
· MANUFACTURING FOR INDUSTRIAL AUTOMATION
The instrument is provided with the following elements :
• 1 x instrument
EBR
• 1x plug-in screw terminals, connected to the instrument (for input signal and power)
• 2x metal side fixations for panel mount
• 1 x quick installation guide
2. Material included
3. Additional documentation
User’s manual EBR
www.fema.es/docs/5495_EBR_manual_en.pdf
Datasheet EBR
www.fema.es/docs/5497_EBR_datasheet_en.pdf
Quick installation guide EBR
www.fema.es/docs/5499_EBR_installation_en.pdf
CE Declaration of conformity
www.fema.es/docs/5250_CE-Declaration_MBR_en.pdf
Warranty
www.fema.es/docs/4153_Warranty1_en.pdf
Web
Scan the QR code to directly
access the user’s manual of
this instrument.
Security
EN-61010-1
Electromagnetic C.
EN-61326-1
50
1969-2019
YEARS
Q
Certified Quality
ISO 9001
5
Extended Warranty
YEARS
Process
±20 mA
Process
±10 Vdc
Process
0/10 Vdc
Process
4/20 mA
4. How to order
Table 1
|
INPUT SIGNAL CONNECTIONS
INPUT
signal
Input terminals
1
2
3
4/20 mA
mA+
mA -
0/10 Vdc
comm.
+ Vdc
±20 mA
± mA
comm.
±10 Vdc
comm.
± Vdc
Table 2
|
POWER CONNECTIONS
POWER
Power terminals
4
5
24 Vdc ±10%
(isolated)
+ 24 Vdc
0 Vdc
1. Installation and start-up
1. Read how to operate the instrument (see section 9)
2. Install the instrument at the panel
• consider to move the panel installation to the last step if your panel prevents access to
the rear configuration keys.
3. Connect the power supply to power-up the instrument (see section 5)
• for a list of display errors see section 11
4. Connect the input signal to the instrument (see section 5)
5. Configure the input signal (see section 10)
• default configuration is 4/20 mA=0/100 %
• if you need as different reading, operate span and offset configurations to adjust the read-
ing to your needs.
6. Modify the offset (see section 9) if needed
7. Modify the span (see section 9) if needed
Access the user’s manual (see section 3) for detailed explanations. Do not
forget to read the ‘
installation precautions
’ section at the user’s manual.
When the marks ‘
Attention
’ or ‘
Risk of electrical shock
’ appear, read
the documentation for information about the nature of the risk.
6. Dimensions and panel cut-out ‘mm’ (in)
1.
Remove the two metal side fixations at the sides of the instrument.
2.
Insert the instrument, through the panel front, into the panel cut out.
3.
Place again the two metal side fixations, and screw them against the panel.
7. How to panel the instrument
Power 24 Vdc isolated, consumption <2 W
Power fuse 200 mA time-lag
fuse
5. Connections
Vdc signal
common
mA signal
power +24 Vdc
power 0 Vdc
1 2 3
-
+
4 5
O+
Offset
O-
S+
S-
Span
Input
I+ I-
Table 3
|
FRONT VIEW
100%
75%
50%
25%
0%
Bar graph
Percentage
Table 4
|
HORIZONTAL AND VERTICAL MOUNTINGS
100%
75%
50%
25%
0%
100%
75%
50%
25%
0%
Panel
cut-out
21.5 mm
(0.85 in.)
92.5 mm
(3.64 in.)
24 mm
(0.95 in.)
96 mm
(3.78 in.)
100%
75%
50%
25%
0%
8. Front view
Reference
Description
EBR
Indicador de barra
EBR.1442
Indicador de barra con personalización
(0.31 in.)
(0.60 in.)
15
8
55 mm
(2.16 in.)