Ferroli GNK1 02 Скачать руководство пользователя страница 12

12

5. TESTING

5.01 Before the first light of the boiler

Before the first light of the boiler follow these check list:

a)

check the system and the boiler is filled with water at the right pressure;

b)

check against any leakage of water fuel;

c)

check that the correct electric power is supplied to the unit;

d)

check  size  and  perfect  flue  installation.  Flue  must  not  be  placed  near flammable materials;

e)

check against any type of flammable materials where the boiler is installed;

f)

check the burner has the right heat input according to the boiler size;

g)

control that the water valves are open.

5.02 First lighting

After the boiler preliminaires checking, the appliance can be lights in the following way:
1)

Open the fuel gate valve.

2)

Set the «Summer/Winter» switch to one of the two settings.

3)

Regulate the boiler and heater thermostats to the required values.

4)

Shut the switch upstream of the boiler together with that on the control panel.

After above operations the burner will start to run and the boiler will begin to work.

5.03 After the first lighting

After the first lighting it is advisable check:
Burner works properly, this checking must be done by appropriate instruments.
Thermostats operate correctly.
Water flows through the system and in the boiler.
Smoke gases evacuate through the flue duct.

5.04 Switch off

To turn off the unit for a short period it is enough to switch off the switch on the control panel.
If the boiler has to be stopped for long period beside to act by the switch on the control panel, it is
necessary to cut the supply of fuel by mean of the gate valve, in winter season, to avoit damages due
to the frost it is necessary to add the antifrost liquid in the system and to drain the boiler.

6. SERVICE

The after sale service must be carried out only by Qualified Plumbers. It is advise to service the boiler
at least once a year, before the winter season. Checks must include the boiler cleaning, the perfect
operation of the controls and the burner.
Furthermore the flue duct conditions have to be inspected.
The frequency with which the protecting anode of the heater should be inspected will be established
by the agressivity of the mains water. The interval between one inspection and the next should not
exceed 2 years.

Содержание GNK1 02

Страница 1: ...GNK1 CAST IRON SECTIONAL BOILER FOR HEATING AND PRODUCTION DOMESTIC HOT WATER INSTALLATION AND USE INSTRUCTIONS...

Страница 2: ...2...

Страница 3: ...3 INDEX 1 Technical informations 2 Dimensions and technical data 3 Packing and shipping details 4 Installation 5 Checking 6 Service 7 Optional 8 Boiler components...

Страница 4: ...has reached the value set on the ambient thermostat the burner and circulator stop until heat is again required by the heating system or heater If the heater becomes cooled during the heating phase fo...

Страница 5: ...ycontrolstheburner during the heating phase Room thermostat not supplied This device is not supplied but can be fitted by installer it is connected in series to the control thermostat and it manages b...

Страница 6: ...r e t a w r e l i o B t n e t n o c x a m W H D e r u s s e r p r e t a w r e t a w k n a T t n e t n o c w o l f W H D h t i w 0 3 t C r a b C m d 3 r a b m d 3 n i m 0 1 l h l 2 0 1 K N G 4 0 1 1 0...

Страница 7: ...ertia which develops when the circulator stops could inhibit the boiler itself total switch off owing to activation of the safety thermostat at 100 C To prevent this inconvenience the plant has been e...

Страница 8: ...expansion tank not supplied 11 Boiler thermostat 12 Safety thermostat 13 Thermometer boiler 14 Thermometer boiler 15 Safety thermostat 16 Circulating pump thermostat 17 Boiler shell 18 Burner 19 Cock...

Страница 9: ...cerning building and location of the chimney 4 01 Electrical connection Proceed to wire pump burner and optional room thermostat According to the wiring diagrams fig 19 and to the directions attached...

Страница 10: ...e fittings in the boiler Valve settings must be 3 bar for the heating circuit and 6 bar for the sanitary circuit It is advisable to mount manual on off valves between the boiler and the two heating an...

Страница 11: ...oof against high temperature and corrosion Its length must be as short as possible with the least number of curves Where flue sections have to be connected it is advised pay attention to avoid leaking...

Страница 12: ...5 03 After the first lighting After the first lighting it is advisable check Burner works properly this checking must be done by appropriate instruments Thermostats operate correctly Water flows throu...

Страница 13: ...leaning Shut the sanitary water on off valve at the heater inlet and completely drain the water from the heater itself Remove the flange from the front side of the heater Wash and dry the heater Repla...

Страница 14: ...LS 7 01Programmer clock 1 Remove plug A from the control panel 2 Fit clock B into its housing 3 Fix with screws C 4 Remove the jumper between terminals 11 12 and connect the clock cables as shown in t...

Страница 15: ...ect the activation times can be at a frequency of 15 minutes a time each mobile rod The lever switch near the pointers enables the following operations 1 Set the lever to position I ti inhibit heater...

Страница 16: ...16 Fig 10 8 BOILER COMPONENTS...

Страница 17: ...PUMP FITTING OT58 16 34010220 FIXED BRACKET EXTENSION 17 34204000 BICONAL NIPPLE 18a 34223660 TUBE 18b 34223670 TUBE 18c 34223680 TUBE 19a 34400010 TIE ROD 19b 34400910 TIE ROD 19c 34403010 TIE ROD 2...

Страница 18: ...18 Fig 11 61 62...

Страница 19: ...IC 47a 31133680 REAR PANEL 47b 31133690 REAR PANEL 47c 31133700 REAR PANEL 48 31000210 SPRING 49 35000640 TUBE BRUSH 50 35001820 PLUG 51 35002520 KNOB 52 35003130 FACIA PANEL 53 36100340 SWITCH 54 364...

Страница 20: ...37047 San Bonifacio VR Italia tel 045 6139411 tlx 480172 fax 045 6100233 6100933 Cod 3540573 0 07 97...

Отзывы: