
KBE 35 N24; Holemaker III
7. Assembly
C-SC_CSSM
Version 1.0
2019-02-15
All rights reserved by FEIN, especially in case of property rights applications.
FEIN retains all rights of disposal, such as copying and circulation
.
Page
56
of
61
Fitting the electronics
1. Install the two buttons (1).
2. Install the switch (2).
3. Connect all cables (3) as shown in the connection diagram.
4. Position the holder (4).
5. Screw in the
screw “4x48” (5) [2.0 Nm
±0.3 Nm
].
6.
Screw in the screw “4x35” (6) [2.0 Nm
±0.3 Nm
].
7. Fit the cover (7).
8.
Screw in the two screws “4x18” (8) [2.0 Nm
±0.3 Nm
].
9.
Screw in the two screws “4x48” (9) [2.0 Nm
±0.3 Nm
].
Tools:
- Torx T20
1
2
3
4
5
6
7
8
9
Picture similar