16
NOTICE
Hydraulic system will overheat if agitator shaft is jammed for extended period. This will
damage hydraulic oil and system components.
B. Fiber mulch – Empty the entire bag or cut open bag and drop in the sections of fiber.
The amount of mulch to be used should be loaded by the time the water level is at
3/4 full. If agitator stalls, or a high-pitch squeal comes from the hydraulic system,
reverse agitation to FORWARD for a moment to clear the obstruction, then return
agitation to REVERSE.
C. Fertilizer – Cut open the fertilizer bag and dump contents into slurry tank.
D. All other additives – Consult with manufacturer for proper loading technique.
7. When all materials are loaded and in suspension, and the tank is full, move the agitator to
NEUTRAL then full speed FORWARD to ensure all material is mixed. It may be necessary
to change the agitator direction more than once to ensure a thorough mixture.
8. After material is thoroughly mixed, slow agitator in forward direction to 1/2 to 3/4 speed, or
enough to create movement in all of the corners of the tank. Do not over-agitate the slurry.
Always discharge the material with the agitator control in the FORWARD position.
9. Close hatch lid on slurry tank.
NOTE:
If foaming occurs, reduce agitator speed.
LOADING AND MIXING BFM, FGM, SMM AND OTHER HIGHLY VISCOUS
SLURRIES
1. With clutch disengaged (turned off) and agitator control in the NEUTRAL position, start
engine and allow it to warm up. See STARTING PROCEDURE page 12.
2. Start filling unit with water from one of the water sources as listed below. When water reach-
es the top of agitator shaft, move agitator control to full REVERSE position.
Tank can be filled by using one of the sources of water as follows:
A. Water from any stream or pond using a fill pump. When filling from a pond or stream,
be sure to use a suction strainer to filter out contaminants that could damage the
pump and unit.
B. Any pressure source, eg. fire hydrant. An optional air gap fill port is available for this
unit but it is necessary to consult with local authorities before using a water main, in
order to abide by all local ordinances.
C. Water tanker.
3. Piping System Cleanout Procedure:
A. Remove discharge nozzle and coupler gasket from the remote valve coupler at the
end of the discharge hose (or from boom on the platform option).
B. Aim discharge hose (or boom on the platform option) into an open area away from
any persons, obstructions, or high voltage power lines.
C. Open discharge and remote valves and close recirculation valve.
D. Open throttle to approximately 1/2 to 3/4 full.
E. Engage (turn on) clutch with a firm snap. Do NOT allow clutch to slip.
Содержание HydroSeeder T60-II MD
Страница 2: ...II NOTES II...
Страница 36: ...30 6 1 4 5 7 2 7 9 9 2 8 10 3 Figure 7 Lubrication and Adjustment Points...
Страница 38: ...32 NOTES 32...
Страница 54: ...48 WHEN ORDERING PARTS BE SURE TO STATE SERIAL NUMBER OF MACHINE LBT60 MO 1 2 3 4 5 6 7 8 9 10 11 12 13...
Страница 64: ...58 NOTES 58...