background image

 

H-H ( 1 : 50 )

 

D

H

H

J

PRO-500-099 Mud box (with roof)

29/08/2019

Page:

Product Range:

PROPRIETARY AND CONFIDENTIAL

 

THE INFORMATION CONTAINED IN THIS

DRAWING IS THE SOLE PROPERTY OF

FENLAND LEISURE PRODUCTS.  ANY 

REPRODUCTION IN PART OR AS A WHOLE

WITHOUT THE WRITTEN PERMISSION 

OF FENLAND 

LEISURE PRODUCTS IS PROHIBITED.

Tel: 01354 638359   Fax: 01354 638464 www.fenlandleisure.co.uk

A3

UNLESS OTHERWISE SPECIFIED:
DIMENSIONS ARE IN MILLIMETERS
TOLERANCES:
        LINEAR:                    2MM
        1 DECIMAL PLACE:  0.5MM
        ANGULAR:                1

DO NOT SCALE FROM DRAWING

Playground Equipment

Title:

Date:

4. POSITION THE UNIT IN THE FOUNDATION HOLES AND CHECK THAT THE 
   UNIT IS LEVEL AND TOUCHING THE GROUND ON ALL SIDES.

7. ENSURE THE UNIT IS LEVEL AND PLUMB, ALL FIXINGS HAVE BEEN TIGHTENED 
    AND PROTECTIVE CAPS ARE IN PLACE. ADD CONCRETE TO EACH FOUNDATION 
    HOLE AND LEAVE FOR 48 HOURS. ONCE THE CONCRETE HAS BEEN ADDED 
    POSITION THE HDPE COVER OVER THE BASE AND LEAVE FOR 48 HOURS.

6. POSITION THE ROOF OVER THE VERTICAL POSTS AND SECURE IN PLACE 
    USING THE FIXINGS PROVIDED. ENSURE THAT CAPS ARE FITTED WHERE
    INDICATED. 

5A. IF THE ROOF HAS BEEN SUPPLIED ASSEMBLED MOVE TO STEP 6.
 
5B. IF THE ROOF IS NOT ASSEMBLED REFER TO MOD-600-078 ASSEMBLY
     INSTRUCTIONS FOR MORE INFORMATION. 

3

8

7

8

5

1

0

0

,0

0

R

E

F

E

R

 T

O

 P

A

G

E

 2

300,00

4

5

,0

0

CONCRETE

Отзывы: