PP-9645 Aer PPC
19
Integrated VFD / LCM
1.
Remove the back cover
2.
Connect customer display
via serial cable and tighten
3 x M3 screw
AP-2025 AP-2029
3.
Customer display (integrated type) is connected to COM4
5mm LCM Module (AP-2025) is
5v
9mm VFD (AP-2029), 9mm LCM 20x2 (AP-2024), LCM 240x64 (AP-240G) are
12v
* Make sure the power setting of COM4 is correct before customer display is connected
4.
Do not
exceed the tilt angle as this
may damage internal cable
Содержание Aer PPC series
Страница 1: ...PP 9645 Aer PPC U Us se er r M Ma an nu ua al l ver 0 1...
Страница 11: ...PP 9645 Aer PPC 10 I O Connectivity I O Default I O Type C I O Type G I O Type K...
Страница 14: ...PP 9645 Aer PPC 13 6 Replace SATA storage cover with hands 7 Plug in power cord and power on...
Страница 17: ...PP 9645 Aer PPC 16 COM3 4 5 Make sure the device voltage matches the power setting before connection...
Страница 35: ...PP 9645 Aer PPC 34 7 Restart PP 9645 to complete installation...
Страница 43: ...PP 9645 Aer PPC 42 4 Click image PCAP7910_LD1185_B100_V00_T15_auo_15p_Dthqa 791p and then click Open 5 Click Go...
Страница 44: ...PP 9645 Aer PPC 43 6 Finish and click OK 7 F W update to T15...