GENERAL DESCRIPTION

This  sensor  must  be  installed  in  compliance  with  the  control  panel  system 
installation manual. The installation must meet the requirements of the Au-
thority Having Jurisdiction (AHJ). Sensors offer maximum performance when 
installed in compliance with the National Fire Protection Association (NFPA); 
see NFPA 72.

Model CP355 intelligent ionization sensor uses a state-of-the-art sensing cham-
ber. This sensor is designed to provide open area protection and is intended 
for use with compatible control panels only.

Two LEDs on each sensor light to provide a local, visible sensor indication. 
Remote LED annunciator capability is available as an optional accessory (Part 
No. RA400Z).

The CP355 requires compatible addressable communications to function 
properly. Connect this sensor to listed-compatible control panels only.

SPACING

Fire-Lite recommends spacing sensors in  compliance with NFPA 72. In low 
air  flow  applications  with  smooth  ceilings,  space  sensors  30  feet  apart.  For 
specific information regarding sensor spacing, placement, and special appli-
cations,  refer  to  NFPA  72  or  the  S

ystem  Smoke  Detector  Application  Guide, 

available from Fire-Lite.

WIRING GUIDE

All wiring must be installed in compliance with the National Electrical Code, 
applicable local codes, and any special requirements of the Authority Having 
Jurisdiction. Proper wire gauges should be used. The installation wires should 
be color-coded to limit wiring mistakes and ease system trouble-shooting. Im-
proper  connections  will  prevent  a  system  from  responding  properly  in  the 
event of a fire.

Remove power from the communication line before installing sensors.

1.   Wire the sensor base (supplied separately) per the wiring diagram, see 

Figure 1.

2.  Set the desired address on the sensor address switches, see Figure 2.
3.   Install  the  sensor  into  the  sensor  base.  Push  the  sensor  into  the  base 

while turning it clockwise to secure it in place.

4.   After all sensors have been installed, apply power to the control unit and 

activate the communication line.

5.  Test the sensor(s) as described in the TESTING section of this manual.
6.  Tamper-Resistance
 

 Model  CP355  includes  a  tamper-resistant  capability  that  prevents  its 
removal  from  the  bracket  without  the  use  of  a  tool.  Refer  to  the  base 
manual for details on making use of this capability.

7.  After all sensors have been installed, apply power to the system.
8.   See Figure 3. Test the sensor by positioning a test magnet against the sen-

sor plastic in the magnet test area. The alarm level should be recognized 
at the panel and the LED controlled by communication command from 
the panel.

9.  Reset the sensor by communication command from the panel.

FL-400-000 

I56-3656-002R

I56-3656-00

2R

CP355 Plug-in Addressable 
Ionization Sensor

SPECIFICATIONS

Operating Voltage Range: 

15 to 32 VDC

Maximum Average Standby Current: 

300µA@ 24 VDC (one communication every 5 seconds with LED blink enabled)

Maximum Alarm Current (LED on):  

6.5 mA @ 24 VDC

Operating Humidity Range:   

10% to 93% Relative Humidity, Non-condensing

Operating Temperature Range 

32°F to 120°F (0°C to 49°C)

Height: 

2.0˝ (51 mm) installed in B350LP Base

Diameter: 

6.1˝ (155 mm) installed in B350LP Base

Weight: 

5.4 oz. (153 g)

CAUTION

Dust covers provide limited protection against airborne dust particles during 
shipping. Dust covers must be removed before the sensors can sense smoke. 
Remove sensors prior to heavy remodeling or construction.

FIGURE 1. WIRING DIAGRAm:

3

2

1

3

2

1

3

2

1

(–)

(+)

+

-

UL

 LISTED COM

P

A

TIBLE

CONTROL

 P

ANEL

CAUTION: DO NOT LOOP WIRE 

UNDER TERMINAL 1 OR 2.

BREAK WIRE RUN TO PROVIDE 

SUPERVISION OF CONNECTIONS.

CLASS A OPTIONAL WIRING

REMOTE 

ANNUNCIATOR

(–)
(+)

C0129-00

FIGURE 2:

TENS

ONES

9

10

11

12

13

14

15

8

7

6

5

4

3

2

1 0

9

8

7

6

5

4

3

2

1 0

C0162-00

TESTING

Detectors must be tested after installation and following periodic maintenance. 
However, before testing, notify the proper authorities that the smoke detector 
system  is  undergoing  maintenance  and  the  system  will  be  temporarily  out 
of  service.  Disable  the  zone  or  system  undergoing  maintenance  to  prevent 
unwanted alarms.

Testing methods must satisfy the Authority Having Jurisdiction (AHJ). Sensors 
offer maximum performance when tested and maintained in compliance with 
NFPA 72.

Test the sensors as follows:

A.  Functional: Magnet Test (P/N M02-04-01 or M02-09-00)

 

 This sensor can be functionally tested with a test magnet. The test mag-
net  electronically  simulates  smoke  in  the  sensing  chamber,  testing  the 
sensor electronics and connections to the control panel.

 

1.  Hold the test magnet in the magnet test area as shown in Figure 3.

 

2.  The sensor should alarm the panel. 

 

 Two LEDs on the sensor are controlled by the panel to indicate sensor 
status. Coded signals, transmitted from the panel, can cause the LEDs 

INSTALLATION AND mAINTENANCE INSTRUCTIONS