
When connecting cables as stated in Step 13, use this guide
as a reference.
Connect the cables from the Lift Columns to the cables
provided. The other end should be connected to the Control
Box. Repeat this for each leg.
Connect the end of the Controller cable into the Control Box.
Follow Steps 13, 14, 15 & 18 to complete the wiring installation.
Once you have completed the wiring, use the Wire
Management Cableways to hold all the cables and minimize
possible entanglements.
NOTE:
Cableways and vertical wire management solutions are
also available from Details. Contact us for more information.
Installation Instructions
005720D Rev D
Page 20 of 20
Series 7 AdjusTables
w
w
w
.
d
e
t
a
i
l
s
-
w
o
r
k
t
o
o
l
s
.
c
o
m
FitWork
™
Sit-to-Walkstation
Wiring Guide
1
2
3
4
5
ATTACHMENT
PLATE
FOOT
GLIDES
CONTROL BOX
• Never
attach wires to the
legs or stretcher in any way.
CONTROL
RIGHT LIFT
COLUMN
LEFT LIFT
COLUMN