background image

19

FIA

T DUCA

TO NA

TURAL POWER

PERFORMANCE

Top speed in km/h

Modifications or repairs to
the fuel feed system that are

not carried out properly or do not
take the system’s technical specifica-
tions into account can cause mal-
functions leading to fire risk. 

ATTENZIONE

N.B. 

The passage from running on

methane to petrol involves the immediate
insertion of the maximum speed limit to
90 Km/h. As such, after the first methane
reserve warning, refuel as quickly as pos-
sible, and in any case prior to the second
warning that the gaseous fuel (two beeps),
in order to avoid ‘risk’ conditions, such as,
for example, overtaking at high speeds on
the motorway. 

Petrol function is for emergency purposes
only. In order to guarantee good indepen-
dence, even where there is limited tank ca-
pacity, performance is limited such as speed
or, as for take-off, acceleration (particu-
larly uphill). 

As such, before embarking on demand-
ing journeys and/or routes, in terms of
load or road conditions, it is advisable to
ensure that the gaseous fuel canister is full.

Running 
on petrol:

90

Running 
on methane:

Version MH1

159

Version MH2

155

Version LH3

153

603_83_954 Ducato Nat Power GB  25-03-2009  15:03  Pagina 19

Содержание DUCATO NATURAL POWER

Страница 1: ...N A T U R A L P O W E R F I A T D U C A T O 603_83_954 Ducato Nat Power GB 25 03 2009 15 03 Pagina 1...

Страница 2: ...S 7 PIPING 8 PRESSURE REGULATOR REDUCTION UNIT 8 METHANE INJECTORS 8 OIL SEPARATOR FILTER 8 STARTING THE ENGINE 9 PROTECTIVE FUSES 9 FUEL SWITCHING LOGICS 10 LIMITATIONS OF USE 11 SYSTEM FAILURE SIGNA...

Страница 3: ...ural Power has been de signed to run on methane Petrol func tioning is restricted to situations where the user has not managed to fill up on methane prior to having entirely run out Engine performance...

Страница 4: ...ersion has the same active safety features as the other versions The Fiat Ducato Natural Power version is equipped with a high pressure methane system designed to run at 200 bar It is dangerous to for...

Страница 5: ...em functional diagram Fig 1 1 Methane canisters 2 Methane repressurising filler 3 Methane piping 4 Pressure regulator reduction unit 5 Methane injector carrier manifold 6 Petrol tank 7 Oil separator f...

Страница 6: ...STERS The vehicle has five canisters total ca pacity about 218 litres located under the floor of the vehicle and protected by two special guards The canisters are the tank that contains the methane in...

Страница 7: ...ster is sufficient for operation the engine is running the inertia switch has not been trig gered The solenoid valve assembly is equipped with the following safety devices 1 Fuse pad in the case of ov...

Страница 8: ...essure of the methane from the value in the can ister to the supply value for the methane injectors about 6 bar and keeping it con stant in all operating conditions METHANE INJECTORS There are 4 dedic...

Страница 9: ...se solenoid valves F27 10 Methane relay solenoid valves T21 20 STARTING THE ENGINE The following describes the various dif ferent ways in which the engine is started depending on vehicle conditions ME...

Страница 10: ...of keeping the petrol fuel supply system fully efficient fig 7 F0N0402m The general recommendation is to avoid emptying the petrol tank com pletely as this may lead to a risk for the driver after havi...

Страница 11: ...as for take off acceleration particularly uphill As such before embarking on demanding journeys and or routes in terms of load or road conditions it is advisable to en sure that the gaseous fuel canis...

Страница 12: ...with the vehicle documentation contain the date for the first inspection of the canisters Those responsible for the methane supply are not authorized to refill the canisters when the inspection date...

Страница 13: ...ster expiry date month year FABER name of canister manufacturer canister regis tration number L nominal canister capacity in litres KG weight of canister kg specific for each canister 20 0MPa15 C oper...

Страница 14: ...ioning clip holding Check tightening torque of canister fastening bands Check electrical connections and that engine wiring is intact Check tyre conditions wear and adjust pressure if required Check l...

Страница 15: ...t handbrake lever stroke if required Check exhaust emissions Check cleanness of locks and lever cleanness and lubrication Change engine oil and oil filter Replace air cleaner cartridge Top up fluids e...

Страница 16: ...NATURAL POWER VEHICLE RAISING POINTS Arrange the jack near the lift support closest to the wheel to be replaced at the points shown in fig 12 F0N0399m fig 12 603_83_954 Ducato Nat Power GB 25 03 2009...

Страница 17: ...es per cylinder 4 Piston bore and stroke mm 95 8 x 104 Total displacement cm3 2999 Compression ratio 12 5 0 5 1 kW Max EEC power HP corresponding speed rpm Nm Max EEC torque kgm at a speed of rpm Spar...

Страница 18: ...C 120 Multijet D 160 Multijet E 130 Multijet G 140 Natural Power TRANSMISSION M Manual gearbox A Automatic gearbox BODYWORK A Chassis cab frame B Platform frame without drive cab C Platform chassis c...

Страница 19: ...ior to the second warning that the gaseous fuel two beeps in order to avoid risk conditions such as for example overtaking at high speeds on the motorway Petrol function is for emergency purposes only...

Страница 20: ...2 XLH2 2285 2310 2350 2685 2485 2400 2445 1215 1190 1150 815 1015 1100 1055 1850 1850 2100 1850 2100 2100 2100 2000 2000 2400 2000 2400 2400 2400 3500 3500 3500 3500 3500 3500 3500 2500 2500 3000 2500...

Страница 21: ...ause as well as the driving conditions and vehicle mainte nance it also depends on the temperature of the gas in the canister The methane actually heats up during the refuelling and cools down whilst...

Страница 22: ...xtra urban cycle IMPORTANT The type of route traffic conditions weather conditions driving style state of the vehicle in general trim level equipment accessories use of the cli mate control vehicle lo...

Страница 23: ...23 FIAT DUCATO NATURAL POWER NOTES 603_83_954 Ducato Nat Power GB 25 03 2009 15 03 Pagina 23...

Страница 24: ...iles S p A Customer Services Technical Services Service Engineering Largo Senatore G Agnelli 5 10040 Volvera Torino Italia Print no 603 83 954 03 2009 1 Edition 603_83_954 Ducato Nat Power GB 25 03 20...

Отзывы: