FILL-RITE 800C Series Скачать руководство пользователя страница 2

4

*

These parts are in the 800C Series Repair Parts Kit..

WHEN ORDERING REPAIR PARTS, BE

SURE TO GIVE REPLACEMENT PART

NUMBER, DATE OF MANUFACTURE

AND METER SERIES NUMBER.  THIS

WILL ENSURE THAT THE CORRECT

REPLACEMENT PART IS SUPPLIED.

TOLL FREE CUSTOMER SERVICE

NUMBER

800 634 2695

2. If indicated amount does not match known volume, insure

pump is off and pressure relieved, then remove seal screw

(item 23) and turn calibration screw (item 21)

counterclockwise to reduce indicated amount or clockwise

to increase the amount.  A full turn will change the indicated

amount by approximately 0.1 Gal. (0.4L).  Reinstall seal

screw

3. Repeat step 2 until calibration is acceptable.

For accurate measurement, meter and piping must always be

filled with liquid and free of air.  Meter should be calibrated per

instructions in this manual prior to its use.

1. Reset meter to “0”.

2. Meter is ready for use.  Do not exceed 50PSI line pressure.

Meter should operate maintenance free.  However, certain

liquids can dry out while in the meter housing, causing meter

to stop.  If this happens, meter should be thoroughly cleaned

(see instructions below).

REPAIR

OPERATING INSTRUCTIONS

MAINTENANCE

Cleaning Instructions

Run a flushing fluid through meter.  For a more thorough

cleaning, disassemble meter per “ASSEMBLY/

DISASSEMBLY” section, “Meter Chamber Assembly”

subsection.  Rinse all meter components.  Recalibrate meter

following calibration instructions above.

Storage

If meter is to be stored for a period of time, clean thoroughly.

This will help protect meter from damage.

Meters needing repair should be taken to an authorized repair

shop or returned to factory for service.  Meters must be

thoroughly triple-rinsed before being taken in for repair.

Отзывы: