Installation
(for qualified installers only)
45
© Travis Industries
4/22/21 - 1458
PB 72 MV/GSB2/GSR2 Install
6. Start the main burner and verify the burner ignites correctly.
7. Leak test all gas joints.
Air Shutter Adjustment
Let the heater burn for fifteen minutes (make sure the logs and glass are in place). The flames should be
yellow with no sooting. Adjust the air shutter, if necessary, to achieve the correct looking flame.
Air Shutter Adjustment
8. Adjust the flame to its highest position - the flames should not contact the top of the firebox. Check the flame on low
position. The flames should burn off of each burner hole. If the heater does not work correctly, contact your Travis dealer
for a remedy.
9. Give this manual to the home owner for future reference and fully explain operation of this heater. For comprehensive
operating and maintenance instructions, refer to the Owner's Manual.
ACID WASH WARNING:
Make sure any masonry that has been treated with acid wash has been properly neutralized (this is
used primarily with brick faces). Acid wash (muriatic acid) is used to remove excess mortar.