FiberHome AN6000-7 Скачать руководство пользователя страница 3

2

1

Installation Procedure

End

Routing and connecting 

cables

Post-installation 

inspection

Preparation for cable 

connection

Cabinet with routed 

fibers and cables

Connecting cables

Connecting optical 

fiber jumpers

Checking the connection 

and layout of wires and 

cables

Checking before power-on

Power-on test

Installing cabinet doors

2

Safety precautions

Installation tools

Start

Installation preparations

Installing cabinets

Installing subracks

Installing cards and 

components

Operation procedure

Reference information

Subrack overview

Installing and 

securing subracks

Equipment layout

Installing cards

Installing a fan unit

Operation rules for 

plugging / unplugging 

optical modules

Requirements and 

precautions for operating 

cards

Содержание AN6000-7

Страница 1: ...AN6000 7 Optical Line Terminal Equipment Quick Installation Guide FiberHome Telecommunication Technologies Co Ltd Version A Code MN000004297...

Страница 2: ...ecommunication Technologies Co Ltd Address No 67 Guanggu Chuangye Jie Wuhan Hubei China Zip code 430073 Tel 6 03 7960 0860 0884 for Malaysia 91 98 9985 5448 for South Asia 593 4 501 4529 for South Ame...

Страница 3: ...es Checking before power on Power on test Installing cabinet doors 2 Safety precautions Installation tools Start Installation preparations Installing cabinets Installing subracks Installing cards and...

Страница 4: ...ged in good order and the extra parts of ties are cut from the root without leaving sharp points Binding Cables Caution Prior to equipment installation inspect the equipment room cabinets power suppli...

Страница 5: ...ic drill including the drill bits Marker pen Insulating tape Long tape Knife Spirit level Claw hammer insulated Cable tie Fiber binding strap Insulating gloves Hydraulic pliers Flat screwdriver insula...

Страница 6: ...te 1 266 mm 480 mm 253 8 mm excluding the fiber passage unit Subrack with mounting ears for a 21 inch cabinet 266 mm 530 mm 253 8 mm excluding the fiber passage unit Note 1 The AN6000 7 subrack is equ...

Страница 7: ...r 21 inch cabinet The distance between every three mounting holes on the front vertical mounting flange in a 19 inch cabinet is 1 U 44 45 mm The distance between every two mounting holes on the front...

Страница 8: ...nuts Push the subrack into the cabinet along the slide rails Installing Components Correct Way to Install a Screw Pre tighten the screw Tighten the screw with moderate force making sure that the screw...

Страница 9: ...subrack into the cabinet along the slide rails Installing Components Adapter Mounting Ears Install the adapter mounting ears 4 5 6 When installing the adapter mounting ears install the panel screws bu...

Страница 10: ...panels When you unplug a dummy panel make sure that you plug it back in five minutes Use care when plugging a card The card cannot be inserted if not properly oriented Cards are valuable and fragile P...

Страница 11: ...cage 10 Grab the handle of an optical module with the hooked end of a fiber puller and draw it out to detach the optical module from the EMI cage Pulling an optical module Pulling an optical fiber hoo...

Страница 12: ...ot in a correct direction Do not force in the card The core switch card power card and CIOA card have color marks on both ends Apply the cards to the slots with the same color marks to prevent mismatc...

Страница 13: ...op access wiring mode or the floor access wiring mode according to the equipment room and the installation site conditions This guide uses the top access wiring mode as an example The AN6000 7 uses th...

Страница 14: ...13 10 Cabinet with Routed Fibers and Cables A Subrack for PON Services 13...

Страница 15: ...ower cables Do not connect the cabinet power cables when the power supply is connected Make sure the DC power input is cut off during cable connection and attach labels to the switches to be used Neve...

Страница 16: ...s to the PDP and the external power supply respectively The terminals on the PDP from left to right are 48V_A 0V_A 0V_B PE and 48V_B respectively 4 M3 To the external 48 V DC power Processing External...

Страница 17: ...les Completely insert the cord end terminals into the terminal blocks on the PDP To ensure good connection the metal part exposed should not exceed one sixth of the overall metal length The length of...

Страница 18: ...DP850A 3000064 to output the subrack alarms to the PDP 1PPS TOD interface of the CIOA card Connected to an external clock device Note 1 DC1 7 interface of the CIOA card Connected to a dry contact devi...

Страница 19: ...e bunch is between 10 mm and 30 mm the distance between two adjacent cable ties should be 200 mm When the diameter of the cable bunch is equal to or larger than 30 mm the distance between two adjacent...

Страница 20: ...ations and appearances of the commonly used LC PC and SC PC optical fiber connectors When the equipment is mounted in a 300 mm deep cabinet it is advisable to use short optical fiber connectors Type S...

Страница 21: ...the GPOA EXOA GMOA GNOA card LC PC connector SFP ports 1 to 4 of the HSCA card Connected to an IP network to provide GE and 10GE optical channels Ports 1 to 8 of the HU8A card Connection Optical fiber...

Страница 22: ...ng straps Tidy up optical fibers before binding them Bind optical fibers with fiber binding straps with appropriate tightness Avoid crossing or twisting optical fibers whenever possible 13 3 Arrangeme...

Страница 23: ...pment installers should 1 Confirm that the cabinet power cables are correctly connected with the external power supply equipment 2 Confirm that all the wires and cables are connected correctly 3 Place...

Страница 24: ...optical fiber Put an anti dust cap on an unused optical module Do not bind optical fibers with cable ties Use the black fiber binding strap instead Tidy up big bundles of cables and avoid crossing or...

Отзывы: