Kernbohren Metall
Assembly
C-SC_CSSM
Version 1.0
01.04.2019
Page
64
of
89
All rights reserved by FEIN, especially in case of property rights applications.
FEIN retains all rights of disposal, such as copying and circulation.
9.1.11 Positioning the control panel
Steps that must be completed:
-
Assembling the electronics
-
Positioning the electronics
-
Assembling the control panel
Tool(s):
-
Torx T20
1.
Connect all plug connections (
1
) as shown in the
connection diagram.
2.
Position the cover (
2
).
3.
Position the holder (
3
).
4.
Screw in the screw [4x48] (
4
) [2.0±0.3 Nm].
5.
Screw in the screw [4x35] (
5
) [2.0±0.3 Nm].
6.
Screw in the two screws [4x18] (
6
) [2.0±0.3 Nm].
7.
Screw in the two screws [4x48] (
7
) [2.0±0.3 Nm].
1
4
3
2
5
6
7