Festo CPX-FB11 0206NH English
17
3
Installation instructions
3.1 Fitting
Field bus node CPX-FB11 is mounted in a manifold base of
the CPX terminal.
1
Screws,
tightening torque
0.9...1.1 Nm
2
Field bus node
CPX-FB11
3
Contact rails
4
Manifold base
3
1
2
4
Dismantling
S
Remove the screws and carefully lift up the field bus
node.
Fitting
1. Check the seal and sealing surfaces and refit the sub-
base.
2. Place the screws so that the self-cutting threads are
used. Tighten the screws by hand in diagonally oppo-
site sequence. Tightening torque 0.9...1.1 Nm.