Installation of the Switch 2
:
1. Switch off the mains voltage (disable the fuse).
2. Open the wall switch box.
3. Connect with one of following the diagrams for appropriate
device:
single switch
double switch
Wiring diagrams - Single Switch 2
NOTE
Switch connected to
the S1 terminal is a
master switch. It acti-
vates the basic func-
tionality of the device
(turning the first load
on/off) and activates
the learning mode
(adding/removing).
The switch connect-
ed to the S2 ter-
minal turns on/of
the second load in
Double Switch 2,
but is optional in
Single Switch 2 and
pushing it will not af-
fect the status of the
device.
i
B
Q1
L
N
S1 S2 L
L
N
B
Q1
L
N
S1 S2 L
L
N
SINGLE
SWITCH 2
FGS-213
SINGLE
SWITCH 2
FGS-213
single switch
double switch
Wiring diagrams - Double Switch 2
B
Q1
L
N
S1 S2 Q2
L
N
B
Q1
L
N
S1 S2 Q2
L
N
DOUBLE
SWITCH 2
FGS-223
DOUBLE
SWITCH 2
FGS-223
4. After verifying correctness of the connection switch on the mains
voltage.
5. Add the device to the Z-Wave network (see “Adding/removing the
device” on page 8).
6. Turn off the mains voltage, then arrange the device and its anten-
na in a wall switch box.
7. Close the wall switch box and turn on the mains voltage.
NOTE
After switching on the
mains voltage lED
indicator will signal
Z-Wave network in-
clusion state with a
colour:
GREEN
- device added
RED
- device not added