Operation

To activate a single-action pull station, simply pull-down the handle.  To activate dual-action stations, push-in,
then pull-down the handle.  The word ‘ACTIVATED’ appears after the handle is pulled down.  The pull station
remains in the activated position until reset.
1) To reset the 

BG-12S

 and 

BG-12

 hex lock pull stations, work the supplied 9/64-inch hex wrench into the lock

until firmly seated and turn counterclockwise 1/4-turn.
To reset the 

BG-12L

 and 

BG-12LSP

 key lock stations, insert the key and turn counterclockwise 1/4-turn.

2) Open the door until the handle returns to the ‘NORMAL’ position.
3) Close and lock the door.  Closing the door automatically resets the switch to the ‘NORMAL’ position.

Note – Opening the pull station door will not activate or deactivate the alarm switch.

Wiring Instructions for the BG-12, BG-12L and BG-12LSP

1)

If semi-flush mounting, proceed to step 4.

2)

Mount the backbox 

before 

wiring to the pull station.

3)

Before mounting the station, pull all necessary wiring through the backbox and optional BG-TR.

4)

Remove the correct amount of wire insulation.  The pull station backplate is molded with a strip gauge to measure the
amount of insulation to be removed.

5)

Connect the wiring from the fire alarm control panel’s IDC, or any previous device on the IDC, to terminals 1 and 2 on the
pull stations terminal strip.  Connect the next device on the IDC or End-of-Line Resistor (ELR) to terminals 1 and 2.

6)

Maintain consistent polarity with all connections throughout the IDC.

Wiring Instructions for the BG-12S

Follow instructions 1 through 3 above, and then proceed with steps 4 and 5 following:
4)

Connect the field wiring from the FACP’s IDC or the previous device on the IDC, to the pull station’s pigtails.  Connect
the positive (+) IDC wire to a red pigtail, and the negative (-) IDC wire to a black pigtail.  Next, connect the positive (+)
wire going to the next device or an ELR to the remaining red positive (+) pigtail.  Connect the negative (-) wire going to
the next device or an ELR to the remaining black negative (-) pigtail.

5)

Maintain consistent polarity with all connections throughout the IDC.

Single Action BG-12S

S T R IP   G A U G E

✵✳

 ✰

 ✔

✔✔

✐✙

✙✑

WARNING

Install the pull station in accordance with the supplied instructions, applicable NFPA standards, national and local Fire and Electrical
codes and the requirements of the Authority Having Jurisdiction (AHJ).  Conduct regular testing of the devices using the appropriate
NFPA standards.  Failure to follow these directions may result in failure of the device to report an alarm condition.  Fire  Lite is not
responsible for devices that have been improperly installed, tested or maintained.
For ADA compliance, if the clear floor space only allows forward approach to an object, the maximum forward reach height allowed is
48-inches (121.92cm).  If the clear floor space allows parallel approach by a person in a wheelchair, the maximum side reach height allowed
is 54-inches (137.16cm).

 Document 50964   Revision B   ECN 98-461   08/04/99

Dual Action BG-12L (Shown Activated)

Single Action BG-12S Pigtails

‘Pigtails’  Black in/out (-)  Red in\out (+)

BLACK

RED

Dual Action BG-12,

12L, 12LSP Wiring

123456

123456

123456

BG-12S / BG-12

9/64-inch hex wrench

 must be fully seated

to work properly

WARNING!

   Do not loop wiring under any terminals.  Break wire run to maintain IDC supervision.

STR IP G AU G E

✳ 

✰✡

 ✔

✔✔

✐✙✙✑

F ro m   FAC P

To  Ne xt A dd resa bl e D evi ce

IDC

IDC

Содержание BG-12 Series

Страница 1: ...x Mount the optional Trim Ring BG TR if necessary when semi flush mounting the unit Dual Action BG 12L Switch Contact Rating All switch contacts are rated for 0 25 A at 30 volts AC or DC The word ACTIVATED is displayed DOOR ATTACHMENT If during mounting of the pull station the door becomes de tached complete the following steps to reattach the door to the backplate The door cannot be connected to ...

Страница 2: ...nd then proceed with steps 4 and 5 following 4 Connect the field wiring from the FACP s IDC or the previous device on the IDC to the pull station s pigtails Connect the positive IDC wire to a red pigtail and the negative IDC wire to a black pigtail Next connect the positive wire going to the next device or an ELR to the remaining red positive pigtail Connect the negative wire going to the next dev...

Страница 3: ...ciones Pulsadoras Manuales de la Serie BG 12 Instalación Instale en la superficie la estación BG 12 a una caja posterior de superficie SB 10 Instale semi empotrada la BG 12 a una caja eléctrica cuadrada de 4 pulgadas 10 16cm de grupo doble o singular Instale el Anillo Embellecedor BG TR si es necesario cuando la unidad está siendo semi empotrada BG 12L de Doble Acción La palabra ACTIVATED es mostr...

Страница 4: ...bre positivo que está yendo al próximo dispositivo o a un ELR al cable flexible positivo rojo restante Conecte el alambre negativo que está yendo al proximo dispositivo o a un ELR al cable flexible negativo negro restante 5 Mantenga la polaridad consistente con todas las conexiones a través del IDC BG 12S de Acción Singular S T R IP G AU G E AVISO Instale la estación de acuerdo a las instrucciones...

Отзывы: