MY Series (10kVA-40kVA) UPS
User Manual
3 Installation
33
Figure3-12
Wiring terminal silk-screen
Three-phase identify methods adoption U, V, W. Corresponding to A phase, B phase and C phase or R
phase, S phase and T phase.
33 mode
Connect the wires to corresponding port according to the wiring diagram, as shown in Figure3-13.
Figure3-13
Wiring diagram of 33 mode
31 mode
Take out a couple of copper bar 1# and 2#, connect them to the wiring terminal of UPS (as shown in
Figure3-14). Then connect the wires to corresponding port according to the wiring diagram.
Содержание MY Series
Страница 1: ...User Manual MY Series 10kVA 40kVA UPS ...
Страница 2: ......
Страница 94: ...5 Touch Screen Operation MY Series 10kVA 40kVA UPS User Manual 86 Figure5 53 Confirm to turn off page ...
Страница 110: ...4402 02982 001 ...