27
Programming
The "
Programming
" menu allows to manage weekly schedules. In this way, the boiler
communicates the ON request following the set daily program. Time resolution is 30
minutes. Selecting "
Set program
", in the "
Programming
" sub-menu will open a
screen where it is possible to change the weekly schedule.
In the "
Day
" row, use the
▲
(
SW7
)
[+]
and
▼
(
SW6
)
[-]
keys to select the day of the
week to program. A reminder of the corresponding daily program is shown underneath.
Taking "
Monday
" as an example, touch
■
(
SW5
)
[OK]
to enter time band
programming.
The time bands are programmed in three steps:
1) Time band start (to select band start time)
2) Request (to set the heat request)
3) Time band end (to select the band end time)
In the first step, enter the start time using the
▲
(
SW7
)
[+]
and
▼
(
SW6
)
[-]
keys, with
minimum intervals of 15 minutes, and confirm
by touching
■
(
SW5
)
[OK]
. To abandon the
programming for the selected day and switch to
another day, simply touch
◄
(
SW3
)
[ESC]
.