background image

2.      Commissioning  CPV−DI02  (PROFIBUS−DP)

2−10

Festo    P.BE−CPV−DI02−EN    en  0704NH

2.3

C

o

n

f

i

g

u

r

a

ti

o

n

  w

it

a

  S

ie

m

en

s

 

mas

te

r

No

te

Various  configuration  programs  are  available  for  use  in
conjunction  with  a  Siemens  master.  Please  observe  the
relevant  procedure  for  your  configuration  program.

The  following  sections  describe  as  an  example  the  main  con
figuration  steps  with  the  STEP7  software.  It  is  assumed  that
the  reader  is  already  familiar  with  the  information  in  the  man
ual  for  the  STEP7  software.
Information  on  operation  with  general  DP  masters  can  be
found  in  appendix  A.2.

2.3.1

STEP  7    HW  Config  (up  to  V  5.2)    preparations

GSD

1. Copy  the  GSD  of  the  valve  terminal  into  the  directory

...\STEP7\S7DATA\GSD  on  your  PC/programmer.
File:  CPV_0A35.GS*
(Reference  sources  for  the  GSD  see  section  2.2)

The  GSDs  can  either  be:

copied  manually  into  the  above  mentioned  directory
(e.g.  with  Windows  Explorer)  or

loaded  via  the  menu  [Options]  [Install  new  GSD].

No

te

Update  the  hardware  catalogue  if  you  copy  the  GSD  during
work  with  STEP7.
Menu  in  HW  Config:  [Options]  [Update  catalogue]

Содержание PROFIBUD-DP

Страница 1: ...Elektronics manual CPV valve terminal with field bus direct connection Types CPV DI02 PROFIBUS DP CPV CS02 ABB CS31 Compact performance Manual 548 732 en 0704NH 706 006...

Страница 2: ......

Страница 3: ...ic of Germany 2007 Internet http www festo com E Mail service_international festo com The reproduction distribution and utilisation of this document as well as the communication of its contents to oth...

Страница 4: ...US PROFIBUS DP are registered trade marks of PROFIBUS International SIMATIC is a registered trade name of Siemens AG SPEEDCON is a registered trade name of PHOENIX CONTACT GmbH Co KG 32825 Blomberg Ge...

Страница 5: ...the SAVE button 1 10 1 2 5 Help table for setting the station number 1 10 1 3 Connecting the field bus 1 15 1 3 1 Field bus cable 1 15 1 3 2 Field bus baud rate and field bus length for PROFIBUS DP CP...

Страница 6: ...1 STEP 7 HW Config up to V 5 2 preparations 2 10 2 3 2 Station selection with STEP 7 2 12 2 3 3 Configuration with STEP 7 2 14 2 3 4 Tool change configuration 2 16 2 4 Examples of configuration 2 18...

Страница 7: ...Switching on the operating voltages 4 3 4 1 2 Address assignment of the CPV Direct 4 4 4 1 3 General data 4 6 4 2 Configuration 4 7 4 2 1 CS31 CPU as bus master 4 7 5 Diagnosis CPV CS02 ABB CS31 5 1 5...

Страница 8: ...specifications for the CPV CS02 A 5 A 2 PROFIBUS DP Commissioning with the general DP master A 6 A 2 1 Bus start A 6 A 2 2 Send parametriziung data A 7 A 2 3 Check the configuration data A 9 A 2 4 Tr...

Страница 9: ...condition The maximum values specified for pressures temperatures electrical data torques etc must be observed If additional commercially available components such as sen sors and actuators are conne...

Страница 10: ...10 and CPV14 CPV CS02 software as from 31 07 06 hardware as from 0107 for sizes CPV10 and CPV14 This manual contains specific information on installing com missioning programming and diagnosing CPV va...

Страница 11: ...between the following danger warnings Warning This means that failure to observe this instruction may result in serious personal injury or damage to property Caution This means that failure to observ...

Страница 12: ...ns tips and references to other sources of information Accessories Information on necessary or sensible accessories for the Festo product Environment Information on environment friendly use of Festo p...

Страница 13: ...s The system consists of CP modules withoutextended functions CP valve terminal CPV valve terminal type 10 or CPA valve terminal type 12 each with CP connection also regarded as CP modules Basic elect...

Страница 14: ...g CPX I O modules CPI input modules and CPI output modules I Os Digital inputs and outputs O Digital output Octet Number of address words assigned by the CP system Output module Output module PLC IPC...

Страница 15: ...Installation CPV DI02 and CPV CS02 1 1 Festo P BE CPV DI02 EN en 0704NH Chapter 1...

Страница 16: ...cable 1 15 1 3 2 Field bus baud rate and field bus length for PROFIBUS DP CPV DI02 1 17 1 3 3 Field bus interface 1 18 1 3 4 Connectionpossibilities 1 20 1 4 Bus termination with termination resistor...

Страница 17: ...voltage supply for the valves You can thereby avoid uncontrolled movements of loose tubing uncontrolled movements of the connected actuators non defined switching states of the electronic components...

Страница 18: ...pin Sub D socket see section 1 3 3 2 Underneath the removable switch cover DIL switches and the SAVE button see section 1 2 1 3 Operating load voltage connection 4 pin M12 plug see section 1 5 4 Powe...

Страница 19: ...PV DI02 EN en 0704NH 1 2 1 Overview for setting the CPV Direct PS PL BF Fig 1 2 Removing fitting the switch cover 3 2 1 1 DIL switch for station number and diagnostic mode 2 SAVE button 3 Cover Fig 1...

Страница 20: ...number and the diagnostic mode on the DIL switch see section 1 2 2 4 If you have connected CPI CP modules to the CPI exten sion connection read the procedure for configuring the CPI CP modules in sec...

Страница 21: ...ntered coded with the 8 position DIL switch 1 CPV DI02 PROFIBUS address switch elements 1 7 2 CPV CS02 CS31 module address switch elements 1 6 1 2 Fig 1 4 Setting the station number on the CPV DI01 or...

Страница 22: ...25 2 4 32 38 Tab 1 1 Examples of set station numbers binary coded The following station numbers are permitted Valve terminal type Protocol Address designation Permitted station numbers CPV DI02 PROFIB...

Страница 23: ...CPV DI02 Device related diagnosis CPV CS02 Load voltage monitoring 1 DIL 8 OFF diagnosis deactivated 2 DIL 8 ON diagnosis activated 2 1 Fig 1 5 Setting the diagnostic mode For PROFIBUS DP If the devic...

Страница 24: ...extension connection will be recognized automatically 1 Prepare the connection of the CPV Direct to the power supply see section 1 5 2 Read the sections 1 6 Extending the CPV Direct and 1 7 Preparing...

Страница 25: ...FF ON OFF OFF 6 OFF ON ON OFF OFF OFF OFF 22 OFF ON ON OFF ON OFF OFF 7 ON ON ON OFF OFF OFF OFF 23 ON ON ON OFF ON OFF OFF 8 OFF OFF OFF ON OFF OFF OFF 24 OFF OFF OFF ON ON OFF OFF 9 ON OFF OFF ON OF...

Страница 26: ...53 ON OFF ON OFF ON ON OFF 38 OFF ON ON OFF OFF ON OFF 54 OFF ON ON OFF ON ON OFF 39 ON ON ON OFF OFF ON OFF 55 ON ON ON OFF ON ON OFF 40 OFF OFF OFF ON OFF ON OFF 56 OFF OFF OFF ON ON ON OFF 41 ON O...

Страница 27: ...85 ON OFF ON OFF ON OFF ON 70 OFF ON ON OFF OFF OFF ON 86 OFF ON ON OFF ON OFF ON 71 ON ON ON OFF OFF OFF ON 87 ON ON ON OFF ON OFF ON 72 OFF OFF OFF ON OFF OFF ON 88 OFF OFF OFF ON ON OFF ON 73 ON O...

Страница 28: ...OFF ON OFF OFF ON ON 116 OFF OFF ON OFF ON ON ON 102 OFF ON ON OFF OFF ON ON 117 ON OFF ON OFF ON ON ON 103 ON ON ON OFF OFF ON ON 118 OFF ON ON OFF ON ON ON 104 OFF OFF OFF ON OFF ON ON 119 ON ON ON...

Страница 29: ...ions Causes of the transmission faults can be missing or incorrect terminating resistor incorrect screening shield connection branches transmission over long distances unsuitable cables Observe the ca...

Страница 30: ...135 165 3 20 MHz capacitance per unit length 30 nF km loop resistance 110 km core diameter 0 64 mm core cross sectional area 0 34 mm2 Bus length Exact specifications on the bus length can be found in...

Страница 31: ...the maximum permitted segment length cable length without repeater if you connect the CPX terminal to a field bus segment Avoid branch lines The CPV DI02 sets itself automatically to one of the follow...

Страница 32: ...the two flat screws by bolts part no 340 960 CPV DI02 PROFIBUS DP Pin Field bus plug IP65 from Festo 1 PROFIBUS DP Designation 1 2 3 4 5 6 7 8 9 Housing B A Clamp strap n c n c RxD TxD P CNTR P 2 DGN...

Страница 33: ...V CS02 ABB CS31 Pin Field bus plug IP65 from Festo 1 ABB CS31 1 2 3 4 5 6 7 8 9 Housing B A Clamp strap Bus 1 Bus 2 Screening shield view of socket of the CPV Direct 1 Type FBS SUB 9 GS DP B part no 5...

Страница 34: ...ect to the field bus easily with the field bus plug from Festo type FBS SUB 9 GS DP B part no 532216 You can disconnect the plug from the CPV Direct without interrupting the bus cable T TAP function 1...

Страница 35: ...e field bus cable DIL switches With the switch in the field bus plug you can switch the following switch setting OFF the bus termination is switched off and the continuing field bus cable is switched...

Страница 36: ...irect without interrupting the bus cable T TAP function Connection to the field bus is made with a 5 pin M12 plug with PG9 screw connector Use the second connection socket for the continuation of the...

Страница 37: ...fibre waveguides Use optical fibre waveguides when transmission is affected by heavy interference as well as for extending the trans mission range when high baud rates are used Example of optical fib...

Страница 38: ...of a bus segment Recommendation Use the ready to use field bus plugs from Festo for the bus termination A suitable resistor network is incorporated in the housing of this plug see Fig 1 7 Receive sen...

Страница 39: ...t and the CPV valve terminal Long cables reduce the voltage supplied by the power unit If necessary calculate the suitable cross sectional area and the maximum permitted cable length The power supply...

Страница 40: ...connect them as follows Fig 1 8 1 Open the socket Loosen the centre knurled nut 2 Open the strain relief on the rear of the housing Pass the cable through 3 Remove 5 mm of the insulation from the end...

Страница 41: ...ical isolation of the operating voltage as per IEC DIN EN 60204 1 By the use of PELV power units protection against electric shock protection against direct and indirect contact is guaranteed in accor...

Страница 42: ...max 100 mA CPV valve terminal max 40 mA CPA valve terminal 20 mA CP input module max 40 mA Sensors see manufacturer specifications CP output module max 40 mA Carry forward ______ mA Current consumpti...

Страница 43: ...ed or switched off Power is supplied via a 4 pin M12 plug see Fig 1 1 Current consumption depends on the type of valve terminal Please refer to the Pneumatics manual P BE CPV and the previous section...

Страница 44: ...dules in the secondary circuit of the power unit Switching off the compressed air supply for the valve terminal Due to energy stored in the input circuitry of valve ter minals there may be a delayed r...

Страница 45: ...for the electronics and inputs with modules connected to the extension connection max 2 A 2 24 V DC load voltage for the valves max 2 A 3 0 V 4 Earth ground connection Fig 1 9 Pin assignment of the p...

Страница 46: ...ow impedance connections make sure that the housing of the valve terminal and the earth con nection at pin 4 have the same potential and that there are no equalizing currents In this way you will avoi...

Страница 47: ...14 12 14 12 14 12 14 12 14 12 14 1 1 CPI extension connection Fig 1 11 CPI extension connection The rules for CPI systems also apply for extending the CPV Direct see section 1 6 1 You can connect the...

Страница 48: ...necting cables must have special electrical properties Therefore always use Festo CP connecting cables An overview can be found in appendix A Ready to use CP connecting cables are available from Festo...

Страница 49: ...A mixture of CPI CP modules is possible on CPI masters Only one CP input module is possible at the end of a string Only one CP valveterminal 2 or one CP output module 2 is possible per CP string Unus...

Страница 50: ...CPI master X X X X I X VI O X Any CPI module or CP valve terminal with CPI ability max 2 valve terminals possible I CP input module VI O CP valve terminal or CP output module grey CPI modules valve te...

Страница 51: ...which may occur in various field bus systems when address ranges are modi fied during operation 1 7 1 Checking the CP strings Preparations Before commissioning a CPV Direct with CPI extensions you sh...

Страница 52: ...ssignment The CPV Direct saves the type and the sequence of the con nected CPI modules for the CP string string assignment The saved string assignment enables the CPV Direct to avoid faults in connect...

Страница 53: ...n the power supply for the CPV Direct and if necessary for the CPI CP modules with load voltage connection The fault LED P on the CPV Direct will flash if CPI CP modules are connected or if the string...

Страница 54: ...dy to operate status The PS PL LEDs of the CPV Direct as well as the status LEDs on the connected CPI CP modules light up If the current assignment is not the same as the saved assign ment the fault L...

Страница 55: ...string Register module types Save button pressed No Stringassignment save Fault LED P out Switch power supply on off Module types Set Actual Yes CP string Register module types No No CP configuration...

Страница 56: ...ure etc this will be displayed on the CPV Direct by the diagnostic LED of the string extension P The status LED on the relevant module goes out All modules working without faults remain ready to opera...

Страница 57: ...nd valve terminals on the CP string concerned switch off the following sources of energy the compressed air supply to the valve terminal the operating voltage supply for the CPI CP output module 3 Dis...

Страница 58: ...1 Installation CPV DI02 and CPV CS02 1 44 Festo P BE CPV DI02 EN en 0704NH...

Страница 59: ...Commissioning CPV DI02 PROFIBUS DP 2 1 Festo P BE CPV DI02 EN en 0704NH Chapter 2...

Страница 60: ...t 2 4 2 1 3 Address assignment of CPI CP modules 2 6 2 1 4 Information on commissioning 2 7 2 2 Device master file GSD and icon files 2 9 2 3 Configuration with a Siemens master 2 10 2 3 1 STEP 7 HW C...

Страница 61: ...s configuration are com plete and correct the power supplies for the programmable logic controller and for the field bus slaves are switched on either simul taneously or in the sequence indicated belo...

Страница 62: ...shows the addressing sequence of the individual CPV valve plates 0 1 2 3 4 5 8 9 10 11 12 13 6 7 14 15 Fig 2 1 Address assignment of the CPV Direct A valve location on the CPV Direct always occupies 2...

Страница 63: ...he front to the rear on the individual valve loca tions OB Output byte OB x OB x 1 O20 0 O20 1 O20 3 O20 2 O20 5 O20 4 O20 6 O20 7 O21 1 O21 0 O21 3 O21 2 O21 5 O21 4 O21 7 O21 6 0 1 2 3 4 5 6 7 0 1 2...

Страница 64: ...Z CP E16 M12x2 5POL CP E16N M12x2 CP E16 KL IP20 Z Yes Yes Yes No No No No No No 8 I 8 I 16 I 16 I 16 I 16 I 16 I 16 I 16 I 16 I 16 I 16 I 16 I 16 I 16 I 16 I 16 I 16 I CPI CP output modules CP A04 M...

Страница 65: ...module stops Only the operating mode FREEZE will be reset automati cally when the bus connection to the CP system is interrupted response monitoring active FREEZE command All the outputs of the CPI sy...

Страница 66: ...n 16 digital inputs ID 16DI ID 11h 17d modules Extension 24 digital inputs ID 24DI ID 12h 18d Extension 32 digital inputs ID 32DI ID 13h 19d Extension 8 digital outputs ID 8DO ID 20h 32d e g CPI CP ou...

Страница 67: ...Reference sources Current GSD files can be found on the Festo Internet pages under www festo com fieldbus GSD files You will require one of the following files for the CPV Direct CPV_0A35 GSD german V...

Страница 68: ...miliar with the information in the man ual for the STEP 7 software Information on operation with general DP masters can be found in appendix A 2 2 3 1 STEP 7 HW Config up to V 5 2 preparations GSD 1 C...

Страница 69: ...ess the dialogue window Properties PROFIBUS Baud rate Profile Icons 3 Copy the icon files see section 2 2 for the CPV Direct into directory STEP7 S7DATA NSBMP on your PC or programmer The icon files c...

Страница 70: ...2 Station selection with STEP 7 1 2 3 4 Fig 2 3 Station selection with STEP 7 HW Config the windows displayed are not all visible at the same time see text 1 If the hardware catalogue is not open clic...

Страница 71: ...ion type Festo CPV DI02 onto the line of the DP master system 2 The dialogue window Properties PROFIBUS interface will be displayed 3 3 Select the PROFIBUS address identical to the selected setting on...

Страница 72: ...STEP 7 HW Config example for adding one CP input module with 16 inputs explanations see text 1 Click on the icon of the valve terminal to be configured in the HW Config 1 The configuration table will...

Страница 73: ...f your CPV Direct Assign the starting address in the window Properties DP slave 5 Note Pull the modules into the configuration table according to the physical sequence of the extensions of your CPI sy...

Страница 74: ...e configuration With the tool change configuration you can commission mod ules without new configuration on the CP extension connection The tool change configuration is useful if various extensions ar...

Страница 75: ...ven if the addresses are used incorrectly Incorrect addressing can cause functional damage with the tool change configuration With the tool change configuration make sure that the input and output sig...

Страница 76: ...a CPV DI02 No Standard configuration DP identifiers Addressing 1 16DO 1 O20 0 O21 7 CPV DI02 CP E08 M12 CL 8DI I20 0 I20 7 2 16DO 1 O20 0 O21 7 8DO O22 0 O22 7 CPV DI02 CP A04 M12 CL CP E08 M12 CL 8DI...

Страница 77: ...ge configuration DP identifiers Assigned addresses 16DO 1 O20 0 O21 7 I20 0 I20 7 1 32DX I20 0 I23 7 I20 0 I20 7 1 O22 0 O25 7 O22 0 O22 3 I20 0 I20 7 2 O22 0 O22 3 I20 0 I20 7 O20 0 O21 7 3 I20 0 I20...

Страница 78: ...the 2nd output module In both cases address O23 7 is used Take into account in the controller that the lamp now lies at address O25 7 and an actuator at O23 7 Tool change configuration DP identifiers...

Страница 79: ...Diagnosis CPV DI02 PROFIBUS DP 3 1 Festo P BE CPV DI02 EN en 0704NH Chapter 3...

Страница 80: ...1 Diagnostic words 3 9 3 2 2 Diagnosis steps 3 10 3 2 3 Overview of the diagnostic bytes 3 12 3 2 4 Details for standard diagnostic information 3 13 3 2 5 Diagnosis with tool change configuration 3 19...

Страница 81: ...Operating voltage supply for the electronics and sensors LED PL Power Load Load voltage supply for valves and valves outputs in the CP extension string 2 LED BF Bus fault status LED P Other fault mess...

Страница 82: ...ormal operating status 3 1 2 Fault diagnosis with the LEDs Fault diagnosis with the LED PS The green LED PS Power System indicates faults in the operating voltage supply LED Colour Operating status Fa...

Страница 83: ...Load voltage of CP valves of the CPV Direct 20 4 V PL green flashes slowly Load voltage of the CP valves outputs in the CPI extension string 20 4 V Check load voltage supply of the CPI extension stri...

Страница 84: ...lowly 1 second intervals Field bus connection not OK Possible causes Station number not correct e g address assigned twice Field bus module switched off or defective Interrupted short circuited or fau...

Страница 85: ...ion not permitted Check the CP configuration and if necessary carry out new recognition see section 1 2 4 Alternative Use the tool change configuration P red flashes slowly 1 second intervals Peripher...

Страница 86: ...ition Valve solenoid coil Meaning off Normal setting Logical 0 no signal yellow lights up Switch position or Normal setting Logical 1 signal present Logical 1 but the load voltage of the valves lies b...

Страница 87: ...nosis listed in EN 50170 is not supported 3 2 1 Diagnostic words The following fault states of the CPI system are grouped into diagnostic words and passed on to the DP master failure of the load volta...

Страница 88: ...diagnostic step are represented Note The diagnostic information is only sent to the master if the device related diagnosis is activated DIL switch element 8 at ON see section 1 2 3 1 2 3 0 4 5 6 7 1 B...

Страница 89: ...status 1 Device related diagnosis 1 see Tab 3 12 Bit There is a device related diagnosis 1 Fault CP string CP valve terminal 1 2 3 0 4 5 6 7 There is at least one fault see Tab 3 13 and Tab 3 14 1 Dev...

Страница 90: ...iagnostic address 1 Octet Byte 0 1 Station status 1 Station status 2 2 1 2 3 Station status 3 Master address Diag Master_Add 4 3 4 5 Manufacturer s code Ident_number High byte 0Ah Manufacturer s code...

Страница 91: ...not applied Data cable interrupted Fault in data cable 1 Diag Station_Not_Ready CPI system not yet ready for data exchange 2 Diag Cfg_Fault The configuration data received from the master do not agree...

Страница 92: ...s set to 0 2 always 1 set by CPI system 3 Diag WD_On 1 Response monitoring watchdog activated 4 Diag Freeze_Mode 1 FREEZE activated 5 Diag Sync_Mode 1 SYNC activated 6 reserved 7 Diag Deactivated alwa...

Страница 93: ...ess The address of the master which parametrized the CPI system is entered in this octet 5 6 Ident_number Manufacturer identification These octets contain the manufacturer identification 0A35h for the...

Страница 94: ...4 Is sent to the master PLC only if the device related diagnosis is activated with the DIL switch Tab 3 12 Diagnostic bits of device related diagnosis 1 Octet 9 Device related diagnosis 2 Bit Meaning...

Страница 95: ...module in the CP string signals diagnosis 4 Diagnosis in the CP string 1 4th module in the CP string signals diagnosis 5 7 reserved Tab 3 14 Diagnostic bits of device related diagnosis 3 Octets 11 16...

Страница 96: ...g operation e g CPI module failed or CPI cable defective More than one module failed during operation modules are no longer recognized Check CP strings CPI modules and CPI cables if necessary replace...

Страница 97: ...ation the diagnostic information for all modules in the CP string is entered in the 2nd diag nostic byte No information is given as to which module registers the fault Note the module LEDs in the CP s...

Страница 98: ...ic outputs will be switched off or retain their status Warning Make sure that valves and outputs are put into a safe state if the faults named occur An incorrect status of the valves and outputs can l...

Страница 99: ...of fault reactions of the control system Hard fault reaction the controller switches to the operat ing mode STOP when a fault occurs Soft fault reaction the controller remains in the operating mode R...

Страница 100: ...FB 230 S_DIAG ET 200 Decentral Periphery System manual Siemens SIMATIC S7 M7 SFC 13 DP NRM_DG System and Standard Functions reference manual Siemens Tab 3 19 Possibilities for downloading the diagnosi...

Страница 101: ...l has incorrect DIL setting 3 4 1 Read out diagnostic buffer with STEP 7 up to V 5 2 The diagnostic buffer of STEP 7 offers the possibility of dis playing diagnostic events of the S7 system in the seq...

Страница 102: ...3 Diagnosis CPV DI02 PROFIBUS DP 3 24 Festo P BE CPV DI02 EN en 0704NH 1 2 3 4 5 Fig 3 5 Online diagnosis via the diagnostic buffer explanation see text...

Страница 103: ...the device related diag nosis via the window Module information see Fig 3 6 1 Click with the right hand mouse key on the icon of the valve terminal 1 2 Click on Module information in the context menu...

Страница 104: ...1 Output module If there is a short circuit or overload all the digital outputs of an output module will be switched off if it exists the diagnostic LED on the output module will light up otherwise t...

Страница 105: ...utomatically in the program logical 0 RESET Briefly interrupt the CP connection at the CP output module or Outputs on the output module will be reset automatically CP output module or Interrupt briefl...

Страница 106: ...vice related diagnosis 2 will be set to 1 Note The inputs cannot be used again until the short circuit or overload has been eliminated and the fault quitted Deleting faults You can quit the fault in o...

Страница 107: ...Commissioning CPV CS02 ABB CS31 4 1 Festo P BE CPV DI02 EN en 0704NH Chapter 4...

Страница 108: ...Contents 4 Commissioning CPV CS02 ABB CS31 4 1 4 1 Preparing the CPV Direct for commissioning 4 3 4 1 1 Switching on the operating voltages 4 3 4 1 2 Address assignment of the CPV Direct 4 4 4 1 3 Ge...

Страница 109: ...ld bus configuration are complete and correct the power supplies for the programmable logic controller and for the field bus slaves are switched on either simul taneously or in the sequence indicated...

Страница 110: ...diagram shows the addressing sequence of the individual CPV valve plates 0 1 2 3 4 5 8 9 10 11 12 13 6 7 14 15 Fig 4 1 Address assignment of the CPV Direct A valve location on the CPV Direct always o...

Страница 111: ...PV Direct and from the front to the rear on the individual valve locations 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 0 1 2 3 4 5 6 7 0 1 2 3 4 5 6 7 On 00 On 01 On 03 On 02 On 05 On 04 On 06 On...

Страница 112: ...wing applies to the CPI CP system 16 inputs or 16 outputs each occupy one CS31 bus address A 16 group which has been started also occupies a full CS31 bus address Note Select the range n 0 60 for the...

Страница 113: ...CS31 CPU as bus master The CPV Direct offers the following on the ABB CS31 max 48 outputs valves or digital outputs and max 32 inputs The following applies for the assignment of bus addresses Module...

Страница 114: ...rminal or CPI output module 40O O n 00 O n 15 O n 1 00 O n 1 15 O n 2 00 O n 2 15 CPV Direct CP extension modules CP valve terminal or CPI output module 48O O n 00 O n 15 O n 1 00 O n 1 15 O n 2 00 O...

Страница 115: ...n the CPV Direct The CPV Direct has been extended with one CP CL output module and one CP CL input module and occupies two CS31 bus addresses station numbers 1 CPV Direct 2 Output module CP A04 M12 CL...

Страница 116: ...4 Commissioning CPV CS02 ABB CS31 4 10 Festo P BE CPV DI02 EN en 0704NH...

Страница 117: ...Diagnosis CPV CS02 ABB CS31 5 1 Festo P BE CPV DI02 EN en 0704NH Chapter 5...

Страница 118: ...3 5 1 2 Fault diagnosis with the LEDs 5 4 5 1 3 LEDs for status display of the valve solenoid coils 5 8 5 2 Diagnosis via the field bus 5 9 5 3 Setting the diagnostic mode 5 11 5 4 Fault treatment 5 1...

Страница 119: ...LED PS Power System Operating voltage supply for the electronics and sensors LED PL Power Load Load voltage supply for valves and valves outputs in the CP extension string 2 LED BF Bus fault status L...

Страница 120: ...rmal operating status 5 1 2 Fault diagnosis with the LEDs Fault diagnosis with the LED PS The green LED PS Power System indicates faults in the operating voltage supply LED Colour Operating status Fau...

Страница 121: ...eck load voltage supply pin 2 PL green flashes fast Load voltage of CP valves of the CPV Direct 20 4 V PL green flashes slowly Load voltage of the CP valves outputs in the CPI extension string 20 4 V...

Страница 122: ...flashes slowly 1 second intervals Field bus connection not OK Possible causes Station number not correct e g address assigned twice Field bus module switched off or defective Interrupted short circui...

Страница 123: ...Check the CP configuration and if necessary carry out new recognition see section 1 2 4 Alternative Use the tool change configuration Correct address setting 1 60 P red flashes slowly 1 second interv...

Страница 124: ...n valve solenoid coil Fault treatment off Normal setting Logical 0 no signal yellow lights up Switch position or Normal setting Logical 1 signal present Logical 1 but operating voltage of the valves l...

Страница 125: ...general monitoring of the CS31 system bus e g total failure of local modules The CPUs and couplers scan the diagnostic messages provided by the CPV Direct The appropriate ABB manuals are valid for all...

Страница 126: ...t without extension or extended by one CP valve terminal CP output module 4D Binary inputs outputs CPV Direct extended by one input module 3 Group no set station number decimal 4 1D Internal module fa...

Страница 127: ...ls CPI output modules in the CP extension string Failure of the additional supply for the CPI input modules in the CP extension string The following table shows the reaction of the diagnostic LEDs or...

Страница 128: ...any electric outputs will be switched off after 250 ms in the event of faults Note Please note the following if the outputs are reset after PLC stop field bus interruption or fault Single solenoid va...

Страница 129: ...ult deleted Deleting faults You can quit the fault by resetting all 8 outputs You can do this in one of the following ways Options Explanation Set all the outputs of the output module to logical 0 RES...

Страница 130: ...ise the green LED will flash the fault bit in the diagnostic byte will be set to logical 1 Note The inputs cannot be used again until the short circuit or overload has been eliminated and the fault qu...

Страница 131: ...Technical appendix A 1 Festo P BE CPV DI02 EN en 0704NH Appendix A...

Страница 132: ...ical specifications for the CPV CS02 A 5 A 2 PROFIBUS DP Commissioning with the general DP master A 6 A 2 1 Bus start A 6 A 2 2 Send parametriziung data A 7 A 2 3 Check the configuration data A 9 A 2...

Страница 133: ...k protection against direct and indirect contact as per IEC DIN EN 60204 1 by means of a PELV circuit Protected Extra Low Voltage Electromagneticcompatibility EMC interference emission EMC resistance...

Страница 134: ...ripple 4 Vpp within tolerance Electrical isolation bus interface opto decoupled Load voltage for solenoid CPV valves Pin 2 Power supply connection nominalvalue tolerance 24 V DC reverse polarity prote...

Страница 135: ...loating Type of transmission serial asynchronous half duplex Baud rate 9 6 12000 kBaud automatic baud rate recognition Cable type depending on cable length and baud rate see controller manual A 1 3 Te...

Страница 136: ...ppropriate sections Module consistency FREEZE and SYNC identifiers section 2 1 4 GSD section 2 2 A 2 1 Bus start In order to commission the CPI system correctly the DP master must carry out the follow...

Страница 137: ...sponse monitoring of the CPI system ON OFF 0 OFF 1 ON 4 Freeze_Req 0 FREEZE mode not requested by the master 1 FREEZE mode set by the master 5 Sync_Req 0 SYNC mode not requested by the master 1 SYNC m...

Страница 138: ...Station Delay Responder min TSDR The minimum time the CPI system must wait before the reply telegram may be sent to the DP master 5 and 6 Ident_number Transmission of the manufacturer identifier of th...

Страница 139: ...tal outputs valve coils of the CPV SC Extension 8 digital inputs Octet 16 Octet 1 10h e g CPI CP input modules Extension 16 digital inputs Octet 17 Octet 11h modules Extension 24 digital inputs Octet...

Страница 140: ...nction Data_Exchange the CPI system expects the output data for the valves and electric outputs The input data are sent to the master as a reply telegram A 2 5 Read diagnostic information Slave_Diag T...

Страница 141: ...service access points SAP Function Available Destination SAP DSAP Data_Exchange Yes NIL RD_Inp Yes 56 RD_Outp Yes 57 Slave_Diag Yes 60 Set_Prm Yes 61 Chk_Cfg Yes 62 Get_Cfg Yes 59 Global_Control Yes...

Страница 142: ...A 5 Bus parameters and reaction times A 2 8 Transmission times on the PROFIBUS DP Note Observe here the cycle time of your PLC and the update time of the PROFIBUS DP The time delay within the CP syste...

Страница 143: ...se are available from Festo Plug Type Part no PG7 straight FB SD GD7 18 497 PG9 straight FB SD GD9 18 495 PG7 angled FB SD WD7 18 524 PG9 angled FB SD WD9 18 525 Bus connection IP65 field bus plug fro...

Страница 144: ...3 WS WD 8 540 331 angled plug angled socket 2 m suitable as drag chain KVI CP 3 WS WD 2 540 332 angled plug angled socket 5 m suitable as drag chain KVI CP 3 WS WD 5 540 333 angled plug angled socket...

Страница 145: ...in SEA 5GS 11 DUO 192 010 Sensor plug straight M8 3 pin can be soldered SEA GS M8 18 696 Sensor plug straight M8 3 pin can be screwed SEA 3GS M8 S 192 009 Connector set for CP E16 KL IP20 Z SEA KL SAC...

Страница 146: ...A Technical appendix A 16 Festo P BE CPV DI02 EN en 0704NH...

Страница 147: ...Index B 1 Festo P BE CPV DI02 EN en 0704NH Appendix B...

Страница 148: ...B Index B 2 Festo P BE CPV DI02 EN en 0704NH Contents B Index B 1...

Страница 149: ...Operating voltage switching on 4 3 Preparing for commissioning 4 3 Short circuit overload 5 13 Abbreviations product specific XI Accessories A 13 Address assignment CPI CP modules 2 6 B Baud rate 1 17...

Страница 150: ...placement 1 43 D Designated use VII Diagnostic mode 1 9 DIL switches 1 5 E Earth connection 1 32 Electrical connecting and display elements 1 4 EMERGENCY STOP circuit 1 30 Examples of configuration 2...

Страница 151: ...SF 3 7 5 7 M M12 adapter 1 22 N Notes on the use of this manual VIII O Operating voltage Switching on 4 3 Operating voltage cable 1 25 P Pictograms X Pin assignment Field bus interface 1 19 Power supp...

Страница 152: ...9 DP identifier 2 8 Fault treatment 3 20 Field bus interface Pin assignment 1 18 FREEZE 2 7 General DP master A 6 Icon files 2 9 Implemented functions A 11 LEDs 3 3 Module consistency 2 8 Most import...

Страница 153: ...ble 1 10 Permitted 1 8 Setting 1 7 1 10 Strain relief 1 15 String assignment Save 1 39 Switching onreaction CPI system 1 40 T Target group VII Technical specifications CPV DI02 and CPV SC02 A 3 Text m...

Страница 154: ...B Index C 8 Festo P BE CPV DI02 EN en 0704NH...

Отзывы: