![FieldServer ProtoCarrier FPC-C01 Скачать руководство пользователя страница 21](http://html.mh-extra.com/html/fieldserver/protocarrier-fpc-c01/protocarrier-fpc-c01_startup-manual_2287867021.webp)
ProtoCessor/ProtoCarrier Start-Up Guide
Page 21 of 34
ProtoCessor
1991 Tarob Court Milpitas, California, 95035 USA
Web
: www.protocessor.com
Tel
: (408) 964 4444
Fax
: 408-262-2269
Toll Free
: (888) 509 1970 x141
8.1.2
FPC- F04
Light
Description
PWR
This is the power light and should show steady green at all times when the FFP-F04 is powered.
LA-PIC A
Starts flashing about once per second to indicate that the PIC in the ProtoCessor has powered up
successfully
GP105
Will go on solid within 45 – 60 seconds after power up, signifying normal operation. The ProtoCessor
will be able to access RUINET shortly after this LED comes on. During the first 45-60 seconds the LED
should be dark.
Upon successful operation of
GP105 t
he ProtoCessor will go through diagnostics of the field port
communications.
RX
On normal operation of FFP-F04, the RX LED will flash when a message is received on the LON port of
the ProtoCessor.
TX
On normal operation of FFP-F04,, the TX LED will flash when a message is sent on the LON port of the
ProtoCessor
LON
When the unit is first powered up, before commissioning has occurred, this LED will flash. Once the
unit is commissioned, the LED will stay off during normal operation
Rx
Tx
LA
PWR
GP105
LON