EPCO-...-KF
Festo – EPCO-...-KF – 1704a English
11
EPCO-16-3P-KF
Horizontal installation
Positioning time t as a function of the travel distance l and effective load m
t = 0,30 s
t = 0,60 s
t = 0,90 s
t = 1,20 s
t = 1,55 s
t = 1,85 s
Acceleration a and speed v as a function of the effective load m and travel distance l
l = 0 mm
l = 200 mm
m = 0 kg
m = 24 kg
Fig. 9