background image

So Many Ways to Play!

•  Remove the supports for a ground-

level bridge.

•  The toll gate lifts and lowers.

Multiple Levels 

of Track Layouts!

1

•  To build a ground-level layout, separate the span 

assembly from the supports and place the span 
assembly on the floor.

•  Attach straight tracks (sold separately) to either 

end of the span assembly.

Track not included.

2

•  Use supports and straight tracks (sold 

separately) to build an elevated assembly.

3

•  Use an Elevation Track Pack

 (sold separately) 

to access the suspension bridge.

•  Attach ramp assemblies (sold separately) to 

the ends of the span.

Отзывы: