Fetco E1231IN-1B123-PM000 Скачать руководство пользователя страница 15

Go to fetco.com for the latest versions of all information         

Page 15

      

User Guide & Operator instructions

   

P211

e0

November 2021

 

 

(For Qualified Service Technicians Only) 

General:  

1.  If not installed correctly by qualified personnel, the brewer will not operate properly, and damage may result. 

2.  Utilize only qualified beverage equipment service technicians for service and installation. 

3.  Always have an empty dispenser under spray head of all coffee brewing equipment-including when at idle  

4.  Damages resulting from improper installation are not covered by the warranty and will void the warranty. 

  Below are the key points to consider before installation: 

 

Electrical:  

1.  All CBS_Series brewers require 

an electrical ground wire

.  Installation without grounding is dangerous. 

2.  Note Equipotentiality Terminal, if present, 

(To identify the terminals which, when connected together, bring the various parts 

of equipment or of a system to the same potential, not necessarily being the earth (ground) potential, e.g. for local bonding.)

 

3.  Verify voltages, polarity, circuits, and circuit breaker access before attaching equipment. 

4.  Brewers in this series wire differently in regard to a neutral wire.  Review the wire diagrams. 

5.  The electrical diagram is located in the User’s Guide and online at www.fetco.com. 

6.  Make sure of the tight grounding of the equipment and use the external ground bolt. 

7.  The installation must comply with applicable federal, state, and local codes having jurisdiction at your location.  

Check with your local inspectors to determine what codes will apply. 

See wiring diagrams on pages 27 to 29 for connections 

 

Plumbing:  

1.  North America: All installations must comply with applicable federal, state, or local plumbing codes. 

2.  All Others:  The water and waste piping and connections shall comply with the International Plumbing Code, 

International Code Council (ICC), or to the Uniform Plumbing Code (IAPMO). 

3.  Install a backflow prevention device.  Most municipalities require a recognized backflow preventer 

 

 

Usable on all hot beverage and cold beverage equipment is a WATTS® SD-2 or SD-3.   

 

 

WATTS spring loaded double check valve models are accepted by most zoning authorities. 

 

 

The check valve should be as close to the water supply inlet of the beverage equipment as possible 

4.  All beverage equipment must use a water filter.  A finishing carbon filter is preferred 

5.  Install the filter unit after a water shutoff valve and in a position to facilitate filter replacement. 

6.  The water line and newly installed filter cartridge must be flushed thoroughly prior to connecting it to the brewer to 

prevent debris from contaminating the machine 

7.  Verify that the water line will provide a flow rate of at least 1½gpm/(5.7lpm) per minute and the water pressure is 

between 20-75 psig (138-517kPa) before making any connections 

8.  Only use the supplied factory fitting to attach water supply line to brewer (shipped in brew basket) 

9.  The suppled fitting is a 3/8” flare/compression fitting for 1/4” supply line.  Other adaptors may be substituted. 

10. Hand tighten the factory fitting when connecting the stub on the brewer. This will reduce stress on the internal 

connections and reduce the possibility of leaks developing after the install has been completed 

 

Tank Drain 

The water tank must be drained before maintenance procedures, and when the unit is to be relocated or shipped. 

Drain is for service use only and must not be permanently connected.  NOTE: Never plumb a water line to the drain. 

 

1. Disconnect power and water to unit. DANGER: Ensure that all utility connections to the brewer are broken. 
2. Move the unit near a sink or obtain a container large enough to hold four gallons of water.   

Note:  The hot water tank of the CBS-1231 may hold up to 3.3 gallons; the CBS-1232 up to 6.0 gallons. 

3. Remove the front panel and tank cover and allow the tank to cool to a safe temperature 
4. The tank drain line and clamp are located inside-under the hot water tank.  Pinch the drain line clamp to close 
5. Locate the fill valve against the back wall, using pliers, loosen the hose clamp and move it back over the tube. 

Note Do not loosen the hose clamp to the bottom of the hot water tank  

6. Crimp the tube an inch or two away from the drain plug to prevent water from flowing and pull it off the valve.  

7. Pull the tube end out of the brewer and position over sink or bucket. 
8. Release the crimped tube and hose clamp and allow the water to flow into the sink or container. 
9. Reverse steps 4-8 when service is complete.  Ensure pinch clamp is open and hose clamps are in place. 

 
 
 
 
 

 

Brewer 

Hot Water Tank Capacity 

OPEN 

Leave open for use 

 

PINCH SHUT 

To drain tank & service brewer

 

AI

!

 

CBS-1231 Single 

3.3  gal 12.3 liter 

CBS-1232 Twin 

6.0 gal 22.4 liter 

Содержание E1231IN-1B123-PM000

Страница 1: ...de and Operator Instructions CBS 1231 CBS 1232 Extractor Plus Brewing System FETCO PLUS Commercial Beverage Equipment CBS 1232 CBS 1232 3 0 4 0 Extractor Plus Brewers shown with 2 2 liter Air Pot sold...

Страница 2: ...y Weight Filled Weight Shipping Weight Shipping Dimensions CBS 1231 Brewer 27 3 4 in 700 mm 11 3 4 in 300 mm 20 in 520 mm 3 3 gallon 12 4 L 29 lbs 13 2 kg 55 lbs 25 0 kg 41 lbs 18 6 kg 30 x 17 x 22 76...

Страница 3: ...erminal Block 1 10 9 13 0 7 7 gal 29 1 L CBS 1231PLUS 3 0 4 0 Lit er Coffee B rewers C E m odels Electrical and Output Specifications Schuko cor d and pl ug 50Hz SKU Voltage Heater C onfiguration Wire...

Страница 4: ...rew basket 5 Select a batch hold the corresponding BREW button in for 1 second to start 6 STOP button will illuminate Countdown time will display Selected BREW button will flash to indicate brew is in...

Страница 5: ...90 Copy Batch B13 Filter Life F14 Override Lt BBS See Page 12 A91 Copy Batch From F15 Override Rt BBS A92 PASTE To F16 Override Lt BBL F17 Override Rt BBL Left and Right top and middle batches are per...

Страница 6: ...30 minutes 2 00 12 00 0 30 Default total brew time is 5 30 minutes A2 30 Prewet Perc 0 0 00 25 0 1 Percentage of total brew volume A2 40 Prewet Delay Brew pause after prewet completes 0 1 00 Min 0 10...

Страница 7: ...mperature ft m Suggested Setting F Boiling point F Suggested Setting C Boiling point C 0 0 205 212 0 96 100 0 500 152 205 211 0 96 99 5 1000 305 200 210 1 93 98 9 2000 610 200 208 1 93 97 8 2500 762 2...

Страница 8: ...ncrements Notes D1 Heater SSR Test Press button 2 to test button 1 stops test Activates heater Default is 10 sec Toggle OFF or ON Energizes Heater s WARNING Service use only D2 Fill Valve Test Press b...

Страница 9: ...47G 61oz 1 05 1 60Liter 0 39 0 55G 50 71 fl ounces 0 05L 0 01G 1 oz Adjusts flow rate E6 LT Bypass valve flow rate 1 30 liters minute 0 36 gallon minute 46 ounces minute 1 10 1 65Liter 0 28 0 42G 37...

Страница 10: ...NO Follow prompts Saves settings Insert blank USB F9 Restore From USB Applies settings from USB Insert USB Will need reboot F10 Restore Defaults NO NO YES Reset to factory When selecting F10 RESTORE...

Страница 11: ...r short potting during brew cycle Investigate cause of low flow rate Clogged water filter 101 Error on refill Tank did not refill within expected time Water supply flow rate is too low Watch for short...

Страница 12: ...Volume LT Left brew valve flow through volume Gallons Liters Totalized volume through left valve CBS 1232 only G27 A Lt Brew Volume R G28 A Rt Brew Cycles LT Right brew valve operation on off Count T...

Страница 13: ...en From SAVE screen Press button 2 to toggle to the SAVE YES screen To SAVE and EXIT Press button 1 to SAVE your changes and EXIT NOTE User Settings will be erased and overwritten to factory default s...

Страница 14: ...er such as URNEX TABZ DIP IT or Squeak n Clean 2 Carefully Follow the instructions supplied with the cleaning product 3 Never use spray cleaners solvent solvent based cleaner or petroleum based polish...

Страница 15: ...possible 4 All beverage equipment must use a water filter A finishing carbon filter is preferred 5 Install the filter unit after a water shutoff valve and in a position to facilitate filter replacemen...

Страница 16: ...nit warranty and may lead to electric shock or burn as well as damage to unit and or its surroundings 7 If the power cord requires repair or replacement it must be performed by the manufacturer or aut...

Страница 17: ...1232 4 required for CBS 1231 Legs are sent from factory inside brew basket Attach legs before installing 2 Adjust dispenser locator for either 3 Liter 1 Gallon dispensing Set Dispenser Locator Shown...

Страница 18: ...rts Diagram CBS 1231 Drawing 1101 00570 00 Parts CBS 1231 6 Part Number1102 00471 00 ELECTRICAL COMPONENT LATTICE 2 1 2 legs Extends to 3 5 8 Part number 1073 00016 00 3 required for CBS 1232 4 requir...

Страница 19: ...41 31 11 1082 00017 00 SCREW TRUSS HD PHIL MACHINE 6 32 X 1 2 LG 32 1 1046 00035 00 LABEL WARNING TO REDUCE RISK OF ELECTRIC SHOCK OR FIRE 33 1 1402 00098 10 HARNESS LOW AMP CBS 1230 UL 34 1 1046 000...

Страница 20: ...ts Diagrams CBS 1232 6 Part Number1102 00471 00 ELECTRICAL COMPONENT LATTICE Drawing 1101 00571 00 Parts CBS 1232 2 1 2 legs Extends to 3 5 8 Part number 1073 00016 00 3 required for CBS 1232 4 requir...

Страница 21: ...023 00355 00 LOCATOR AIRPOT ADAPTER CBS 2230 29 1 1001 00408 00 COVER TOP CBS 2232 42 30 1 1001 00409 00 COVER UPPER BASE CBS 2232 42 31 11 1082 00017 00 SCREW TRUSS HD PHIL MACHINE 6 32 X 1 2 LG 32 1...

Страница 22: ...UNDERSIZED ZINC PLATED 9 1 1107 00021 00 HEATER ASSEMBLY IMMERSION 1500W 120VAC 9 1 1107 00022 00 HEATER ASSEMBLY IMMERSION 1700W 120VAC 9 1 1107 00020 00 HEATER ASSEMBLY IMMERSION 2300W 240VAC 9 1 11...

Страница 23: ...OTH LOCKWASHER 8 10 1084 00010 00 NUT HEX 6 32 UNDERSIZED ZINC PLATED 9 2 1107 00022 00 HEATER ASSEMBLY IMMERSION 1700W 120VAC 9 2 1107 00019 00 HEATER ASSEMBLY IMMERSION 2300W 120VAC 10 2 1003 00140...

Страница 24: ...FITTING STRAIGHT GROMMET 400 10 1 1023 00166 00 FITTING COLD WATER INLET GROMMET DESIGN 11 2 1107 00019 00 HEATER ASSEMBLY IMMERSION 2300W 120VAC 11 2 1107 00020 00 HEATER ASSEMBLY IMMERSION 2300W 240...

Страница 25: ...02 00113 00 SWITCH REED ASSEMBLY 5 1 1102 00479 00 ASSEMBLY CASCADE SPRAY DOME NEXT GEN ORANGE 6 2 1057 00076 00 VALVE ASSEMBLY COMPLETE NG DELTROL interchangeable with 1057 00078 00 6 2 1057 00078 00...

Страница 26: ...BB HANDLE 1023 00191 00 GREEN PLUG BB HANDLE 1023 00192 00 ORANGE PLUG BB HANDLE 1023 00180 00 BLUE PLUG BB HANDLE Stainless Steel Brew Basket Ref Qty Part Number Description B003218B1 Complete Stain...

Страница 27: ...Go to fetco com for the latest versions of all information Page 27 User Guide Operator instructions P211e0November 2021 Wiring Diagrams SSR SSR SKU E1231US 1X117 PM001 CBS 1231 Domestic Dual Voltage...

Страница 28: ...com for the latest versions of all information Page 28 User Guide Operator instructions P211e0November 2021 S S R Wiring diagram 1401 00190 10 E1231US 1A115 E1231US 1A123 E1231US 1X117 E1231IN 1B130 C...

Страница 29: ...com for the latest versions of all information Page 29 User Guide Operator instructions P211e0November 2021 SSR Wiring diagram 1401 00196 10 E1232US 1B223 E1232US 1B230 E1232IN 1B223 E1232IN 1B230 CB...

Страница 30: ...End of section notes N...

Отзывы: