First Office COACT Скачать руководство пользователя страница 5

RUNOFF TABLE INSTALLATION

INSTALLATION INSTRUCTIONS

COACT

1. 

Begin by placing the worksurface on a flat non-marring surface, making sure the pre-

drilled holes are facing up. Next, place the worksurface brackets onto the worksurface 

and align the mounting holes to the pre-drilled holes. Fasten the brackets down using 

the supplied screws from the HK-125 kit, making sure every mount hole is utilized.

2.  Next, place the table base onto the worksurface. Depending on which base style was 

chosen, two of the four pre-drilled holes on the worksurface will align with the mount 

holes on the base mount plate, as shown above. Fasten the base down using the 

screws supplied with the base, making sure every mount hole is utilized.

Continue to next page

PART # 1609107

SHEET 1

WORKSURFACE

BRACKET

METAL BASE

WOOD BASE

NOTE: It is recommended to install the Runoff Table after the Media Unit 

has been placed in its final resting position.

Содержание COACT

Страница 1: ...the box platform onto the back panel by aligning the mounting holes with the pre drilled holes on the back panel 2 Using the screws from the HK 104 kit fasten the box platform to the back panel makin...

Страница 2: ...h the pre drilled holes on the back panel 2 Using the screws from the HK 104 kit fasten the box platform to the back panel making sure the bottom edges are flush and that the box platform is centered...

Страница 3: ...aces 2 With the Wire Manager cut to the correct length peel back the paper wrapper on the back side to expose the adhesive as shown above Place the Wire Manager onto the back panel of the Media Unit m...

Страница 4: ...The panel will fit tighter the farther it travels downward If neccessary use a rubber mallet or loosen the shoulder screws 1 4 turn to ease the panel attachment 2 Next position the box platform onto...

Страница 5: ...ing sure every mount hole is utilized 2 Next place the table base onto the worksurface Depending on which base style was chosen two of the four pre drilled holes on the worksurface will align with the...

Страница 6: ...from the floor or from the top of the box platform Verify that box platform height is 13 3 4 as shown above 4 Making sure the worksurface is centered with the Media Unit and the bottom edge aligns wit...

Страница 7: ...HK 126 kit halfway into the bored holes on the back panel as shown above 2 Next slide the adjoining Media Unit against the connecting Media Unit making sure the dowel is inserted into the aligning hol...

Отзывы: