24
Your G12 control panel is the power distribution center for the
coach. This panel receives the signals sent from your switch
panels and performs the actions that have been requested by
activating and deactivating the required circuits.
Every circuit controlled by the G12 is numbered and listed on a
black label (load list) which is usually mounted next to the G12
panel. Troubleshooting Example - If you press the Kitchen
Ceiling
Lights button on your Lyra screen and the lights don’t
come on, check the Network Diagnostics Page to see if the light
for Output 27 shows status. If it does, you will want to check
output voltage on that pin to make sure that the G12 is sending
power to the lights (Fig 1).
G12 DC Panel
GROUND
Figure 1
Test
Positive
Output Channels as shown:
Multi-
meter
Содержание 87510011
Страница 1: ...1 Riverstone V2 Manual...
Страница 28: ...28...