Finnleo Euro Outdoor Series Скачать руководство пользователя страница 7

71-0156

 

Page 7 

4215-136 

Rev. 03

 

 

10/21/2022 

12.

 

Secure the side wall to the back wall panel with (3) 

3” Torq screws. 

Install one screw on the top of the wall, one in the middle, and one 
on the bottom. 

 

13.

 

Install the remaining wall panel up to the door panel. You will 
install the door panel next to the right front wall panel before you 
install the final wall panel. 
 

14.

 

Secure left front wall panel to the left side 

wall with three 3” Torq screws. Ensure the 

tongue and groove are tight at the interior 
corner when screws are installed. 
 
 

Top Plate Installation  
 

15.

 

After installing the wall panels, install the 1” top plate. This top 

plate aligns and locks the top of the wall panels together.  

 

Note: Before installing top plates, ensure all panels are fully 
connected on top and on the corners.  

 

16.

 

Install back top plate first. Matching top plate 
with the corresponding wall panels number. 
Install notched ends facing up.  

 

17.

 

Install the left and right wall top plates notched end facing down. 
So, they fit into the notches of the corresponding top plate. 

 

18.

 

Firmly press down (use a hammer if needed) until top plates rest 
on the framework of the wall panels.  

 

19.

 

The top of the plate should be flush with the top of the interior 
tongue and groove.

 

 

 

20.

 

Secure top plates using the 2” Torque screws. Install one screw in 

each corner and one screw in the center of each wall. 

 

21.

 

Install 

½” self

-adhesive foam weather stripping on 

the top plates. Adhesive side down to the top plate.  

 

22.

 

Install corner caps to each corresponding wall panel 
make sure corner cap is flush with base of wall. 
Secure using Brad nails or finishing nails (not 
supplied),  

 
 
 

 

 

Содержание Euro Outdoor Series

Страница 1: ...autions Before Use 2 Exterior Paint Requirements 3 Receiving Shipment 4 Installation Summary Base Wall Panel 5 6 Top Plate 7 Standard Roof 8 9 Metal Roof 10 Interior 12 14 Heater Wiring Rocks 14 Commo...

Страница 2: ...s maintained in the sauna room WARNING The use of alcohol drugs or medication can increase the risk of fatal hyperthermia WARNING Prolonged exposure to elevated temperatures is capable of inducing hyp...

Страница 3: ...er vs Oil Supplier Additional Comments Western Red Cedar Paint Duration Water based Sherwin Williams Self Priming Emerald Water based Sherwin Williams Self Priming Pittsburgh Paramount Water based Var...

Страница 4: ...d of time you will have a better feel for the entire process Your sauna package will arrive on a stretch wrapped pallet including a stack of prebuilt panels benches and boxes with the heater and acces...

Страница 5: ...les are purposely made at an angle b Integral Floor rooms less than 5x7 The base frame will be built into the integral floor 2 The base rail is numbered to correspond with the panels Number 1 should b...

Страница 6: ...holes and use the supplied 3 screws to secure the two panels together 8 Continue to install each wall panel with the corresponding base number staring from your initial corner and working around the r...

Страница 7: ...p plates ensure all panels are fully connected on top and on the corners 16 Install back top plate first Matching top plate with the corresponding wall panels number Install notched ends facing up 17...

Страница 8: ...e roof panel into place without scratching the panels When in position it will rest on the top plate 26 The guide strip will align exterior of the high side wall panel until final placement is set and...

Страница 9: ...the overhanging fascia on front and back of sauna only The front side eve trim is flush to the left and right side fascia The back trim is flush to the left and right side fascia 34 Install the left a...

Страница 10: ...starting point for roof placement Note Determines the distance from the edge to the start of the metal roofing sheets 41 Begin to install the metal roofing based of your predetermined lay out of meta...

Страница 11: ...ark and cut the front ridge with a of overhang on each side 48 Install front flashing to the roof so there is of overhang on each side Secure on top with sheet meal roofing screws one 5 1 2 from each...

Страница 12: ...stall starting with the top bench support first o Position the bench supports tight into corner Making sure they are level use 3 screws and pre drilled holes to secure the bench supports to the walls...

Страница 13: ...alled on the back wall If you have a return bench the other backrest will be above the return bench 57 Place backrest finished side down on the upper bench with the LED light strip closest to the benc...

Страница 14: ...ay or may not need a low voltage connection box for the lights When using a SaunaLogic2 control the lights are hooked up inside the regular contactor box Other heaters such as the Designer Vena and ot...

Страница 15: ...auna These products will off gas during the heating cycle and could be harmful to your health The only approved product to use on the interior of your sauna is 100 pure paraffin oil Available from you...

Страница 16: ...al dealer Date of Purchase _______________________ Place of Purchase ____________________________ Enjoy Your Sauna Follow Finnleo finnleosauna on social media Tag Finnleo include MyFinnleo for a chanc...

Отзывы: