4. Commissioning
4−10
Festo P.BE−CPX−CMA X−SYS−EN en 0908NH
Search for axis at
axis interface
Power on
Valve and displacement
encoder missing
Valve and displacement
encoder OK
Axis found
Axis not found
Target configuration not
present
Target configuration
present
Target configuration
present
Wait for
configuration
Controller
ready
Malfunction
PNU 1192:02 = 0
1
2
3
1
Initial start−up is complete, CMAX is
ready for operation
2
For malfunctions, see chapter 5
3
Status when switched on for first time
(delivery status or after data reset):
Wait for initial start−up. For display, see
Tab.4/1
Fig.4/1:
Switch−on behaviour
Display
Description
C00
Wait for the parameterisation of the system of
measurement units.
C01
Wait for drive type parameterisation.
C02
Wait for axis data parameterisation.
C03
Wait for movement test to be carried out.
Tab.4/1: Display during commissioning
An overview of status displays can be found in section 5.4.2.
Содержание CPX-CMAX-C1-1
Страница 2: ......
Страница 22: ...Contents and general safety instructions XX Festo P BE CPX CMAX SYS EN en 0908NH...
Страница 23: ...CMAX system overview 1 1 Festo P BE CPX CMAX SYS EN en 0908NH Chapter 1...
Страница 31: ...Fitting and pneumatic installation 2 1 Festo P BE CPX CMAX SYS EN en 0908NH Chapter 2...
Страница 60: ...2 Fitting and pneumatic installation 2 30 Festo P BE CPX CMAX SYS EN en 0908NH...
Страница 61: ...Electrical installation 3 1 Festo P BE CPX CMAX SYS EN en 0908NH Chapter 3...
Страница 79: ...Commissioning 4 1 Festo P BE CPX CMAX SYS EN en 0908NH Chapter 4...
Страница 122: ...4 Commissioning 4 44 Festo P BE CPX CMAX SYS EN en 0908NH...
Страница 123: ...Diagnostics and error handling 5 1 Festo P BE CPX CMAX SYS EN en 0908NH Chapter 5...
Страница 163: ...Technical appendix A 1 Festo P BE CPX CMAX SYS EN en 0908NH Appendix A...
Страница 176: ...A Technical appendix A 14 Festo P BE CPX CMAX SYS EN en 0908NH...