![Fei Bao SU-27 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/fei-bao/su-27/su-27_assembly-manual_3855899016.webp)
Temporarily position the intakes in place to
make sure you have clearance. See photo.
Once everything is in place to your satisfaction,
mark the pickup and vent fixture positions.
Remove the tanks, plumb, leak check and
reinstall.
Drill fuse for vents and plumb. See photo.
At this time, permanently reinstall the intakes,
making sure no lines or wires are pinched or
kinked, securing with two forward intake attach
bolts. Make sure they engage the blind nuts
fully, but do not penetrate the inside of the
intake. It is important that these two bolts be
attached securely.
FB Su-27
Page 16