14
LOADING PROCEDURE
Take care not to lose pens, lighters, etc. from shirt pockets, or drop
pieces of paper or plastic bags into the tank, as these might plug the
slurry system. Failure to comply could result in death or serious injury. Failure to comply
could also result in product or property damage.
1. With the pump clutch disengaged (turned off), the hydraulic system turned off and the
agitator control lever in the NEUTRAL position, start the engine and allow it to warm up for
3 to 5 minutes (see STARTING PROCEDURE).
2. After the engine has warmed up, turn on the hydraulics system by flipping the hydraulics
switch to the ON position (all the way up). The switch will automatically center itself (which
is the ON position). This will allow the agitators to work when the operator moves the
control lever.
3. Start filling unit with water from one of the water sources as listed below. When water
reaches the top of agitator shaft, move agitator control lever to full REVERSE position.
Tank can be filled by using one of the sources of water as follows:
A. Water from any stream or pond using a fill transfer pump. When filling from a pond
or stream, be sure to use a suction strainer to filter out contaminants that could
damage the pump and unit.
B. Any pressure source, eg. fire hydrant. An optional air gap fill port is available for
this unit but it is necessary to consult with local authorities before using a water
main, in order to abide by all local ordinances.
C. Water tanker.
3. Piping System Cleanout Procedure (Purging Line):
A. Remove discharge nozzle and coupler gasket from the remote valve coupler at the
end of the discharge hose (or from boom on the platform / loaded options).
B. Aim discharge hose (or boom on the platform / loaded options) into an open area
away from any persons, obstructions, or high voltage power lines.
C. Open discharge and / or remote valve and close recirculation valve.
D. Turn on the pump clutch by flipping the clutch toggle switch to the CLUTCH ON
position (all the way up). The switch will automatically center itself, which is the ON
position.
E. Open throttle to approximately 1/2 to 3/4 full.
F. When discharge stream is clear, open recirculation valve and close discharge
and / or remote valve. After recirculation stream is clear, disengage (turn off) pump
clutch.
G. Replace coupler gasket in the remote valve coupler (or in boom on the platform /
loaded options).
4. Continue filling tank with water.
5. Increase engine speed to full rpm.
Содержание T60S HydroSeeder
Страница 2: ...II II...
Страница 36: ...30 6 1 4 5 2 7 9 2 8 10 3 10 9 Figure 7 Lubrication and Adjustment Points...
Страница 40: ...34 34...
Страница 41: ...T60 CE ML1015 35 T60S HydroSeeder CE Compliant Parts Section Model ML...
Страница 65: ...T60 CE ML1020 59 WHEN ORDERING PARTS BE SURE TO STATE SERIAL NUMBER OF MACHINE CONTROL PANEL LOADED UNIT WIRING...
Страница 68: ...T60 CE ML1020 62 WHEN ORDERING PARTS BE SURE TO STATE SERIAL NUMBER OF MACHINE 1 2 3...