FERRO-TRAIN ÖBB 2095 Скачать руководство пользователя страница 6

2095 Sound 

 

The sound project is designed for the H0e 

model  of  the  company  Ferro  Train  / 

Stängl  Modellbahnen.  The  CV  settings 

should  be  changed  only  gently  to  ensure 

the  interaction  of  driving  and  sound 

dynamics. 

 

In the event of completely misaligned CV 

values,  the  delivery  condition  can  be 

restored using CV8 = 8 (for values of the 

sound project). 

 

Function  keys  can  be  changed  by  CV 

400ff, e.g. currently whistle on F2 should 

be placed on F4: CV402 = 4 

(

http://www.zimo.at/web2010/document

s/Zimo%20Eingangsmapping.pdf

 

 
 

 

 

 

 

Changed CVs: 

 

CV # 3 = 22 acceleration time 

CV # 4 = 16 delay time 

CV # 5 = 125 speed Max. 

CV # 6 = 65 speed min. 

CV # 9 = 95 engine reg. Period / length 

CV # 29 = 14 DCC config 

CV # 35 = 3 feet 'mapping F1 

CV # 36 = 12 feet 'mapping F2 

CV # 56 = 35 motor control PI values 

CV # 57 = 140 engine reg. Referenzspg. 

CV # 125 = 88 Effects Lvor 

CV # 126 = 88 Effects Lr 

CV # 127 = 88 effects FA1 

CV # 128 = 88 effects FA2 

CV # 154 = 16 ZIMO Config 2 (Binary) 

CV # 158 = 12 ZIMO Config 3 (binary) 

CV # 190 = 5 Effects Dim 

CV # 191 = 2 effects Dimming 

CV # 266 = 65 total volume 

CV # 273 = 10 startup delay 

CV # 275 = 200 volume Const. Slowly 
CV # 276 = 180 volume Const. Fast 

CV # 282 = 10 Duration of Acc. [0.1s] 

CV # 283 = 200 volume when accelerating 

CV # 285 = 1 Duration of delay Volume. [0.1s] 

CV # 286 = 200 volume at delay 

CV # 288 = 110 Brake Squeak Minimum Travel Time [0.1s] 

CV # 307 = 128 curve squeal inputs 

CV # 308 = 6 curve squeal button (1-28) 

CV # 313 = 109 mute button 

CV # 314 = 45 mute fade time [0.1s] 

CV # 315 = 25 Z1 min Interval 
CV # 316 = 25 Z1 Max Interval 

CV # 317 = 10 Z1 playing time [s] 

CV # 318 = 100 Z2 min interval 

CV # 319 = 150 Z2 Max Interval 

CV # 320 = 8 Z2 playing time [s] 

CV # 374 = 7 Coasting button 

CV # 375 = 2 Coasting Level 

CV # 387 = 60 Diesel Level Acc. Dep. 
CV # 388 = 80 Diesel Level Delay Dep. 

CV # 389 = 165 Diesel Level Acceleration Limit 

CV # 395 = 65 Max. Volume 

CV # 396 = 14 Volume down key 

CV # 397 = 13 Volume up key 

CV # 519 = 25 F3 sound number 

CV # 522 = 26 F4 sound number 

CV # 525 = 21 F5 sound number 

CV # 540 = 17 F10 sound number 

CV # 541 = 91 F10 volume 

CV # 543 = 16 F11 sound number 

CV # 544 = 91 F11 Volume 

CV # 546 = 22 F12 sound number 

CV # 547 = 181 F12 volume 

CV # 575 = 20 Ri'change 'Sou'Nr 

CV # 576 = 46 Ri'change 'Lautst 

CV # 577 = 19 Squeak 'Sou'Nr 

CV # 578 = 91 Squeaky Volume 

CV # 581 = 18 Start whistle Sou'Nr 

CV # 582 = 181 beginning whistle volume 

CV # 603 = 24 n.a. 

CV # 744 = 23 Z1 sound number 

CV # 745 = 64 Z1 volume 

CV # 746 = 8 Z1 loop info 

CV # 747 = 23 Z2 sound number 

CV # 748 = 64 Z2 volume 

CV # 749 = 72 Z2 loop info 

 

Sound samples: 

16 209501 uncoupling.wav 

17 209501 Coupling.wav 

18 209501 Brake release quickly.wav 

19 brake.wav 
20 changes of direction 2095.wav 

21 Schaffner whistle 

22 Tür_2095 on zu.wav 

23 compressor.wav 

24 curve squeals 

25 Horn_209505_kurz.wav 

26 Horn_209505_lang wet.wav 

 

Warranty and service: 

A-1100 Vienna, Favoritner Gewerbering Object 25 Tel: +43 1 802 03 85 Fax: 15 [email protected] 

Invoice address: FERRO-TRAIN Vertriebs-Ges.m.b.H., A-1130 Vienna, Maygasse 29            © FERRO-TRAIN GmbH 

 

 

 

directional headlight 

 

shunting lights (both sides) 

 

directional red teil light 

horn high 

 

horn low 

 

conductor's whistle 

 

curve squeals 

Only while driving 

Coasting 

engine sound at gear level 1 

Sound on / off 

 

Mute 

 

10 

couple 

 

11 

uncouple 

 

12 

 

sound louder 

13 

 

sound quieter 

 

Compressor 

random sound 

Содержание ÖBB 2095

Страница 1: ...hnen hat bis 2017 alle Modelle mit Faulhaber Motor ausgeliefert was sehr guter Fahreigenschaften und hohe Laufruhe garantiert Wenn Sie das Up Grade 205 FAULHABER bei der Bestellung gew hlt haben liefe...

Страница 2: ...hrer Wahl aus Testen Sie nun die Funktion des Umbaus So sollte zuerst eine Pr fung z B Adresse abfragen auf dem Programmiergleis erfolgen Anschlie end ist eine Messfahrt Streckenl nge 115 cm notwendig...

Страница 3: ...l CV 317 10 Z1 Abspieldauer s CV 318 100 Z2 Min intervall CV 319 150 Z2 Max intervall CV 320 8 Z2 Abspieldauer s CV 374 7 Coasting Taste CV 375 2 Coasting Stufe CV 387 60 Diesel Stufe Beschl Abh ngigk...

Страница 4: ...g 205 FAULHABER St ngl Modellbahnen delivered all models with Faulhaber motor until 2017 which guarantees very good driving characteristics and very smooth running If you have chosen the Up Grade 205...

Страница 5: ...ur choice Now test the function of the conversion So first a check for example address query should be done on the programming track Then a test drive distance 115 cm is necessary Close the model by p...

Страница 6: ...ime s CV 318 100 Z2 min interval CV 319 150 Z2 Max Interval CV 320 8 Z2 playing time s CV 374 7 Coasting button CV 375 2 Coasting Level CV 387 60 Diesel Level Acc Dep CV 388 80 Diesel Level Delay Dep...

Страница 7: ...M fiez vous des ar tes vives Attenzione Pericolo di lesioni se gestita in modo improprio Attenzione ai bordi taglienti Questo modello non un giocattolo Attenzione Questa lista dei modelli non un gioca...

Отзывы: