Page
6
of
28
All
Vizu 400 Pass Through Multi Stack’s
have been tested and checked for proper
operation before leaving the factory.
Upon delivery please check the unit for damage. If the unit is damaged, contact the carrier,
or Fast Food Systems, immediately and file a damage claim (found in the back of the
manual) Please retain all packing materials.
Damage must be reported within 7 days of delivery
General Description
The unit has been designed to hold cooked foods in a humid atmosphere. Being a pass-thru
unit the machine can be loaded from one side and unloaded from the other.
Assembly and Installation Instructions
1.
Unpack machine from packaging
2.
Peel all surfaces of plastic film and wipe down with warm soapy water
3.
Position machine on a level surface
4.
Machine must be affixed to a fresh mains water supply, or side mounted bottle filled
daily with fresh water
5.
Machine must be plugged into a 13Amp power supply.
6.
Install all removable parts including; Element Cover, Side mounted ‘Rack Supports’,
Gastro Pans and wire racks.
7.
Install racking by sliding it into the ‘Rack Supports’
8.
Make sure all parts are seated correctly by checking all parts at both sides of the
machine.
Содержание Vizu 400 Pass Through Multi Stack
Страница 5: ...Page 5 of 28...
Страница 14: ...Page 14 of 28 Wiring Diagram...
Страница 25: ...Page 25 of 28 Notes...
Страница 26: ...Page 26 of 28 Notes...
Страница 27: ...Page 27 of 28 Notes...