298 mm E 27 686 mm 27 686 mm F 19 495 mm 19 495 mm K 48 1220 mm...

Страница 30: ...XTD 1 9 Installation and Operation Manual 30 Clearances to combustible materials and floor protection...

Страница 31: ...2 Only required under the horizontal section of the connector Must exceed each side of the connector by at least 2 inches 51 mm 7 3 1 Shield Construction Rules 1 Minimum space behind shield 25 mm 1 in...

Страница 32: ...stallation takes up less floor space You can safely reduce the minimum clearances by permanently installing a shield between the stove and combustible material The rules for safe shields can be compli...

Страница 33: ...tible material on non combustible board spaced out at least 25 mm 1 in by non combustible spacers 50 33 Ceramic tiles or equivalent non combustible material on non combustible board with a minimum of...

Страница 34: ...that draws in combustion air keeps smoke inside the stove and safely vents exhaust to outside You can think of heat in the flue gas as the fuel the chimney uses to make draft 8 2 Suitable Chimneys Yo...

Страница 35: ...from the top of the stove To maintain an effective vapour barrier insulation and waterproof chimney and outside flue pipe mobile home roof flashing and seal it with silicone XTD 1 9 Installation and O...

Страница 36: ...e the highest point of contact with the roof and at least 60 cm 2 ft higher than any roof line or obstacle within a horizontal distance of 3 m 10 ft XTD 1 9 Installation and Operation Manual cted to a...

Страница 37: ...lled up through the heated space of the house not out and up an outside wall Second the chimney should penetrate the top of the building at or near the highest heated Inside Chimneys Are Preferred Ven...

Страница 38: ...urning in the stove First the chimney runs up the outside of the house so the air in it is colder and denser than the warm air in the house And second the chimney is shorter than the heated space of t...

Страница 39: ...wood stove may not have adequate access to combustion air is if the operation of a powerful exhaust device such as a kitchen range exhaust causes the pressure in the house to become negative relative...

Страница 40: ...ed the weak link in the safety of wood heating systems because failure to install the connector properly which has been common in the past can result in house fires The best flue pipe assembly is one...

Страница 41: ...an inspection wrap with one end unfastened or a telescopic section Minimum upward slope towards the chimney 20 mm m 1 4 in ft One end of the assembly must be securely fastened to the flue collar with...

Страница 42: ...nual 42 Appendix 1 Installing the Optional Fresh Air Intake Kit AC01336 This mobile home approved stove requires installation of a fresh air kit A and an insulated fresh air intake pipe B sold separat...

Страница 43: ...XTD 1 9 Installation and Operation Manual 43 Installation on the bottom AC01336...

Страница 44: ...opening Lean the upper part of the fire screen against the top door opening making sure to insert the top fire screen brackets behind the primary air deflector as in Detail A Lift the fire screen upwa...

Страница 45: ...stove that is undersized for the space it is intended to heat You can purchase this option through your FLAME dealer Make sure to specify this part number AC03095 When using the optional blower allow...

Страница 46: ...allation and Operation Manual 46 CAUTION ENSURE THAT THE BLOWER S POWER CORD IS NOT IN CONTACT WITH ANY SURFACE OF THE STOVE TO PREVENT ELECTRICAL SHOCK OR FIRE DAMAGE DO NOT RUN THE POWER CORD BENEAT...

Страница 47: ...Then lift and insert the left end of the tube into the rear left channel 2 Align the notch in the left end of the tube with the key of the left air channel hole Using a Wise grip hold the tube and lo...

Страница 48: ...r tubes A can be replaced without removing the baffle board B Important Notes The air tubes are identified for placement as follows Model Type of tube XTD 1 9 Front 30 holes of 0 147 Middle front 30 h...

Страница 49: ...XTD 1 9 Installation and Operation Manual 49 Appendix 5 Exploded Diagram and Parts List...

Страница 50: ...PAN QUADREX ZINC 2 11 AC06500 SILICONE AND 5 8 X 8 BLACK GASKET KIT 1 12 30055 HINGE PIN RETAINING RING 5 16 ID X 0 512 OD 2 13 30169 DOOR HINGE PIN 5 16 DIA X 1 3 4 LONG 2 14 SE55103 01 CERAMIC GLASS...

Страница 51: ...1 45 44080 RHEOSTAT WITH NUT 1 46 44087 RHEOSTAT NUT 1 47 44085 RHEOSTAT KNOB 1 48 AC05530 THERMODISC KIT 1 49 44046 THERMODISC F110 20F 1 50 21387 TOP AIR DEFLECTOR INSULATION 1 51 PL65505 TOP AIR DE...

Страница 52: ...the defect The manufacturer may at its discretion fully discharge all obligations with respect to this warranty by refunding the wholesale price of any warranted but defective parts The manufacturer...

Отзывы: