16
SYS 10-23
Sloped tile
1KWMA82U
Concentric
adapter 60/100
1KWMR52A
Max. 4m extension
60/100
1KWMA56U
950
50
max. 4 mt
Roof terminal
1KWMA83U
950
53
50
950
50
1000
125
10
Vertical outlet
For installation (top flue connection):
1. Define the position for the installation of
the appliance
2. Drill the wall for the passage of the air/flue
gas pipe according to the references
indicated in the figure, considering that
the horizontal sections of pipe must have
a downwards slope of around 3 mm per
metre of length, to prevent any rainwater
from entering the boiler.
3. Make a hole that is 10 - 20 mm greater
in diameter than the rated diameter of
the coaxial pipe used, to simplify its
installation.
4. If necessary, cut the end of the pipes to
measure, remembering that the outside
part of the pipes must protrude from the
wall by between 10 and 60 mm. Eliminate
any burrs from the cut.
5. Connect the pipes to the boiler, placing the
gaskets correctly, and seal the connections to
the wall using the special seal couplings.
fig. 11
The total length in linear metres of the
concentric pipes must not exceed the maximum
length indicated in the table below, considering
that each bend gives rise to the reduction
indicated. For example, a D= 60/100 pipe
with 1 x 90° bend + 1 metre hori 2
x 45° bends + 1 metre horizontal, has a total
equivalent length of 4 metres.
Maximum flue lenght permissible
100 mm concentric
125 mm concentric
Vertical
Horizontal*
m
4
m
3
m
5
Reduction for bend
100 mm concentric bend 90
°
1 m
100 mm concentric bend 45
°
0,5 m
125 mm concentric bend 90
°
0,5 m
125 mm concentric bend 45
°
0,25 m
* For horizontal Flueing the reduction for appliance
bend or turret are already included.
Содержание SYS 10-23
Страница 33: ...33 SYS 10 23 4 6 Internal electrical diagrams fig 30a...
Страница 34: ...34 SYS 10 23 fig 30b...
Страница 35: ......