background image

Viking RU Dry 

 

5.  ASSEMBLY INSTRUCTIONS 

 

1.   Remove all outer packaging and timber. 
2.   Remove slotted steel top plates from rear of heater and cast iron top 
plates from inside the heater and carefully set aside, taking care not to 
scratch or damage the paint finishes. 
3.   Position unit onto floor protector ensuring it complies with the 
clearances as shown in section 4 on page 5. 
DO NOT ATTEMPT TO LIFT THE HEATER BY THE GRANITE 
ASHLIP. 
4.   Install the rear cast iron plate and then the front cast iron plate onto the 
rope seals around the top of the firebox and ensure they are bedded down 
well. Lifting lugs are positioned onto the sides of the casting, taking care 
not to catch fingers under the plates. 
5.   Assemble and install the flue as per instructions (page 7 & 8). 
6.  A flue shield must be fitted; the minimum requirement is for a single 
skin, semi-circular, stainless steel flue shield with a reflective inner 
surface 1200mm high.  This should be installed so that the bottom edge of 
the flue shield is 20mm from the top surface of the heater and spaced off 
the flue pipe by approximately 35mm. 
7.   Secure the fire to the floor by using appropriate fastenings through the 
holes provided in the rear of the base plate.  This is a New Zealand 
Standard 2918 requirement due to NZ being earthquake prone. 
8.  Carefully position the main slotted steel painted top panel onto the 
heater, there are locating lugs on the underside that fit into the indents on 
the cast iron tops that ensure it is correctly positioned.  Slide in the rear 
infill top plate behind the flue and the curved top plate locates into the lugs 
onto the back edge. 
9.  Fit door knob with spacer  
as per drawing shown herewith. - 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание Viking AG DRY MODEL

Страница 1: ...G WOODBURNER THIS FIRE CAN BE INSTALLED ON A PROPERTY OF 2 HECTARES OR MORE All installations must be in accordance with these instructions Consult with the building authority having jurisdiction to determine the need for a permit prior to commencing the installation Failure to follow these instructions may also void your fire insurance and warranty ...

Страница 2: ...age No Item No Topic 3 1 Warnings 4 2 Installation Responsibilities 4 3 Floor Protector Requirements 5 4 Installation Clearances 6 5 Assembly Instructions 7 6 Flue Installation 8 Minimum Height of Flue System Exit Please leave these instructions with owner when installation is complete Edited 22 3 13 ...

Страница 3: ...R AEROSOLS IN THE VICINITY OF THIS APPLIANCE WHEN IT IS OPERATING Use caution when reloading with fuel Do NOT attempt to load fuel into the heater when the fire inside the stove is at or near its peak Do NOT burn large quantities of paper or combustible material that would create an extremely hot quick fire Do NOT burn highly coloured paper or brochures junk mail USE ONLY DRY WOOD AVOID BURNING WE...

Страница 4: ...UIREMENTS The heater should always be installed on top of its base due to high temperatures sustained over long periods The base must be anchored to both the floor protector and the floor for seismic restraint Anchor points are provided in the base If the heater is installed on or within 500mm of a heat sensitive floor then an ash floor protector using a minimum of 6mm thick tiles will be required...

Страница 5: ... 340mm Width 320mm Depth 500mm Flue Size 150mm Heating Area estimate 200sqm CLEARANCES A B C D E F G H J K L M N O WITH FLUE SHIELD 100 320 300 120 50 260 590 350 780 1040 1280 1060 780 410 Clearances are shown with an ash floor protector using 6mm ceramic tiles ...

Страница 6: ...er instructions page 7 8 6 A flue shield must be fitted the minimum requirement is for a single skin semi circular stainless steel flue shield with a reflective inner surface 1200mm high This should be installed so that the bottom edge of the flue shield is 20mm from the top surface of the heater and spaced off the flue pipe by approximately 35mm 7 Secure the fire to the floor by using appropriate...

Страница 7: ...ng screws 8 Place ceiling plate with folded edges upwards over heater spigot 9 Position the flue pipe into the heater spigot The flue pipe can either lowered from the top as a single unit or fed up from the room a length at a time ensuring that all joints are fixed properly 10 Slide the inner casing into place between the outer casing and the flue pipe 11 The flue pipe must extend 200mm above the ...

Страница 8: ...Viking RU Dry 8 ...

Страница 9: ...WOODFIRES BY Hewitsons Limited Manufacturers of Lady Kitchener Bronte Coaster Contessa Encore Royale Zealandia Athena Forte Plaza Deco Aqualux Kompact 98 Niven Street PO Box 3231 Onekawa Napier Phone 06 8438260 Fax 06 8430505 ...

Страница 10: ...Viking RU Dry 10 Email hothouse firenzo co nz Web www firenzo co nz ...

Отзывы: