Field Controls CK-43 Скачать руководство пользователя страница 6

 

Page 6

SYSTEM CONTROL CHECK OUT PROCEDURES 

1.  Adjust the thermostat to call for heat and observe the power venting system for proper operation sequence  

(Repeat if necessary). 

a.  Thermostat calls for heat. 
b.  Relay is energized and venter motor starts. 
c.  Pressure switch closes and burner  starts. 
d.  Thermostat is satisfied, the burner stops. 
e.  This starts the post purge cycle. 

2.  While system is operating disconnect  power to the venter motor. This should open the pressure switch 

contacts and  stop burner operation. 

TROUBLE SHOOTING HINTS 

1.  Main burner does not fire when thermostat calls for heat with venter  operating. 

a.  Check pressure switch adjustment. 
b.  Check wiring connections between pressure switch and burner. c. Check pressure switch for conti-nuity 

across terminals, during venter operation. 

2.  Venter does not activate when thermostat calls for heat. 

a. Check 

wiring. 

b.  Check relay for proper operation. 

3.  Flue gas odor. 

a.  Check system draft. 
b.  Check for negative pressure in building. 
c.  Check post purge time. 

MAINTENANCE 

1. 

Motor:

 Inspect motor once a year, the motor should rotate freely. 

2. 

Wheel:

 Inspect venter wheel annually to  clear any soot, ash or coating which inhibits either rotation or  air 

flow. Remove all foreign  material before operating. 

3. 

Vent System:

 Inspect all vent pipe connections annually for looseness and for evidence of flue gas 

leakage. Seal or tighten  pipe connections if necessary.

 

 

Содержание CK-43

Страница 1: ...luminum tubing 1 1 4 inch tubing connector 1 Flexible conduit connector 1 4 MG1 Barometric Draft Control or 5 AF Barometric Draft Control This device MUST be installed by a qualified agency in accordance with the manufacturers installation instructions The definition of a qualified agency is any individual firm corporation or company which either in person or through a representative is engaged in...

Страница 2: ... the CK 43 junction box or installer supplied junction box onto the wall or floor joist without straining the flexible conduit Fasten the CK 43 junction box through the four dimpled locations on the base of the box See Figure 3 PRESSURE SWITCH SENSING TUBE INSTALLATION 1 Attach the 1 4 inch tubing connector to the pressure tube on the SWG Venter See Figure 3 2 Connect the supplied 1 4 aluminum tub...

Страница 3: ... at the front corners of the collar Bend 90 degrees 1 4 inch behind the single hole on the straps 2 Insert clamping screw in ears on collar and bolt the remainder of the collar together 3 Hold the collar against the side of the flue in the exact position it is to be installed shown by dotted lines and mark the outline of the collar on the flue 4 Cut a hole in the flue about 1 2 inside of this outl...

Страница 4: ...e 8 DO NOT move the weight attached directly to the gate this is used only for balancing at the factory ADJUSTING THE DRAFT CONTROL WITH 5 AF Vertical Flues Mounting The control is shipped for installation in a vertical flue The adjustment weight should be in the right hand slot when you face the control See Figure 9 Horizontal Flues Mounting For hori zontal flues remove the weight from the right ...

Страница 5: ...the timer adjustment counterclockwise For timer that looks like Figure 12 Rotate the timer adjustment on the timer counterclockwise to increase the operation time To decrease the operation time rotate the timer adjustment clockwise Typical post purge time should be between 3 to 5 min WIRING CAUTION Disconnect electrical power when wiring power venter NOTE If using this control kit with an electron...

Страница 6: ...nter operating a Check pressure switch adjustment b Check wiring connections between pressure switch and burner c Check pressure switch for conti nuity across terminals during venter operation 2 Venter does not activate when thermostat calls for heat a Check wiring b Check relay for proper operation 3 Flue gas odor a Check system draft b Check for negative pressure in building c Check post purge t...

Страница 7: ..._ INSTALLER S NAME _____________________________________________________ INSTALLER S COMPANY _________________________________________________ INSTALLER S PHONE NO ________________________________________________ DATE OF INSTALLATION _________________________________________________ CK 43 Control Kit ...

Страница 8: ...Page 8 P N 46190700 Rev D 11 07 ...

Отзывы: