Seite/Page 30 - Kaptitel/Chapter 3:
23.3.18
3.5.4.2 Arrangements after a long-term standstill (shutdown) / recommissioning (more
than 6 months):
• Check the charge of battery and recharge if necessary. Consider the specifications of the battery manufacturer.
• Check anti-freeze protection and level of the cooling water and refill if applicable.
• Drain engine oil. Renew oil filter and oil according specification.
• Remove preservation agent of the engine with petroleum.
• Degrease the v-belt pulleys and install v-belt correctly. Check v-belt tension!
• Disconnect turbocharger oil pressure line if existent and refill clean motor oil in pipe.
• Keep engine shut-off lever in 0-position and turn engine several times by hand.
• Clean air filter housing with petroleum, check air filter and renew if necessary.
• Remove covers of the exhaust opening and the suction holes.
• Connect battery. Close battery main switch.
• Install impeller.
• Open sea cock.
• Check sea water filter.
• Keep shut-off lever at generator in 0-position and activate starter for approx. 10 sec. Make a break for 10 sec. and
repeat procedure twice.
• Visual inspection of the generator according to initial operation and start generator.
Notice:
Fischer Panda recommendation:
After a long-term standstill a complete 150 h inspection
according to inspection schedule should be carried out.