FireBird HEAT PAC 120/150 Скачать руководство пользователя страница 4

2

FOREWORD

1

INTRODUCTION

This instruction manual is produced for the reference

and guidance of qualified installation engineers. EU

legislation governs the manufacture, operation and

efficiency of all domestic oil boilers. One effect of this

will be that boilers and burners will require to be

supplied as matched units tested and approved to

OFTEC Standard OFS Al00.

FIREBIRD Boilers are full manufacturing members of

OFTEC (Oil Firing Technical Association for the

Petroleum Industry) and are participating in its Boiler

testing and approvals programme to comply with OFS

A100 and EC Efficiency Directive.

Boilers must be installed, commissioned

and serviced by qualified and experienced

OFTEC approved personnel (U.K. only). It

should be noted that it is the

responsibility of the installer to ensure

that the boiler is properly commissioned.

Failure to do so may invalidate the boiler

guarantee and any extended warranty.

All appropriate OFTEC manuals and BS

Standards should be studied and their

requirements adhered to and used in

conjunction with these instructions. This

manual includes a list of some BS

Standards and Building Regulations.

OFTEC is conducting training and registration of

engineers and this is to be commended, as reading of

this manual alone for installation and servicing

procedures cannot replace the critical advantage

provided by training and years of experience.

The Firebird System Boiler Range is based on the ‘S’
Range Boilers. All boilers in the range are designed
and manufactured to meet all the latest European
standards and the thermal efficiency requirements of
the Boiler (efficiency) Regulations 1993. All Boilers
can be fitted to a conventional flue or easily adapted
to a room sealed unit by using a Firebird matched
balanced flue kit.

The control panel can be easily accessed by the
simple removal of four screws, then this assembly can
be pulled forward for access to components.

Clean combustion with kitchen-quiet operation is
assured by a highly efficient matching pressure jet
burner which produces very low NOx emissions. The

Combi Range is a dedicated sealed system boiler
having a 12 litre expansion vessel on the 50-70 and
70-90 models, on the 90-120 model there is a 14 litre
expansion vessel, system filling kit and 3 bar safety
valve all fitted within its cabinet.

A drain-off cock is fitted inside the boiler beside the
burner and there are flow and return connections
provided under top lid of the boiler for connection to
the heating and hot water systems. As all servicing can
be carried out from the front, the boiler many be
fitted under a kitchen worktop.

GUARANTEE

• All Firebird oil Boilers have a 2 year
comprehensive warranty which extends to
5 year on the boiler shell

• The Guarantee card must be fully
completed and returned to firebird within
28 day’s of installation.

• Consumable components, the nozzles and
the oil hose are excluded.

• The terms laid down on the Guarantee
must be adhered to.

NOTE: Some Firebird boilers are suitable
for conversion to gas. Conversion must only
be undertaken by Firebird approved gas
technicians using a Firebird supplied
conversion kit suitable for the particular
boiler.

Содержание HEAT PAC 120/150

Страница 1: ...D B O I L E R S THIS MANUAL MUST REMAIN WITH THE HOUSEHOLDER ON COMPLETION OF INSTALLATION I S EN ISO 9002 I N S T A L L A T I O N C O M M I S S I O N I N G S E R V I C I N G USER INSTRUCTIONS S y s t...

Страница 2: ......

Страница 3: ...ervals 7b The oil tank 7c The boiler 7d The Burner 8 FAULT FINDING P 22 23 9 TECHNICAL SPECIFICATIONS P 24 30 9a Boiler Dimensions 9b Boiler Specifications Recommendations Etc 9c Oil Burner Performanc...

Страница 4: ...are designed and manufactured to meet all the latest European standards and the thermal efficiency requirements of the Boiler efficiency Regulations 1993 All Boilers can be fitted to a conventional f...

Страница 5: ...igh dust levels are only likely to arise following harsh abrasion Generally normal handling and use will not give discomfort Follow good hygiene practices wash hands before consuming food drink or usi...

Страница 6: ...F the mains electrical supply to the boiler When servicing always switch off the mains supply to the boiler WARNING Re Wiring of boiler In the situation where the primary flow from the boiler is plumb...

Страница 7: ...y obvious problems such as oil leaks loose connections etc ENSURE OIL TANK CONTAINS CORRECT GRADE FUEL To restart the boiler 1 Press reset button see diagram above 2 Ensure that the boiler thermostat...

Страница 8: ...ting and maintenance of Services supplying water BS 7671 Current lEE Regulations Local Water Undertaking Byelaws The Control of Pollution Oil Regulations In addition the work must comply with OFTEC In...

Страница 9: ...d flue system is installed to comply with manufacturers instructions and AS1691 1985 Domestic Oil fired Appliances Installation Please ensure that the appliance is bolted to the floor for seismic rest...

Страница 10: ...and the following points should be considered 1 Tiled surfaces in a small room will amplify noise particularly if the wall construction is hollow 2 If a conventional flue passes through a bedroom it i...

Страница 11: ...any time Flue pipes should be safely sealed into the wall to prevent flue gases re entering room or building Refer also to page 16 PREPARING BOILER FOR CONVENTIONAL CHIMNEY FLUE OPERATION Before insta...

Страница 12: ...emperature sealant to the O ring on the inner flue pipe to insure a positive seal Push the flue pipe through the 125mm hole in the wall Secure the flue adaptor to the Boiler IMPORTANT A 50mm 2inch gap...

Страница 13: ...le in the wall IMPORTANT A 50mm 2inch gap must be left between cone cowl and wall Ensure Combustion air pipe protrudes beyond the outer surface of the wall Apply high temperature sealant to the O ring...

Страница 14: ...ecure the flue adaptor to the boiler Apply high temperature sealant to the inside of flue Push the flue pipe through the hole in the side panel and place firmly over flue adaptor Boiler C Boiler Push...

Страница 15: ...4 FLUE SYSTEMS 13...

Страница 16: ...al from terminals on the same wall I Horizontal from terminals on the same wall J Below an opening airbrick window etc K From vertical sanitary pipework L Vertical flue from wall Book three Nov 1997 A...

Страница 17: ...combustion accumulating in stagnant pockets around the building or entering into buildings 2 Vertical structure in N 0 and P include tank or lift rooms parapets dormers etc 3 Terminating positions A t...

Страница 18: ...opriate Building Regulations for each country should be obtained and fully applied N B Please Carefully Note A For boiler installations in domestic garages in Scotland Part F of Building Regulations p...

Страница 19: ...stalling the boiler Refer also to Regulations and Standards listed on page 14 Electrical Supply The boiler and controls require 230V 1 phase 50Hz electric supply with a 5amp fuse THIS APPLIANCE MUST B...

Страница 20: ...rs with a waterproof membrane between the piers and tank Polyethylene tanks do not need pier supports and may be mounted on any flat surface which can support the weight of the tank and its contents T...

Страница 21: ...e seven of this manual section 2E F 5 E Tigerloop Single Pipe Systems IMPORTANT The Tigerloop should not be fitted inside the dwelling See drawing below and OFTEC manual book 3 page 2 10 Where install...

Страница 22: ...re open and that installation conforms with all Standards Regulations and Instructions B Check that boiler baffles are correctly positioned C Check the oil supply by disconnecting the oil supply hose...

Страница 23: ...cess door replacing when necessary When refitting this door be careful not to dam age the foil and insulation by over tightening 7 D The Burner Check performance of oil nozzle and replace as necessary...

Страница 24: ...8 FAULT FINDING 22...

Страница 25: ...8 FAULT FINDING 23 T Repair or Replace Oil Pump r No...

Страница 26: ...945 310 170 575 80 100 420 175 90 120 625 710 945 340 170 575 80 100 420 175 120 150 690 720 1010 340 170 575 80 180 475 185 Heat Pac Outline Dimensions Plumbing Access Point Dimensions MODEL D W H A...

Страница 27: ...sembly 5 125mm Concentric Flue Weight Dry Incl Pallet 50 70btu s 160 Kg 70 90btu s 162 Kg 90 120btu s 177 Kg Water Content Total 50 70btu s 59 Litres 70 90btu s 59 Litres 90 120btu s 68 Litres Thermos...

Страница 28: ...ghput flue type draught oil viscosity etc may give results differing from these laboratory performance figures DIESEL SETTINGS for Firebird Boiler Range Using RDB 2 2 Burner Output Range Nozzle Pump H...

Страница 29: ...6 EEC Low Voltage 73 23 EEC Machines 98 37 EEC and Efficiency 92 42 EEC 7 Pump pressure adjustment screw 8 Pressure gauge port 9 Photoresistance 1 Pump 2 Control box 3 Reset button with lock out lamp...

Страница 30: ...9 TECHNICAL SPECIFICATION 28 9 D E Riello Burner Specification...

Страница 31: ...Firebird S Range has been tested and will operate equally efficiently using Ecoflam or Sterling Burners which may also be fitted as original equipment Refer to separate burner instructions booklet pa...

Страница 32: ...To Burner Mains In Here Safety Limit Thermostat Temperature Control Dial Reset Pin Inside Screw Off Cover To Dual Temperature Control Thermostat And Safety High Limit Thermostat Firebird Kitchen C Sys...

Страница 33: ...System Oil Boiler PART 2 System Filling and Testing 31...

Страница 34: ...t end should terminate within 100 mm above inside floor level and be in a visible and accessible position No tundish is necessary in this position and householder should be advised that this discharge...

Страница 35: ...ssel will be required to be fitted to the return pipe as close as is practicable to the boiler There should be no valves or restrictions between vessel and boiler See page 34 for vessel sizes If stati...

Страница 36: ...volume required as given in above table EXAMPLE using above table If Total water content of system 150 litres And Initial system pressure required is 1 0 bar Then Vessel volume required from above ta...

Страница 37: ...point to give a minimum static head of 300 mm between it highest point and cistern The manual filling system fitted to boiler should then be disconnected and connection points blanked off This system...

Страница 38: ...r water leaks having pressurised it to 1 5 2 5 bar Correct any leaks then check operation of safety valve by admitting further water until this valve operates This should occur when system pressure ri...

Страница 39: ...37 System Oil Boiler PART 3 Spare Parts...

Страница 40: ...008794 High Voltage Lead 10 3005708 Fan 10 3008645 Fan 11 3008647 Air Damper Assembly 11 3008839 Air Damper Assembly 12 3008646 P E Cell 13 3008863 Lead 14 3007479 Capacitor 4uf 15 3007582 Needle Valv...

Страница 41: ...3 C P M U P 7 1 3 4 4 0 0 0 3 A T N I O J 8 1 6 3 8 2 0 0 3 C R O T I C A P A C R O T O M 9 1 8 4 6 8 0 0 3 B L I O C 0 2 6 5 8 8 0 0 3 R O T C E N N O C 1 2 9 4 6 8 0 0 3 N O I T C E T O R P 2 2 3 1...

Страница 42: ...40 10 C System Pluming Parts Illustration 10 SPARE PARTS BOILER System Boiler Elevation 4b System Boiler Plan 4 4a 2 1 3 14 9 6b 1 6a 6 2 3 7 5 8 10 12 13 11...

Страница 43: ...g loop check valve 1 1 1 5 Circulating Pump 1 1 1 FC 03102 6 10 Ltr Pressure Vessel 50 70 1 FC 0306070 12Ltr Pressure Vessel 70 90 1 FC 0306090 14 Ltr Pressure Vessel 90 120 1 FC 0306012 7 Pump Valve...

Страница 44: ...s Illustration Firebird System Range 50 70 70 90 10 SPARE PARTS BOILER Flue Gas Analysis Point View Glass Assembly 15a 15b 15 16a 16 Firebird System 50 50 White Cased Model Firebird System 70 90 White...

Страница 45: ...Viewing glass gasket P70 L 45 1 16 Flue gas analysis cover FC 03113 1 16a Flue gas analysis cover gasket FC 03114 1 1 Side Panel L H Side FC03118L 1 2 Side Panel R H Side FC03118R 1 3 Dual Stat IM TLS...

Страница 46: ...0 150 White Cased Model 10 SPARE PARTS BOILER Flue Gas Analysis Point View Glass Assembly 15a 15b 15 16a 16 Firebird System 90 120 White Cased Model Remove Second Row Of Baffles when output is at lowe...

Страница 47: ...10 1 15a Viewing glass FC 03111 1 15b Viewing glass gasket P70 L 45 1 16 Flue gas analysis cover FC 03113 1 16a Flue gas analysis cover gasket FC 03114 1 1 Side Panel L H Side SS150 LH L 01 1 2 Side P...

Страница 48: ...102 1 5 Front HP70 L 103 1 6 Back HP70 L 104 1 7 Back flue outlet HP70 L 106 1 8 Top HP70 L 105 1 9 Boiler Door P70 L 08 1 9a Door Gasket P70 L 41 1 10 Baffles P90 L 09 3 11 Flue Kit HP70 L 14 3 1 12...

Страница 49: ...e HP90 108 1 5 R L Service side HP90 109 110 2 6 Flue MF14 5BK 1 6a Flue drip tray 1 7 Back HP90 104 1 8 Top HP90 105 1 9 Boiler Door P70 L 08 1 9a Door Gasket P70 L41 1 10 Burner flange See Burner Pa...

Страница 50: ...ler Door P120 L 08 1 9a Door Gasket P120 L41 1 10 Burner flange See Burner Parts Book 1 11 Burner Riello G5X LD35 1 12 Flue Chimney HP120 208 1 13 Baffle P120 L 09 8 14 Electrical Box P70 L 48 1 15 Th...

Страница 51: ...ER COMMISSIONING ENGINEER In block capitals ADDRESS POSTCODE TEL DATE NAME COMMISSIONING COMPANY SIGNATURE COMMISSIONING CHECK DETAILS Burner Model Oil Type Nozzle Type Nozzle Size Nozzle Angle Pump P...

Страница 52: ...Engineer should advise householder Burner Model Oil Type Nozzle Type Nozzle Size Nozzle Angle Pump Pressure Air Smoke Reading Flue Draft W g CO2 F G T C Flue Seal Gaskets Fire Valve Location CHECK Wa...

Страница 53: ...Engineer should advise householder Burner Model Oil Type Nozzle Type Nozzle Size Nozzle Angle Pump Pressure Air Smoke Reading Flue Draft W g CO2 F G T C Flue Seal Gaskets Fire Valve Location CHECK Wa...

Страница 54: ...NOTES...

Страница 55: ...lid claim made after 3 years will not include labour costs h Firebird s prior authorisation must be obtained before examination or repair of the boiler takes place i Firebird will examine all claims m...

Страница 56: ...the right to change without prior notice the specification of our products at any time and be without obligation to make similar changes in products previously produced New Zealand Distributor Central...

Отзывы: