background image

© 2020 Carrier 

FIGURE 4. 

Electric wiring diagram of Heavy Duty HESI Igniter. 

NOTICE

:  CONNECT  THE 

HDHESI 

IGNITER  PARTS  ACCORDING  TO  THE  WIRING  DIAGRAM  IN 

INSTRUCTION MANUAL.

WARNING: CHECK BEFORE CONNECTING THE IGNITER POWER PACK TO THE MAINS SUPPLY 

WHAT SUPPLY VOLTAGE IS AVAILABLE ON SITE. CHANGE SUPPLY VOLTAGE FROM 230VAC 

TO 115VAC IF NECESSARY.

NOTICE

: POWER AND GROUNDING SHOULD BE CONNECTED IN ACCORDANCE WITH THE 

IGNITER WIRING DIAGRAM (SEE FIG. 4), WITH PARTICULAR ATTENTION TO THE CORRECT 

GROUNDING TO THE PLANT GROUNDING SYSTEM.

NOTICE

: THE SAFETY INSTRUCTIONS IN THIS INSTRUCTION MANUAL SHOULD BE OBSERVED 

DURING INSTALLATION, OPERATION AND MAINTENANCE.

WARNING

ALL WORK ON BURNER INSTALLATION MAY ONLY BE CARRIED OUT WEARING 

PROTECTIVE CLOTHING, INCLUDING: PROTECTIVE UV-BLOCKING GLASSES, HARD HAT AND 

GLOVES.

WARNING

STRICTLY OBSERVE THE TEMPERATURE LIMITS FOR A PILOT AND IGNITER ROD 

MOUNTED INSIDE AND THE POWER PACK. IF THERE IS A RISK OF OVERHEATING, CHANGE 

THE ROD POSITION OR USE COOLING AIR.

Содержание SureFire II HDHESI

Страница 1: ...lag ash unburned fuel environment In case of special fuels or difficult operating conditions consult Fireye before ordering This High Energy Igniter is intended for intermittent operation as Class 3 Special igniter The igniter is made of high quality materials and its components are rigorously checked and tested prior to dispatch No moving parts and parts requiring adjustment ensure long and troub...

Страница 2: ...the end of the rod tip see Fig 2 4 6 between the central positive electrode and the grounded rod outer tube negative electrode After the Trial for Ignition the SureFire II HDHESI igniter must be disconnected from the power supply The circuit is equipped with discharging resistors which allows a quick discharge of capacitors below 90 seconds from when the igniter power supply is disconnected Only a...

Страница 3: ...missible operating temperatures appropriate measures should be taken e g change of the mounting position and method of fixing use of purge cooling air f In special or difficult applications consult Fireye FIGURE 2 SureFire II Heavy Duty HESI Igniter FIGURE 3 Use of SureFire II Heavy Duty HESI Igniter on oil burner basic principles of rod positioning ...

Страница 4: ...CCORDANCE WITH THE IGNITER WIRING DIAGRAM SEE FIG 4 WITH PARTICULAR ATTENTION TO THE CORRECT GROUNDING TO THE PLANT GROUNDING SYSTEM NOTICE THE SAFETY INSTRUCTIONS IN THIS INSTRUCTION MANUAL SHOULD BE OBSERVED DURING INSTALLATION OPERATION AND MAINTENANCE WARNING ALL WORK ON BURNER INSTALLATION MAY ONLY BE CARRIED OUT WEARING PROTECTIVE CLOTHING INCLUDING PROTECTIVE UV BLOCKING GLASSES HARD HAT AN...

Страница 5: ...020 Carrier FIGURE 5 HESI Igniter Rod junction box wiring FIGURE 6 Heavy Duty HESI Igniter Power Pack layout FIGURE 7 Connection of supply voltage 230VAC 115VAC and HV cable to the rod on Power Pack board ...

Страница 6: ...two wire shielded OD 15 mm 4 5kV max wire 1 5 mm Power Pack dimensions L x W x H 250 x 360 x 155 mm Weight of parts material Power Pack P N HE PP 24 9 8 kg Carbon Steel powder coated or Stainless Steel option Rod P N HE ROD 24 0 9 0 9 m long 1 3 kg with rod tip Cast Aluminum painted j box 316 SS tube Rod weight adder approx 0 75 kg per meter Rod Tip P N HE TIP 24 L 0 7 kg 316 Stainless and Heat Re...

Страница 7: ... high temperature applications always use retractor with min stroke 400 mm to pull the tip back inside the guide tube increase the guide tube length so that the rod tip is completely hidden in guide tube when retracted use purging cooling air in the tube to cool the rod and push away a dirt 4 7 Mounting of the igniter in a retractor the igniter s rod should be placed inside the guide pipe and fixe...

Страница 8: ...IGNITER START UP AND OPERATION 5 11 During the burner start up the main voltage 230 115 VAC can be applied to the power pack provided that proper wiring conditions as in p 5 3 to 5 6 have been verified as well as the correct assembly of the igniter has been inspected 5 12 When starting the burner installation from cold conditions after a longer standstill check the operation of the ignition device...

Страница 9: ...of excessive damage replace the rod Open the rod junction box cover and check the condition of the cables and terminals The inside of box and cables must be clean and should not bear any traces of mechanical or thermal damages In case of water ingress traces check the condition of box gasket and tightness of glands and gasket from rod side Check tip contact socket on the rod side insulator and thr...

Страница 10: ...re output voltage using high voltage probe the RMS value should be 1 150V peak 1 650V d Capacitors P N HE CAP 10 2 05 use a multi meter with capacitance measurement disconnect GND bus and measure capacitor capacity It should be as per the capacitor specification 7 3 If the main voltage is present but no electrical sparks are generated at the rod s tip and there is no voltage at the HV ignition tra...

Страница 11: ... under Each rod tip and spark tube has one month warranty to be checked on receipt or within 1 month for damage and tested for the proper functioning Fireye should be notified of any failure After 1 month the warranty on tip expires 8 4 This guarantee covers delivered devices and materials under conditions of proper installation start up operation and maintenance it means the use in accordance wit...

Страница 12: ... with junction box replaceable tip Part No Description HE ROD 24 0 8 HDHESI rod 0 8 mtr long with IP67 j box and replaceable tip 685mm for 24 Joules HE ROD 24 1 0 HDHESI rod 1 0 mtr long with IP67 j box and replaceable tip 685mm for 24 Joules HE ROD 24 1 5 HDHESI rod 1 5 mtr long with IP67 j box and replaceable tip 685mm for 24 Joules HE ROD 24 2 0 HDHESI rod 2 0 mtr long with IP67 j box and repla...

Страница 13: ...art No Description HE TIP 24 L HDHESI Rod Tip Long length 685mm for 24Joules HE SG 24 Spark Gap 24 Joules HE TR 1150 HV Transformer 230 115 VAC 1150 VAC HE CAP 10 Capacitor 3600 VDC 10μF HE CAP 2 Capacitor 3200 VDC 2μF HE CAP 05 Capacitor 3750 VDC 0 47μF ...

Страница 14: ...ion Manual L m 3 Required Ingress Protection Level IP 4 The operating temperature range C 5 Special power pack enclosure material stainless steel for aggressive atmospheres If YES check the box 6 Power pack supply kind of supply 230VAC or 115VAC VAC 7 Capacity of burner to be lit Nominal Max kW Reduced for Ignition Start capacity kW 8 Kind of fuel type of Oil Gas enclose fuel composition sheet Cal...

Страница 15: ... system or its overall performance WARRANTIES FIREYE guarantees for one year from the date of installation or 18 months from date of manufacture of its products to replace or at its option to repair any product or part thereof except lamps electronic tubes and photocells which is found defective in material or workmanship or which otherwise fails to conform to the description of the product on the...

Отзывы: