Feeney DesignRail LED 40W-DK Скачать руководство пользователя страница 3

1-800-888-2418 | www.feeneyinc.com

3

POST ACCENT LIGHT - WIRING DIAGRAM

3

1

2

4

5

6

7

5

6

1. 

Power (by customer)

2. 

Light Switch (by customer) 

1

3. 

24v Dimmable Driver 

2

4. 

LED Starter Cable (20')

5. 

LED 2-Way Splitter

6. 

LED Post Accent Light

7. 

LED Extension Cable (132")

LIGHTING COMPONENTS:

1. Mount ver  cally only. See Switch Compatabilty 

Spec Sheet at www.feeneyinc.com

2.  See Driver Spec Sheet at www.feeneyinc.com

1
2
3
4
5

7

6

Determine loca  on of driver.  

Note: It is best to locate the drivers as close as 
possible to the ligh

 ng to reduce the possibility 

of voltage drop occuring.  If possible, the driver 
should be within 15 feet of the post that will 
accept the 20' starter cable.

Route exterior rated wiring from compa  ble 
dimmer switch/AC power source to loca  on of 
driver.
Connect drivers to dimmer switch/AC power 
source.
Connect 20' starter cable and route from driver 
to post using supplied wire nuts.

Step 1 - Install Drivers

Step 1A – Connect Source Power to Driver

IMPORTANT SAFETY NOTE: TO REDUCE RISK OF ELECTRICAL SHOCK, TURN OFF AC CIRCUIT BREAKER PRIOR TO COMMENCING ANY ELECTRICAL WORK AND 

CONNECTING DRIVER(S) TO AC POWER SOURCE.  VERIFY THAT LIVE POWER IS NOT PRESENT AT JUNCTION BOX WHEN MAKING CONNECTIONS.

Содержание DesignRail LED 40W-DK

Страница 1: ...Ligh ng DesignRail LED Ligh ng may not be suitable for every applica on and it is the sole responsibility of the installer to ensure that DesignRail LED Ligh ng is used for its intended purpose WARNING ELECTRIC SHOCK IS ALWAYS POSSIBLE WHEN WORKING WITH ELECTRICITY THIS CAN CAUSE SERIOUS PERSONAL INJURIES OR DEATH ELECTRICAL SHORTS CAN ALSO CAUSE FIRES AND PROPERTY DAMAGE ALWAYS MAKE SURE THE ELEC...

Страница 2: ...x Wire Nuts Pair 1x Isola on Bushing 60W Driver Kit SKU LED 60W DK 1x 60 Wa Dimmable Driver 1x Starter Cable 20 1x Wire Nuts Pair 1x Isola on Bushing 96W Driver Kit SKU LED 96W DK 1x 96 Wa Dimmable Driver 1x Starter Cable 20 1x Wire Nuts Pair 1x Isola on Bushing LED 2 WAY SPLITTER SKU LED 2WAY LED EXTENSION CABLE 132 SKU LED EXT132 LED STARTER CABLE 20 SKU LED STC Post Accent Light Components LED ...

Страница 3: ...le to the lighࢼng to reduce the possibility of voltage drop occuring If possible the driver should be within 15 feet of the post that will accept the 20 starter cable Route exterior rated wiring from compa ble dimmer switch AC power source to loca on of driver Connect drivers to dimmer switch AC power source Connect 20 starter cable and route from driver to post using supplied wire nuts Step 1 Ins...

Страница 4: ... BETWEEN INSIDE POST WALL AND STANCHION WIRE RUNS UNDER DECK THROUGH FASCIA BOARDS AND ENTERS POST BELOW DECKING SURFACE BETWEEN FACSIA AND POST FACE WIRE RUNS UNDER DECK AND ENTERS POST ABOVE FASICA BRACKET BELOW DECKING WIRE RUNS UNDER DECK THROUGH 3 4 HOLE IN BASEPLATE AND BLOCKING 3 4 HOLE DRILLED BY CUSTOMER Figure 1 2 For systems with Series 200 300 350 or 450 top rail Fish the connector for...

Страница 5: ...ll 1 2 diameter hole Pull one branch of the LED 2 way spli er out through drilled hole between RCB holes and a ach LED Extension Cable to the other branch See Figure 1 5 IMPORTANT NOTE Maintaining the polarity at all con nec on points is cri cal Constant alignment verifi ca on of the of the posi ve and nega ve signs will guarantee less problems and rework Use masking tape to temporarily secure sta...

Страница 6: ... Series 200 300 350 or 450 top rail String an extension cable between each post and connect a 2 way spli er Feed one branch of the spli er out through the 1 2 lead wire pilot hole drilled in the previous step this becomes the lead wire for the light at this post Feed the other branch of the 2 way spli er over the top of the post and connect an extension cable See Figure 2 3 Note A 2 way spli er do...

Страница 7: ...he spli er out through the 1 2 lead wire pilot hole drilled in the previous step this becomes the lead wire for the light at this post Feed the other branch of the 2 way spli er through the 1 2 hole and the hollow of the RCB and connect an extension cable See Figure 2 4 Note A 2 way spli er does not need to be used at the final post as the extension cable will connect to the final light to complet...

Страница 8: ...the moun ng plate by inser ng back plate into angled receiver flanges on moun ng plate See Figure 3 4 Step 3D Secure Lens Secure the lens and the moun ng plate to the post using two of the provided 8 x 3 4 self tapping screws See Figure 3 5 Step 3E A ach Cover A ach the cover onto the moun ng plate by aligning the tabs on the cover with the slot on the sides of the moun ng plate and sliding the co...

Страница 9: ... Figure 4 1 Step 4B Adjust LED Array Bracket Slide the LED array bracket up or down to acheive desired light aperture See Figure 4 2 Step 4C Tighten LED Array Bracket Once the LED array bracket is in the desired loca on ghten the nut on the LED array bracket See Figure 4 3 Step 4D Re a ach Cover Slide the cover down un l it comes in contact with the lens See Figure 4 4 Figure 4 1 Figure 4 2 Figure...

Страница 10: ... on AC circuit breaker 5 Power up the driver and check all LED loca ons for illumina on Scenario 2 Some LED locaঞons are illuminated but others are not 1 Note which loca ons are not illumina ng 2 Turn off AC circuit breaker prior to con nuing to next procedure 3 Rotate the connector 180 degrees at each noted loca on where the array is not illumina ng 4 Repeat at all noted loca ons that did not illu...

Страница 11: ...www feeneyinc com 1 800 888 2418 2021 Feeney Inc 10 21 ...

Отзывы: