7
CLEARANCE SPECIFICATIONS
0° Installation
Minimum clearances to
combustible
material:
PROFILE
10 1/4"
7 3/4"
min 96"
min 120"
min 16"
min 21"
1/2"
conduit*
gas
pipe*
drip leg
with
1/8" NPT
plugged
test gage
connection
utilize 2 bolts
(min) per bracket
utilize 2 bolts
(min) per bracket
gas
shut-off
valve*
*Installer supplied.
4 bolts*
(two on
each side)
Non-combustible surface* (required)
Combustible Surface
Flooring
Non-combustible surface*
or combustible surface
Содержание DCS DRH-48N
Страница 1: ...INSTALLATION GUIDE USER GUIDE US CA 238042E 10 19 PROFESSIONAL BUILT IN PATIO HEATER DRH 48N model...
Страница 2: ......
Страница 22: ......
Страница 23: ......
Страница 24: ...GUIDE D INSTALLATION GUIDE D UTILISATION US CA 238042E 10 19 CHAUFFERETTE PROFESSIONNELLE Mod le DRH 48N...
Страница 25: ......