To open the boiler casing
:
1.Undo the screws “1” (see fig. 41).
2.Pull the panel outwards and lift it.
fig. 41- Front panel opening
B
On this unit, the casing also acts as a sealed chamber.
After any operation involving opening the boiler, care-
fully check the correct refitting of the front panel and
its seal.
Proceed in reverse order to refit the front panel. Make sure it is correctly hooked to the upper fas-
tenings and is correctly positioned at the sides. Once the screw
"1”
is tightened, the head must
not be below the lower reference fold (see fig. 42).
fig. 42- Correct position of front panel
2
3
1
1
OK
NO
1
1
Содержание BlueHelix HiTech RRT C
Страница 45: ...BlueHelix HiTech RRT C 45 IT cod 3541V300 Rev 00 02 2021 fig 48 fig 49 fig 50 5 6 6 ...
Страница 104: ...BlueHelix HiTech RRT C 104 ES cod 3541V300 Rev 00 02 2021 fig 48 fig 49 fig 50 5 6 6 ...
Страница 163: ...BlueHelix HiTech RRT C 163 RO cod 3541V300 Rev 00 02 2021 fig 48 fig 49 fig 50 5 6 6 ...
Страница 221: ...BlueHelix HiTech RRT C 221 PL cod 3541V300 Rev 00 02 2021 wygląd 48 wygląd 49 wygląd 50 5 6 6 ...
Страница 280: ...BlueHelix HiTech RRT C 280 EL cod 3541V300 Rev 00 02 2021 İȚț 48 İȚț 49 İȚț 50 5 6 6 ...
Страница 339: ...BlueHelix HiTech RRT C 339 EN cod 3541V300 Rev 00 02 2021 fig 48 fig 49 fig 50 5 6 6 ...
Страница 354: ......
Страница 355: ......