Feniex QUAD Q-1700 Скачать руководство пользователя страница 3

Feniex Industries, Inc.
1.800.615.8350
 /

 

feniex.com

3

Use QR Codes for surface 

prep and tape instructions:

Use the QR 

link for the 

surface 

preperation 

instructions:

Use the QR 

link to the 

descriptions 

of 3M tape:

CLEANING INSTRUCTIONS

Feniex University
Watch our instructional videos 
at Feniex University to see an 
in-depth look at our product's 
features and functions. 

Use the link below:

feniexuniversity.com

1. To obtain optimum adhesion, 

use a non-amonia based 

degreaser to clean the surface 

you will adhere the mount to.

2. Place tape inside the mount 

and press onto back of pillar 

with 15 psi's of pressure. Full 

adhesion is reached after 72 

hours. Refer to 3M Surface 

preparation document for 

detailed instructions.

SPECIFICATIONS

Voltage

10-18 Volts DC

Current Draw  5 Amps

 

Warranty

5 years

Отзывы: