FIRST TEAM SPORTS INTRUDER EZ-CRANK Скачать руководство пользователя страница 1

FIRST TEAM SPORTS, INC. 

INTRUDER™ EZ-CRANK 

PORTABLE BASKETBALL GOAL 

ASSEMBLY INSTRUCTIONS 

(revised 08/20/10) 

 

Содержание INTRUDER EZ-CRANK

Страница 1: ...FIRST TEAM SPORTS INC INTRUDER EZ CRANK PORTABLE BASKETBALL GOAL ASSEMBLY INSTRUCTIONS revised 08 20 10...

Страница 2: ...URCHASE CONCRETE 1 Unpack all components and cross check against bill of materials to make sure all parts and hardware are included If any parts are missing call First Team toll free 1 888 884 6677 im...

Страница 3: ...the top of the LOWER POST Using a level check the LOWER POST to make sure it is vertical front to back and side to side Also make certain that the LOWER POST does not sink into the concrete The 8 mark...

Страница 4: ...POST section to the MID POST section and secure using 1 3 8 x 3 5 hex bolt 2 3 8 flatwashers and 1 3 8 locknut BE CERTAIN TO INSERT BOLT WITH BOLT THREADS PROTRUDING OUT THE BACK SIDE OF POST AWAY FR...

Страница 5: ...1 5 16 locknut as shown 22 Attach upper end of ACTUATOR to LOWER ARMS using 1 x 7 hex bolt 2 flat washer 1 locknut and 2 CRANK SPACER 7 8 NOTE ARM SPACERS are sandwiched BETWEEN the LOWER ARMS and the...

Страница 6: ...lts 4 flat washer and 2 5 16 lock nut attach FLEX GOAL BOTTOM HOLES to BACKBOARD and BACKBOARD MOUNT 28 Next using 2 5 16 x 5 8 hex bolts and flatwashers secure left and right top sides of BACKBOARD M...

Страница 7: ...ened adequately NOT TOO TIGHT 25 Place POST CAP on top of post 26 Place ACTUATOR CAP on top of ACTUATOR 26 Hang net Congratulations Assembly of your INTRUDER E Z crank adjustable basketball goal is co...

Страница 8: ......

Отзывы: