Ferroli optima 601 Скачать руководство пользователя страница 18

  

601

18

External controls: room stat or remote time
clock in the place of loop  terminals 4 and 5.
Please note 24 V only, use only voltage free
contacts.
IMPORTANT

If 230 V is
connected to
terminals 4 or 5,
damage will be
caused to the
P.C.B.

Fixing screw front

Blue

Brown

Fig. 19

Fig. 18

Screw

IF IN DOUBT PHONE 021 313 1030

6.0

FITTING THE FLUE ASSEMBLY

6.1

With Sufficient Clearance To Insert Assembly From Inside

6.1.1 Insert the flue assembly into the wall.
6.1.2 Insert the flue bend in the top plate of the boiler
6.1.3 Secure the flue bend.
6.1.4 Fully insert the flue assembly into the boiler flue bend. Insert the self tapping screw supplied. Fully tighten.
6.1.5 Check the terminal relationship with the wall as shown in fig. 12.
6.1.6 Make good internal wall face.
6.1.7 Make good the outside wall face, re-weatherproof.
6.2

With insufficient Clearance To Insert Assembly From Inside

6.2.1 Insert the flue bend in the top plate of the boiler
6.2.2 Secure the flue bend.
6.2.3 From outside, push flue duct, then the air duct through the wall.
6.2.4 Fully  insert  the  flue  duct  into  the  flue bend,  then  the  air  duct.  Secure the air duct with the self tapping screw

provided.

6.2.5 Continue as detailed in 6.1.5 above.

7.0

ELECTRICAL INSTALLATION
Electrical  installation  must  be  carried  out  by a competent electrician. The appliance is to be connected to a
240 V ~ 50 Hz  supply  (see  fig.  18).  The  supply fuse rating is 3A. The terminals are accessible after removing
the white base plate and single screw securing the terminal cover (see fig. 18).

7.1

Procedure

7.1.1 The supply cable must be no less than 0.75 mm (24x0.2 mm) to BS6500 table 16.
7.1.2 The earth conductor must be cut longer than the live and neutral (fig. 19). Connect the Supply Cable to the terminal

block marked 240 V ~ 50 Hz, L, N, the supply cable is to be connected as follows:

i)

Connect the brown wire to the L (live) terminal).

ii)

The blue wire to the N (neutral) terminal.

iii)

The green/yellow wire to the (earth) terminal.

7.1.3 Secure the cable with the cable clamp. The  supply  cable  can be connected to the mains supply by the use of

an unswitched shuttered socket-outlet in conjunction with the 3A fused 3 pin plug both in accordance with BS
1363. This provides complete isolation. Alternatively,  a  fused  double  pole  switch having a contact separation
of at least 3 mm, in all poles and provided just for the boiler and its external controls can be used. A  wiring  diagram
is  provided  on  the  appliance,  attached  to  the rear of the front panel. In addition, there is one in this manual
(fig. 25). Attention  is  drawn  to  the  requirements of the current I.E.E. Regulation and in Scotland, the electrical
provisions of the Building regulations.

7.2

Room Thermostat (fig. 18) (or remote time clock connection)

7.2.1 Please note that the room thermostat, clock switch connection is 24 V. To connect mains voltage to these terminals

will seriously damage the printed circuit board. The  room  thermostat  and  clock  switch  connector block is situated
within the connector box. Twin core cable should be used for this connection (terminals 4 and 5).

7.2.2 If  using  a  remote  240  Volt  time  clock  ensure  that the motor and switch connections are totally separate in

the clock and that the switch connections are independent for the 24 Volt terminals (4 and 5) on the boiler.

Содержание optima 601

Страница 1: ...n Coldfield West Midlands B76 18DH Sales 0121 3523500 Fax 0121 3523510 ALL SPECIFICATIONS SUBJECT TO CHANGE Phone numbers Installer Service Engineer Serial No FERROLI HELPLINE FOR SERVICE INFORMATION...

Страница 2: ...on the Wall side flue 14 Drilling template 15 Preparing the Flue Assembly 16 Connecting the Boiler 18 Fitting the Flue Assembly 18 Electrical Installation 19 Commissioning Testing 19 Filling the Cent...

Страница 3: ...ral Heating pump The pump is switched ON OFF by the time clock and or a 24 Volt room thermostat The pump circuit also has a 6 minute over run time There is a Domestic Hot Water flow switch fitted and...

Страница 4: ...p Fast Electrical Input 150 W Central Heating Max Flow Temperature 85 C Temperature Rise Across Boiler 20 C Domestic Hot Water Flow 30 C Rise 11 1 litres min 32 C Rise 10 4 litres min 35 C Rise 9 5 li...

Страница 5: ...ld Water inlet 5 Central Heating Pressure relief valve 6 Central Heating Flow outlet 7 Central Heating Return inlet 8 Air intake for two pipe flue systems FRONT VIEW LEFT SIDE VIEW REAR VIEW 8 TOP VIE...

Страница 6: ...601 6 Boiler Flow Diagram Fig 2...

Страница 7: ...ater flow limiter 40 Domestic hot water expansion vessel optio nal 42 D H W temperature sensor 43 Air pressure switch 44 Combination gas valve 45 Knob gas valve 46 Operator gas valve 47 Modulating reg...

Страница 8: ...particular attention is drawn to the requirements of the current i e wiring regulations and in Scotland the electrical provisions of the building regulations applicable in Scotland with respect to the...

Страница 9: ...601 9 Terminal Position Minimum Clearance mm NOTES Access to the front of the boiler must be available for maintenance min 600 mm...

Страница 10: ...ny heat losses or possible freezing i e in roof spaces or ventilated underfloor spaces Drain taps should be positioned at the lowest point of the system in accessible locations to permit the whole sys...

Страница 11: ...far as possible from the boiler if thermostatic radiator valves are fitted throughout Key 1 Filling point C H 2 Temporary connection 3 Cold water supply Fig 6 Gas Cold water Additional expansion vess...

Страница 12: ...XPANSION VESSELS Deduct from the value given in the table the 7 litre vessel supplied Note 1 Fill C H installation to min 1 5 bar 2 Select by preference the expansion vessel for increased system press...

Страница 13: ...t the mounting jig assembly using the four fixing screws provided Ensure that all the service cocks are in the OFF position Operate valves several times to ensure they are free 2 6 With the exception...

Страница 14: ...15 mm 6 Central Heating flow outlet 22 mm 7 Central Heating return inlet 22 mm Important Note Always use two spanners to prevent twisting of soft copper pipework Note The central heating safety valve...

Страница 15: ...ne side to be used later Side Flue Outlet Fig 13 4 2 Side Flue Outlet fig 13 Important The aluminium flue pipe must protrude into the outside grill by 60 mm never cut it to the same length as the plas...

Страница 16: ...domestic hot water inlet and outlet using appropriate sealing washers Tighten the gas union 5 5 Screw the pressure relief valve adaptor provided through the jig bracket into the valve using the remai...

Страница 17: ...601 17 Fixing points Lift here Fig 15 Fixing screws Fig 16 Fig 17...

Страница 18: ...1 Procedure 7 1 1 The supply cable must be no less than 0 75 mm 24x0 2 mm to BS6500 table 16 7 1 2 Theearthconductormustbecutlongerthantheliveandneutral fig 19 ConnecttheSupplyCabletotheterminal bloc...

Страница 19: ...ighten cap on heat exchanger air vent Ensure the working pressure when filled is between 1 to 1 5 bar on the pressure gauge see technical data Check the system for leaks Flush system in accordance wit...

Страница 20: ...hrough the pilot viewing window keep the control knob fully depressed for a further 15 seconds then release Should the pilot fail to remain alight or goes out on any other occasion i e if electricity...

Страница 21: ...1 X3 6 5 3 4 1 F1 9 8 7 6 5 4 3 2 1 X8 1 2 3 4 5 6 7 8 9 X5 1 2 X7 JP4 13 L7 RY2 RY4 JP1 P2 P2 P1 MIN MAX MIN MAX Btu h x 1000 Note 1 Modulation is available on central heating so the procedures must...

Страница 22: ...F then check that the pressure is still at the required value 11 Adjust minimum pressure by rotating screw E anticlockwise until the required value is reached 12 Fit coil C by sliding it into the sle...

Страница 23: ...ting three minutes at least 9 0 SYSTEM OPERATION Let the boiler operate normally on central heating for about 30 minutes I Vent radiators II Vent heat exchanger III Examine all pipework for leakage IV...

Страница 24: ...01220 1 Cold water flow limiter 42 386818 800310 2 Temperature sensor 43 381691 800140 1 Air pressure switch 44 386544 803450 1 Combination gas valve 49 386815 801240 1 Overheat cut off thermostat 50...

Страница 25: ...Hot Water Performance Fig 1 D H W Pressure Drop VS flow A Standard with cold water Flow Restricter B Cold Water Flow Restricter Removed Fig 2 Fig 2 D H W temperature VS flow A Cold Water 15 C B Cold...

Страница 26: ...6 Microswitch combination gas valve 67 Ignition transformer 12 1 TR1 X4 X6 2 3 4 X2 RY1 X1 2AT 230V 50Hz 1 11 10 7 2 6 3 5 12 9 10 1 2 P1 X3 6 5 3 4 1 F1 9 8 7 6 5 4 3 2 1 X8 1 2 3 4 5 6 7 8 9 X5 1 2...

Страница 27: ...es off fuse blown 2 1 0 D H W flowmeter 136 not operating 3 X X Not required for D H W 4 1 0 D H W sensor 42 not connected or D H W temperature too high 5 0 1 Waiting time operating replace P C B 6 1...

Страница 28: ...let Special Air Intake Flue Outlet The standard Flue air intake hood on top of the boiler can be replaced by a special two pipe flue adapter i 9 2 i82 1 2 0 242 1 2 6 5 235 160 157 480 80 80 1 2 2 1 S...

Страница 29: ...601 29...

Страница 30: ......

Страница 31: ......

Страница 32: ...t Midlands B76 8DH Sales 0121 3523500 Fax 0121 3523510 ALL SPECIFICATIONS SUBJECT TO CHANGE Cod 3540254 2 05 97 Phone numbers Installer Service Engineer BECAUSE OF OUR CONSTANT ENDEAVOUR FOR IMPROVEME...

Отзывы: