6
Electrical installation
The panel is fitted with a two- conductor cable for 1/N 230 V / 50 Hz with a plug for connection into a socket.
If the supply cord of the appliance is harmed, it must be replaced by producer or its service engineer or by similar qualified
person to prevent creation of a danger situation.
Panel control
With the help of the BPT- SP unit and SP2 receiver, for setting see the instruction manuals for the products.
The BPT- SP unit and
the SP2 receiver are joined during manufacture.
The panel is also equipped with brake thermostat, which ensures that maximum temperature does not exceed 80°C.
Panel dismounting
Before loosening of mounting consoles, we disconnect the panel from the mains by means of double pole switch. With use of
tools, please, loosen mounting screws and lift the panel vertically upwards in such a way to loosen consoles out of screws.
Next, it is necessary to disconnect the feeder cable from the box on the wall.
Notice
Any intervention in the panel can be performed only by a qualified person. Before beginning such a work, the panel must be
disconnected from the current source. Because it is a fragile material, it is necessary to take care during transfer, handling and
mounting.
Pict.5
Pict.6
W A1
(mm)
B1
(mm)
C1
(mm)
D1
(mm)
300 460 220 430 220
500 660 220 530 220
700 800 220 530 250
900 800 220 730 300
W A2
(mm)
B2
(mm)
C2
(mm)
D2
(mm)
300 260 220 630 220
500 360 220 830 220
700 360 250 1000 220
900 560 300 1050 220