teRMs & ConDitions oF WaRRanty

Firebird products are designed and manufactured to give 
many years of trouble free service.

The terms laid down in the warranty must be adhered to

u

 Firebird provides a comprehensive, conditional 

warranty of 5 years on the boiler shell and 2 years 
on all other parts from date of installation, provided   
installation has occurred within 12 months from date 
of purchase.

u

  The 5 year boiler shell warranty consists of parts and 

labour for the first 3 years and parts only for years 4 and 
5.

u

 The warranty will only apply if the boiler is 

commissioned by an OFTEC registered or competent, 
qualified engineer and is serviced annually thereafter.

u

 Please ensure that the commissioning certificate 

within the Boiler Passport is fully completed by an 
OFTEC registered or competent, qualified engineer 
and is returned to Firebird within 28 days of complete 
installation and commissioning.  The Boiler Passport is 
included with every boiler and can also be completed 
online at the following link:

 http://www.firebird.ie/index.php/boiler-passport.html.

u

  Correct commissioning will ensure that your boiler is 

set to operate at its maximum fuel efficiency.

u

  Consumable components, the nozzles and the oil hose 

are excluded.

teRMs & ConDitions oF WaRRanty 

1.  Warranty implies that the product shall be free from 

defective parts or workmanship for a period of warranty 
cover, which begins from the date of installation.

2.  All claims under the warranty programme must be 

within the time limits stated on the left.

3.  Installation and commissioning of the product must be 

in accordance with (a) instruction/technical manuals 
(b) all relevant standards and codes of practice.

4.  An OFTEC registered or competent, qualified engineer, 

using the correct installation and test equipment must 
carry out installation and commissioning.

5.  This warranty does not cover special, incidental or 

consequential damages, injury to persons or property, 
or any other consequential loss.

6.  Servicing of the boiler is to be carried out annually to 

maintain the manufacturer’s warranty.

7.  Firebird accepts no liability in respect of any defect 

arising from incorrect installation, negligence, fair wear 
and tear, misuse, alteration or repair by unqualified 
persons.

8.  Firebird will not accept any liability in respect of any 

defect  occurring  to  the  product  due  to  limescale        
build-up and or low return water temperature.

9.  The warranty programme extends to reasonable labour 

costs EXCEPT in the case of a 5 year warranty period 
whereby any valid claim made after 3 years will not 
include labour costs.

10.  Firebird’s prior authorisation must be obtained before 

examination or repair of the product takes place.

11. Firebird will examine all claims made under the 

warranty programme and for any claims that are 
deemed invalid, the costs incurred will be borne by the 
owner.

12. The warranty programme only applies where the 

product was used for normal domestic heating 
purposes.

13. Any defective part removed under any or all of the 

warranty programmes MUST be returned to Firebird.

14. If this appliance is installed in a pressurised system, 

failure to correctly size the expansion vessel may 
damage the boiler and invalidate the warranty

15. A full set of warranty conditions and terms can be 

found on the Firebird website.

STATUTORY RIGHTS OF THE OWNER ARE NOT

AFFECTED BY THIS WARRANTY

8

Содержание Systempac 12-20kW

Страница 1: ...ax Condensing Boilers Technical Manual HEATING SOLUTIONS This manual must remain with the householder once installation is complete Working towards a greener planet System Boiler Systempac Slimline Sy...

Страница 2: ...burners are supplied as matched units Page 1 Safety 2 2 Standards Regulations 3 2 1 Condensate Disposal 4 2 2 Flue Regulations 7 2 3 Flue Systems 10 2 4 Oil Supply 11 3 SYSTEM BOILER 3 1 Householder...

Страница 3: ...First Aid medical attention should be sought following eye contact or prolonged reddening of the skin The small quantities of adhesives and sealants used in the product are cured They present no know...

Страница 4: ...A1 2014 EN 12831 2003 and the statutory requirements of the Building Regulations To ensure the highest standards of installation safety it is important that the boiler be installed in compliance with...

Страница 5: ...al or in an unheated garage should not exceed 3 meters and Should be lagged with water proof insulation to prevent freezing Boiler Sealed Condensate Drain Condensate Drain Trap Lime Stone Chippings Fr...

Страница 6: ...oiler on the base or fixed to the casing of the boiler house boiler or mounted on the wall alongside the boiler Condensate pump Inlet connected to condensate drain at base of boiler Condensate pump wi...

Страница 7: ...ame Cone Float Screw cap Seal Seal 1 Push screw cap into connector and screw onto socket 2 Place cone into frame and float into cone 3 Screw frame with cone and float into connector 5 Final assembly 4...

Страница 8: ...Q Q Q Q R Pressure Jet Location Appliance Burner Type Condensing UK ROI NI A Directly below an opening airbrick opening window etc 1000mm 600mm B Horizontally to an opening airbrick opening window etc...

Страница 9: ...ved for low level flue and low level balanced flue discharge when tested to BS EN 303 1 5 Terminating positions must be at least 1 8m distant from an oil storage tank unless a wall with at least 30 mi...

Страница 10: ...isperse vapours 3 The effect of the moisture generated must be considered in relation to the possible corrosion of metal parts it might reach and to the possible formation of ice on pathways in freezi...

Страница 11: ...ble liner suitable for condensing applications System 35 adaptor 500mm Adjustable length Boiler adaptor Condensing boiler Condensing boiler NOTE All brick chimney constructions must comply with curren...

Страница 12: ...be oil tight Soldered joints are not permissible Before connecting to the boiler always flush the complete oil supply line and ensure that oil supply is completely clean and free of any dirt or foreig...

Страница 13: ...rn on the timer or heat demand switch i e room stat Turn the temperature dial clockwise to increase temperature The set temperature displayed on the LCD will increase Temperature range min 60 C to max...

Страница 14: ...ox lockout safety feature which operates automatically if a fault occurs in the burner operation Should this occur the light on the front of the burner will illuminate This could be caused by A An int...

Страница 15: ...ls to ensure return values are as stated above PLASTIC PIPING The boiler thermostat control and safety system is not designed and must not be relied on to protect plastic pipe from overheating Plastic...

Страница 16: ...RT 1 EN 12828 2003 AND ANY OTHER RELEVANT STANDARDS REGULATIONS When calculating the size of any additional expansion vessel remember to deduct the boiler expansion vessel volume of 12 litres from the...

Страница 17: ...ed flue TOP mark Snorkel 1 Push the flap valve into the balanced flue air intake 2 Ensure that the flap valve is in the correct position 3 Push the snorkel hose over the flap valve and air intake and...

Страница 18: ...ctrical Supply The boiler and controls require a 230V 50Hz mains electric supply protected with a 5A fuse This appliance must be earthed A qualified electrician must carry out all electric wiring in a...

Страница 19: ...required to operate the post purge function on the burner and the pump over run thermostat If permanent live supply is not provided the burner will not operate Mains Connection Pump Connection L3 perm...

Страница 20: ...7 442 610 753 157 94 124 336 75 20 26kW 146 847 442 610 753 157 94 124 336 75 26 35kW 149 847 442 610 753 157 94 124 336 75 35 44kW 235 1048 660 852 914 232 158 100 125 111 485 86 F E J I H D W A C Fr...

Страница 21: ...2184 112184 112184 9 1 Condensate hose 111537 111537 111537 111537 10 1 Drain cock 111329 111329 111329 111329 11 1 Heat deflector 210904 210904 210904 211643 12 1 Air hose 111902 111902 111902 111501...

Страница 22: ...mm dia Max Low Level Flue Length 1 5m 1 5m 1 5m Max High Level Balanced Flue Length 6m 6m 6m Heating System Sealed Fit in accordance with BS 7074 Part 1 BS 5449 OFTEC standards and all other relevant...

Страница 23: ...a burner control box lockout safety feature which operates automatically if a fault occurs in the burner operation Should this occur the light on the front of the burner will illuminate This could be...

Страница 24: ...to ensure return values are as stated above PLASTIC PIPING The boiler thermostat control and safety system is not designed and must not be relied on to protect plastic pipe from overheating Plastic p...

Страница 25: ...7074 PART 1 EN 12828 2003 AND ANY OTHER RELEVANT STANDARDS REGULATIONS When calculating the size of any additional expansion vessel remember to deduct the boiler expansion vessel volume of 12 litres f...

Страница 26: ...ection Pump Connection 25 WIRING Electrical Supply The boiler and controls require a 230V 50Hz mains electric supply protected with a 5A fuse This appliance must be earthed A qualified electrician mus...

Страница 27: ...anced flue TOP mark Snorkel 1 Push the flap valve into the balanced flue air intake 2 Ensure that the flap valve is in the correct position 3 Push the snorkel hose over the flap valve and air intake a...

Страница 28: ...945 720 625 795 180 540 175 70 351 133 432 26 35kW 166 945 720 625 795 180 540 175 70 351 133 432 35 44kW 270 1074 839 855 936 180 684 175 115 507 134 505 W H 16 x2 600 196 430 50 195 110 66 108 520 F...

Страница 29: ...11537 111537 10 1 Drain cock 111329 111329 111329 111329 11 1 Heat deflector 210904 210904 210904 211643 12 1 Flap valve adapter 114262 114262 114262 114262 13 1 Flap valve 114192 114192 114192 114192...

Страница 30: ...Boilers Balanced Flue Assembly 125 5 mm dia 125 5 mm dia 150 6 mm dia Max Low Level Flue Length 1 5m 1 5m 1 5m Max High Level Balanced Flue Length 6m 6m 6m Heating System Sealed Fit in accordance with...

Страница 31: ...with a burner control box lockout safety feature which operates automatically if a fault occurs in the burner operation Should this occur the light on the front of the burner will illuminate This coul...

Страница 32: ...plastic pipe manufacturer for their instruction on how to ensure their product never overheats Our boiler control and safety high limit thermostats are not designed to fulfil this function Firebird ac...

Страница 33: ...ectrical Supply The boiler and controls require a 230V 50Hz mains electric supply protected with a 5A fuse This appliance must be earthed A qualified electrician must carry out all electric wiring in...

Страница 34: ...alanced flue TOP mark Snorkel 1 Push the flap valve into the balanced flue air intake 2 Ensure that the flap valve is in the correct position 3 Push the snorkel hose over the flap valve and air intake...

Страница 35: ...e Weight kg Dimensions mm H W D A C E F G I J K 12 20kW 147 920 465 760 794 115 104 116 145 277 126 415 20 26kW 150 920 465 760 794 115 104 116 145 277 126 415 26 35kW 153 920 465 760 794 115 104 116...

Страница 36: ...112184 9 1 Condensate hose 111537 111537 111537 10 1 Drain cock 111329 111329 111329 11 1 Heat deflector 210904 210904 210904 12 1 Flap valve adapter 114262 114262 114262 13 1 Flap valve 114192 114192...

Страница 37: ...4 litres 24 litres Flue Indoor Boilers Balanced Flue Assembly 125 5 mm dia 125 5 mm dia 125 5 mm dia Max Low Level Flue Length 1 5m 1 5m 1 5m Max High Level Balanced Flue Length 6m 6m 6m Heating Syste...

Страница 38: ...retained by the commissioning engineer u The system should be checked thoroughly CHECKLIST FOR INSTALLING AND COMMISSIONING A FIREBIRD BOILER Pre installation check u Is the following documentation in...

Страница 39: ...at operation and set desired temperature on completion u Use a smoke gun to check clean combustion Flue gas analysis and fine tuning of burner u Ensure flue gas is over 50 C when setting CO2 u Allow t...

Страница 40: ...ions air temperature and nozzle tolerance Use flue gas analyzer to achieve optimum results Danfoss ES nozzles are a Kerosene nozzle and have a tolerance of 5 Danfoss S H nozzles are a Diesel nozzle an...

Страница 41: ...mulated water and sludge from the tank by opening the drain valve Turn off the oil supply and remove the filter bowl then wash the element clean with Kerosene Fit a new element if required The Boiler...

Страница 42: ...e in accordance with a instruction technical manuals b all relevant standards and codes of practice 4 An OFTEC registered or competent qualified engineer using the correct installation and test equipm...

Страница 43: ...rgy consumption Sound power level kW GJ dB SYSTEM 12 20kW A 20 93 50 46 20 26kW A 26 93 71 47 26 35kW A 35 92 95 52 36 44kW A 44 94 123 N A SYSTEMPAC 12 20kW A 20 93 50 N A 20 26kW A 26 93 71 N A 26 3...

Страница 44: ...d products please contact Firebird Heating Solutions Ltd dar s Industrial Estate Baile Mhic re Co Cork P12 HK51 Ireland t 353 0 26 45253 f 353 0 26 45309 e info firebird ie web www firebird ie Firebir...

Отзывы: