12
IMPORTANT
PLEASE READ ALL INSTRUCTIONS CAREFULLY BEFORE ASSEMBLING
FIGURE 1
Step 1.
Step 2.
Step 3.
Step 4.
Step 5.
Step 6.
Step 7.
Push 2” SQUARE END PLUGS (71) into ends of RIGHT BASE BEAM (1), LEFT BASE BEAM
(6), and LEFT OBLIQUE FRAME (4).
Attach CENTER BASE TUBE “A” (7) to RIGHT BASE BEAM (1) and LEFT BASE BEAM (6) with
3/8” x 2-5/8” HEX BOLTS (53), 3/8” WASHERS (62) and 3/8” LOCKNUTS (67).
NOTE: Do not tighten LOCKNUTS until CENTER BASE TUBE “B” has been attached.
Slide RIGHT VERTICAL FRAME (3) onto RIGHT BASE BEAM (1) and attach with CENTER BASE
TUBE “B” (8) using 3/8” x 3” HEX BOLTS (54), 3/8” WASHERS (62) and 3/8” LOCKNUTS (67).
Slide LEFT VERTICAL FRAME (5) onto LEFT BASE BEAM (6) and attach with CENTER BASE
TUBE “B” (8) using 3/8” x 3” HEX BOLTS (54), 3/8” WASHERS (62) and 3/8” LOCKNUTS (67).
Tighten 3/8” LOCKNUTS (67) attached in Step 2.
Attach RIGHT OBLIQUE FRAME (2) to RIGHT BASE BEAM (1) with 3/8” x 2-5/8” HEX BOLTS
(53), 3/8” WASHERS (62) and 3/8” LOCKNUTS (67).
Attach LEFT OBLIQUE FRAME (4) to LEFT BASE BEAM (6) with 3/8” x 2-5/8” HEX BOLTS (53),
3/8” WASHERS (62) and 3/8” LOCKNUTS (67).