3
Assembly
• Position the base on a flat surface.
• Firmly snap the entrance gate, an elevator gate, the gas pump
sign and the gas pump hose into the base, as shown.
• Set the base aside.
• Turn the center floor upside down.
• Fit the holes on the drawer guides onto the pegs on the bottom
of the center floor. Make sure the drawer guides are pushed
down fully.
• Insert a
3
/
4
" screw into each of the four holes in the drawer
guides. Tighten the screws with a Phillips screwdriver. Do not
over-tighten.
• Set the center floor aside.
Base
Elevator Gate
Narrow
Switching
Gate
Top Floor
Elevator
Gate
Entrance Gate
Gas Pump Hose
Gas Pump
Sign
Drawer
Guides
Pegs
Hole
Hole
Pegs
Hole
Hole
Center Floor
Bottom View
IMPORTANT NOTE! Please read these instructions
carefully and follow the assembly steps in order. The
Big Action Garage will not assemble correctly out of order
and you may be unable to remove or disconnect parts to
correct the assembly.
• Position the top floor on a flat surface.
• Firmly snap the elevator gate into the top floor, as shown.
• Insert the narrow (top floor) switching gate into the recess in the
top floor.
• Press down firmly on the narrow switching gate so that it is fully
inserted into the top floor.
• Set the top floor aside.
• Position the center floor on a flat surface.
• Firmly snap an elevator gate into the center floor, as shown.
• There are two switching gates. Separate the wide (center floor)
switching gate from the narrow (top floor) switching gate.
• Insert the wide (center floor) switching gate into the recess in
the center floor.
• Press down firmly on the wide switching gate so that it is fully
inserted into the center floor.
Wide Switching
Gate
Elevator Gate
Center Floor
1
2
3
4
3
/
4
" Screw
3
/
4
" Screws
3
/
4
" Screw