background image

 

 

 

STEP 12: 

For the OXY2 set the Timer Control (Figure 4a) by rotating the Skipper Wheel (Figure 4a) so 
the red pointer is directly over day 1.  Select the days when backwashing will occur by sliding 
the metal tabs in or out.  IN indicates no backwashing will occur on that day, OUT indicates 
that backwashing will occur on that day.  

Factory setting is to initiate backwash every third 

day.

   

 

For the OXY2E proceed to STEP 13. 

 

STEP 13:

 

Set the current time of day. For the OXY2 start by depressing the red Time Set Button (Figure 
4a) and turning the 24 Hour Gear (Figure 4a) to the desired time (note AM and PM).  

 

For the OXY2E refer to OXY2E Series Setting Time of Day on page 11.  

 

STEP 14: 

Time of Regeneration is factory set to 1:00 A.M.  To adjust the time of regeneration for OXY2:  

a)  Unplug control valve from electrical outlet 

b)  Locate  three  screws  (Figure  4b,  page  6)  behind  the  Manual  Backwash  Knob 
(Figure  4a,  Page  6)  by  pushing  the  red  Time  Set  Button  (Figure  4a,  page  6)  and 
rotating the 24 Hour Gear (Figure 4a, page 6) until each screw appears in the cut out 
portion of the Manual Backwash Knob.  

c) Loosen each screw slightly to release pressure on the 24 Hour gear time plate. 

d)  Continue  depressing  the  red  Time  Set  Button  and  rotate  the  24  Hour  Gear  to 
expose the Regeneration Time Pointer (Figure 4a, page 6) in the cut out portion of the 
Manual Backwash Knob.  Keep the Regeneration Time Pointer visible in the cut out 
while rotating only the time plate until the desired time of regeneration (note AM and 
PM) is aligned with the Regeneration Time Pointer.  

NOTE: subtract 136 minutes from 

the  desired  time  for  the  start  of  backwash  to  determine where  the  Regeneration  Timer 
Pointer should point.

 

e) Continue depressing the red Time Set Button and rotate the 24 Hour Gear along 
with the Time Plate until each screw has been exposed in the cut out portion of the 
Manual  Backwash  Knob  and  re-tightened.  DO  NOT  OVERTIGHTEN.  Make  certain 
that  the  backwashing  filter  DOES  NOT  regenerate  at  the  same  time  with  any  other 
water treatment equipment. 

 

 

To adjust the time of regeneration for the OXY2E see Programming on Page 12. 

 

STEP 15:

 

Turn power or fuel supply back on to water heater. 

 

STEP 16:

 

When the water flowing to drain is clear, plug the control valve back into the electrical outlet 
and verify the Time of Day is correct.  Adjust Time of Day if necessary (see Step 13). 

Installation Instructions (cont.) 

Содержание OXY2-10

Страница 1: ...s LLC 12630 US Highway 33 N Churubusco IN 46723 Phone 260 693 1972 Fax 260 693 0602 OXY2 OXY2E Instruction Manual 180122 docx OXY2 OXY2E Series Iron Reduction System Installation Instructions and Owne...

Страница 2: ...ng Time of Day Page 11 OXY2E Programming Page 12 Specifications Page 13 Component Parts Breakdown List Page 14 OXY2 Control Valve Breakdown Page 15 OXY2 Control Valve Parts List Page 16 OXY2E Control...

Страница 3: ...ither clear water ferrous state red water ferric state or bacterial form The OXY2 iron filter can reduce any of these forms of iron Manganese A naturally occurring metallic element Manganese concentra...

Страница 4: ...optimum filter performance and satisfactory water quality The following factors should be considered in selecting the location of the iron filter 1 The filter should be installed after the pressure t...

Страница 5: ...e ground leg of the electric supply continuity should be maintained by installing ground straps around any non conductive plastic piping or bypass used in the installation Make sure the filter is not...

Страница 6: ...with silicone lubricant and screw the control valve onto the filter tank STEP 6 Shut off water at main supply Relieve pressure by opening nearest faucet On private well systems turn off power to pump...

Страница 7: ...the Service position Figure 3 page 4 STEP 11 Remove media fines by manually initiating regeneration For the OXY2 turn the manual backwash knob Figure 4 page 8 clockwise until the drive gear engages t...

Страница 8: ...each screw slightly to release pressure on the 24 Hour gear time plate d Continue depressing the red Time Set Button and rotate the 24 Hour Gear to expose the Regeneration Time Pointer Figure 4a page...

Страница 9: ...ts a day The number by the red pointer is tonight 3 Slide the metal tabs outward on the desired days of regeneration The OXY2 Filter should be set to backwash a minimum of every third day How to Manua...

Страница 10: ...by shifting both the backwash pins and air draw holes an equal number of positions counter clockwise on the program wheel 4 AIR DRAW cycle may be lengthened by increasing the number of holes between...

Страница 11: ...seconds to initiate an immediate regeneration cycle 2 Press and release Advance Button during a regeneration cycle to immediately advance the valve to the next step in the regeneration process 3 When...

Страница 12: ...Use Up Button to set current hour Use Up Button to set current minute Use Up Button to set AM PM Default setting is 20 GPG This iron filter does not meter the water use Adjusting the water hardness s...

Страница 13: ...egenerating Use Up Button to set minutes for time of backwash Use Up Button to set AM or PM for time of backwash The DEFAULT setting is not used for OXY2E iron filters and must be set to OFF Default c...

Страница 14: ...ME cu ft 1 0 2 0 GRAVEL UNDERBED lbs 20 30 SERVICE FLOW RATES gpm Continuous 5 gpm ft 2 gpm 3 5 Peak 16 gpm ft 2 gpm 9 13 PRESSURE LOSS 1 psi Continuous Flow Rate 5 7 Peak Flow Rate 10 13 REGEN FLOW R...

Страница 15: ...k Control Valve includes bypass valve OXY2E 10 Vlv Assy W BP OXY2E 20 Vlv Assy W BP Complete Electronic Control Valve includes bypass valve 2 D100S 54 Distributor Tube 1 x 54 3 MTP1054N MTP1354N Miner...

Страница 16: ...15 OXY2 Control Valve Breakdown...

Страница 17: ...ton Assembly 19 13304 Distributor O Ring 121 H FV2510 1PH Power Head Assembly 2510 TC with Cover 20 13030 Distributor Retainer I 60050 21 Drive Motor Assembly Not Shown 40027 J tube for 2510 valve Old...

Страница 18: ...17 OXY2E Control Valve Breakdown...

Страница 19: ...19936 Base Seal 2510 H 60160 10 Drive Cam Assembly STF 16 19322 2510 Adapter Base I 60308 13 2510E Timer Assembly 17 19197 Slip Ring J 60011 050ASSY Brine Valve 1650 Short Stem 0 5 BLFC with Tube 18...

Страница 20: ...eded 2 Replace spacers and seals 3 Verify distributor tube seated securely in control valve body 4 Verify actual water usage flow rates against system specifications 5 Verify adequate pumping rate for...

Страница 21: ...ly C Debris in control valve D Internal leak in control valve E Drive motor faulty 1 Ensure electrical outlet is functioning 2 Verify timer programming 3 Disassemble and clean control valve 4 Replace...

Страница 22: ...21 Control Valve Wiring...

Страница 23: ...unction occur contact the dealer that you purchased the product from If you are unable to contact the dealer contact First Sales LLC 260 693 1972 We will require a full description of the problem mode...

Отзывы: